ML20135B240
| ML20135B240 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 05/31/1985 |
| From: | Thom T TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20135B118 | List: |
| References | |
| NUDOCS 8509100490 | |
| Download: ML20135B240 (1) | |
Text
_
.o 14 9
- Corrected OPERATING DATA REPORT DOCKETNO. 50-259 DAIE 2/1/85 COMPLETED BY
_I.
Thom_
TELEPilONE 1205) 729-3834 OPERATING STATUS
- 1. Unit Name:
Browns Ferry One Notes
- 2. Reporting Period:
January 1985
- 3. Licensed Thermal Power IMwt):
3293
- 4. Nameplate Rating (Gross MWe):
1152 f
- 5. Design E!cetrical Rating (Net MWel:
1065 j
- 6. Maximum Der endable Capacity IGross MWel:
1098.4
- 7. Maximum Dependable Capacity INet MWe):
1065
- 5. If Chango Oectar in Capacity Ratings litems Number 3 Through 7) Since Last Report. Gi.e Rea
.n.
N/A
- 9. Power Lesel To which Restricted,if Any INet \\lweg.
WA
- 10. Reawns For Restrictions. If Any:
N/A This Month Yr.ro Date t maulatne I1. Ifours in Reporting Pennd 744 744
- 12. %nnber of !!nurs ite2ctor was Critical 542.33 542.33
- _92 144 3
j.8 415.91 2
13 Reaernr Re erse Shutdown flours 201.67
_201.67 6,686.89
!4. linurs Graerator 0 t Line 521.22 5.2_L22 J L 1 5 1_. 8 1..,
- 15. Unit Re ene St.utdown !!nurs 0
0 0
it,. Grow thermil Enerp Generated lMWili 1.595.297
- 168,066,787
- 4,950,821 17 t rus. Elestrical I.nergy Generated I'.thth 524.930_._.
524.950 14 Net E!cettical Energy Gener,ted IMWlO 508.661 508.661
_ 54.27A 430 _.
- 52. 72M82 19 Unit Senice Fastor 70.1 70.1 62.0 Ill Unu Asadainlity Factor 70.1 70.1 62.0
~
l Umt lapacies Factur IUsing MDC Net
-64.2 64.2 53.7
~~
2.'
Umt Cyicity Fateur IUsing DER Net, 64.2 64.2 53.7
~~
- 23. Unit Furted Outage Rate 20.2'
.20.2 22.1
- 24. Shutdowns Scheduled Over Nest 6 Munths e f> pe. Date. and Duration ni iaih n 25 If Shur Down At End Of Report Period. Estunated Ibic of Startup-
- ti. Umts in fest Statin IPrior in Commercial Operasmni.
Fm s c.nt h ines t d INITI \\ L CRlilCALITY INI flA L ELECTRICITY CO\\l%IERCIA L OPER A flON
'A7 R
s
v.
11 e
- Correeted
/
OPERATING DATA REPORT DOCKET NO..50-254 i
DATE.5.1-N._
.. COMPLETED BY T -
_T'.' em TELEPHONE.205,'J23-T C OPERATING STATUS
- 1. Unit Name:
Browns Ferry One N5
- 2. Reporting Period:
May 1985 l
- 3. Licensed Thermal Power (MWt):
3293
- 4. Nmeplate Rating (Gros MWe):
1152
- 3. Devsn Electncal Rating (Net MWe):
1065
- 6. Maximum Dependable Capecify (Cross MWe):
1098.4 l
- 7. Maximum Dependable Capacity (Net MWe).
1065
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted. lf Any MWel:
N/A'
- 10. Reasons For Restrictions. lf Any:
This Month Yr..to.Date Cumula tr..-
II. Ilours la Reporting Period 744 3,623 95,023
- 12. Numbes Of Hours Reactor Was Critical 0
_1647.78 59.521.39
- 13. Rescror Reserve Shutdown Hours 0
512.22 6.997.44
~
- 14. Hours Generatoe On Line 0
_1,626.67 58,267.75
- 15. Unit Rewrve Shutdown flours U
U U
~
I6. Grou Thermal Energy Generated (MWH) 0
- 4 950.824
- 168,066,787 17 Gran Electrical Energy Generated (MWH)
U
_.. 3,,652,650 55,396.1N ~
- 18. Net Electrical Energy Generated (MWH)
-6.989 1.589 g1g
_ g q _ gn, g, 3 i
- 19. Unit Service Facto, 0
44.9
_61.3
~
- 20. Unit Availability Facto, 0
44.9 61.3
~
- 21. Unit Capacity Factor (Using MDC Net) 0 41.2
~~
_53.2
- 22. Unit Capacity Factor (Uning DER Nt) 0 41.2
~
_53.2
- 23. Unit Forced Outage Rate 100 55.1 23.6
- 24. Shutdowns Scheduled Over Next 6 Months iType. Date, and Duration. of Each t:
June 1, 1985 - Refuel Sutage bhains.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Tew Status IPrior o Commercial Operationi:
Forecau Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION n.