38
- m. r2 ara torco an NUCLEAR PLANT OPERATING STATISTICS
- Corrected Brovnn Farry Nuclear Plant M..
744
.Miod Hours Month March 19 85_
Item No.
Unit No.
Unit-1 Unit-2 Unit-3 Plant l
1 Averace Hourty Gross t.oad. kw 985.558 0
1,072,171 1,013,968 g
2 Mawimum Hour Net Generation. Mwh 1031 0
1086 2079 e
s
.,, 3 Core Thermal Energy Gen. GWD (t12
- sa_1ggi 0
26.9945 481.1826 4
4 Steam Gen. Thermal Energy Gen.. GWD (t)2 3'
5 Gross Electrical Gen.. Mwh 427.190 0
226,830 654,040
?~ 6 station Use. Mwn 14.788 2,528 11,675 28,991 3
7 Net Electrical Gen.. Mwh 412.402
-2,528 215,175 625,049 di a
statien use. percent 3.46 0
5.15 4.43
) 9 Accum. Core Avg. Exposure. MWD / Ton!
18.401 10 11.012 29.413 10 CTEG This Month.100 BTU 4.4 %.116 0 22 20.739 6.654.A55 6
11 SGTEG This Month.10 BTU
.t I 12 8
! 13 Hours Reactor Was Critical 433.45 0
213.70 647.15 l
~.
l 14 Unit Use. Hours. Min.
433:27 0
211:35 645:02 l
15 Capacity Factor. Percent 52.3 0
27.8 26.7 j
16 Turbine Avsil. Factor. Percent 100 0
100 66.7 17 Generster Avait. Fneter. Parcent 100 0
101) f.:6. 7
,3 66.7 p
18 Turbcaen. Avait. Factor. Percent 100 0
100 __
60.6 19 Peador Avail F3 dor Percent 100 0
31.9 i 20 Umt Avail Factor. Dereent 58.3 0
28.4 28.9 l
! 21 Tumine startues 0
0 0
0 W! 22 Rexter co d startues 0
0 0
0 e
.jh '4 2
2 Gross Heat Rate. Btu /kwh 10.380 0
9. F40 l 10,180 g
25 Net Heat Aate,8tu/kWh 10.750 0
10.320 10,650 j
i 26
,, I 27 i
.i 28 Thrott:e Pressure. osig 949 0
937 945 ll 29 Tnrottle Temeerature, *F 538 0
537 538
$l 30 Exnaust Pressure. InHg Abs.
1.22 0
1.25 1.23
-j 31 intaxe water Temo.. *F 58.8 0
54.o 57.4 i 32
, l 33 Main Fcedwater, M lb/hr 11.9 0
14.7 12.
34
. 35 36
. 37 Full Power Cacacity. EFPo (3) 34o (4) 375 38 Accum. Cycle Full Power Days. EFFo (3),
- ,79 (4) 39 Oil Fired for Generation. Gaffons
(
25,322 1 t 40 04 Heatino value. etu/Gai.
140,900 l
o' ne3 ceaeratten_ Mwn I ai e
21.0 I
<t 2 I
Max. Hour Net Gen.
Max. Day 43. G7ni
~
'i Load Mwh l
Time Cate MWh l
Date Factor. %
t 43 2079 I
1300 3/1/85 50,113I 3/3/85 40.4 j
Remarks: AFor 8FNP this value is mwd /STU and for SGNP and WBNP this value is MWO/'.iTU l
{
2(t) indicates Thermal Enwgy.
i
'f/D (3)
Informatien Furnished by Reactor Analysis Group. Chatt.'ncora I
3 (4) End of Cvele 5 Refuel Outane 8509100489 850716 l
I 3._.
PDR ADOCK 05000259 l
R PDR l
- e Submitted _
04te Revised P
-. /MW
$.bnt *.,uperm'endtr:t
~ p.g
. :p t_ #
t>.
Y 13
)lp l
- Corrected t..
>;7
- - t Y$
OPERATING D ATA REPORT 50-259
- R DOCKET NO.
>r3 DATE 4-1-85
'+
40MPLETED BY T. Thon TELEPHONE 729-2171 OPERATING STATUS Not'5 Browns Ferry One
- 1. Unit Name:
hd 1, 1985
- 2. Reporting Period:
3293
- 3. Licensed Thermal Power (MWt):
1152
- 4. Nameplate Rating (Gruss MWe):
1065
- 5. Design Electrical Rating (Net MWe):
1C98.4
- 6. Maximum Dependable Capacity (Gross MWe):
1065
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gi e Rea>ons:
N/A N/A
- 9. Power Level To which Restricted.If Any (Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
h This Month Yr..to.Date Cumularise 744 2,160 93,560
- 11. Hours In Reporting Period 433.45 1,647.78 59,521.38
- 12. Number Of Hours Reactor Was Critical 310.55 512.22 o,997.44
- 13. Reactor Reserve Shutdown Hours 433.45 1,626.67 58.267.26
- 14. Hours Generator On.Line 0
0 0
- 15. Umt Reserve Shutdown flour,
- 1,300,514.
- 4,950,821
- 168,066,787
- 16. Gross Thermal Energy Generated (MWH) 427,190 1,652,650 55,398,130 17 Gross E!cctrical Energy Generated IMhH) 412,402 i,603,031 53,816 S52
- 15. Net Electrical Energy Cencrated (MWH) 58.3 75.3 62.3
- 19. Unit Seni:e Factor 58.3 75.3 62.3
- 20. Unit Availability Factor 52.0 69.7 54.0
- 21. Unit Capacity Factor IUsing MDC Neti 52.0 69.7 54.0
- 22. Unit Capacity Factor (Using DER Net) 41.7
_ 24.7 22.2
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
- 25. If Shut Down At End Of Reimrt Period. Estimated Date of Startup:
Foreca>t Achiesed
- 26. Units in Ted Status (Prior to Commercial Operation):.
INITIA L CRITICALITY INITIA L ELECTRICITY j
COMMERCIAL OPER ATION (9/77 )
l
- -