38

m. r2 ara torco an NUCLEAR PLANT OPERATING STATISTICS
  • Corrected Brovnn Farry Nuclear Plant M..

744

.Miod Hours Month March 19 85_

Item No.

Unit No.

Unit-1 Unit-2 Unit-3 Plant l

1 Averace Hourty Gross t.oad. kw 985.558 0

1,072,171 1,013,968 g

2 Mawimum Hour Net Generation. Mwh 1031 0

1086 2079 e

s

.,, 3 Core Thermal Energy Gen. GWD (t12

  • sa_1ggi 0

26.9945 481.1826 4

4 Steam Gen. Thermal Energy Gen.. GWD (t)2 3'

5 Gross Electrical Gen.. Mwh 427.190 0

226,830 654,040

?~ 6 station Use. Mwn 14.788 2,528 11,675 28,991 3

7 Net Electrical Gen.. Mwh 412.402

-2,528 215,175 625,049 di a

statien use. percent 3.46 0

5.15 4.43

) 9 Accum. Core Avg. Exposure. MWD / Ton!

18.401 10 11.012 29.413 10 CTEG This Month.100 BTU 4.4 %.116 0 22 20.739 6.654.A55 6

11 SGTEG This Month.10 BTU

.t I 12 8

! 13 Hours Reactor Was Critical 433.45 0

213.70 647.15 l

~.

l 14 Unit Use. Hours. Min.

433:27 0

211:35 645:02 l

15 Capacity Factor. Percent 52.3 0

27.8 26.7 j

16 Turbine Avsil. Factor. Percent 100 0

100 66.7 17 Generster Avait. Fneter. Parcent 100 0

101) f.:6. 7

,3 66.7 p

18 Turbcaen. Avait. Factor. Percent 100 0

100 __

60.6 19 Peador Avail F3 dor Percent 100 0

31.9 i 20 Umt Avail Factor. Dereent 58.3 0

28.4 28.9 l

! 21 Tumine startues 0

0 0

0 W! 22 Rexter co d startues 0

0 0

0 e

.jh '4 2

2 Gross Heat Rate. Btu /kwh 10.380 0

9. F40 l 10,180 g

25 Net Heat Aate,8tu/kWh 10.750 0

10.320 10,650 j

i 26

,, I 27 i

.i 28 Thrott:e Pressure. osig 949 0

937 945 ll 29 Tnrottle Temeerature, *F 538 0

537 538

$l 30 Exnaust Pressure. InHg Abs.

1.22 0

1.25 1.23

-j 31 intaxe water Temo.. *F 58.8 0

54.o 57.4 i 32

, l 33 Main Fcedwater, M lb/hr 11.9 0

14.7 12.

34

. 35 36

. 37 Full Power Cacacity. EFPo (3) 34o (4) 375 38 Accum. Cycle Full Power Days. EFFo (3),

  • ,79 (4) 39 Oil Fired for Generation. Gaffons

(

25,322 1 t 40 04 Heatino value. etu/Gai.

140,900 l

o' ne3 ceaeratten_ Mwn I ai e

21.0 I

<t 2 I

Max. Hour Net Gen.

Max. Day 43. G7ni

~

'i Load Mwh l

Time Cate MWh l

Date Factor. %

t 43 2079 I

1300 3/1/85 50,113I 3/3/85 40.4 j

Remarks: AFor 8FNP this value is mwd /STU and for SGNP and WBNP this value is MWO/'.iTU l

{

2(t) indicates Thermal Enwgy.

i

'f/D (3)

Informatien Furnished by Reactor Analysis Group. Chatt.'ncora I

3 (4) End of Cvele 5 Refuel Outane 8509100489 850716 l

I 3._.

PDR ADOCK 05000259 l

R PDR l

  • e Submitted _

04te Revised P

-. /MW

$.bnt *.,uperm'endtr:t

~ p.g

. :p t_ #

t>.

Y 13

)lp l

  • Corrected t..

>;7

- t Y$

OPERATING D ATA REPORT 50-259

R DOCKET NO.

>r3 DATE 4-1-85

'+

40MPLETED BY T. Thon TELEPHONE 729-2171 OPERATING STATUS Not'5 Browns Ferry One

1. Unit Name:

hd 1, 1985

2. Reporting Period:

3293

3. Licensed Thermal Power (MWt):

1152

4. Nameplate Rating (Gruss MWe):

1065

5. Design Electrical Rating (Net MWe):

1C98.4

6. Maximum Dependable Capacity (Gross MWe):

1065

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gi e Rea>ons:

N/A N/A

9. Power Level To which Restricted.If Any (Net MWe):

N/A

10. Reasons For Restrictions.If Any:

h This Month Yr..to.Date Cumularise 744 2,160 93,560

11. Hours In Reporting Period 433.45 1,647.78 59,521.38
12. Number Of Hours Reactor Was Critical 310.55 512.22 o,997.44
13. Reactor Reserve Shutdown Hours 433.45 1,626.67 58.267.26
14. Hours Generator On.Line 0

0 0

15. Umt Reserve Shutdown flour,
  • 1,300,514.
  • 4,950,821
  • 168,066,787
16. Gross Thermal Energy Generated (MWH) 427,190 1,652,650 55,398,130 17 Gross E!cctrical Energy Generated IMhH) 412,402 i,603,031 53,816 S52
15. Net Electrical Energy Cencrated (MWH) 58.3 75.3 62.3
19. Unit Seni:e Factor 58.3 75.3 62.3
20. Unit Availability Factor 52.0 69.7 54.0
21. Unit Capacity Factor IUsing MDC Neti 52.0 69.7 54.0
22. Unit Capacity Factor (Using DER Net) 41.7

_ 24.7 22.2

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
25. If Shut Down At End Of Reimrt Period. Estimated Date of Startup:

Foreca>t Achiesed

26. Units in Ted Status (Prior to Commercial Operation):.

INITIA L CRITICALITY INITIA L ELECTRICITY j

COMMERCIAL OPER ATION (9/77 )