ML20135B169

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jan 1985
ML20135B169
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 01/31/1985
From: Thom T
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20135B118 List:
References
NUDOCS 8509100452
Download: ML20135B169 (2)


Text

W70em iou *o-e n NUCLEAR PLANT OPERATING STATISTICS 4

s.

s r

Plant

/;

Browns Ferry Nuclear

  • Corrected
  • eriod Hours 744 Month January 19 85 l

Item No.

Unit No.

Unit 1 Unit 2 Unit 3 Plant l

[

l Agerare Hourly Gross Load, kw 1.007.156 0

1.067.704 1.042.301 l

2 Mavimum Hour Net Generation. Mwh 1074-0 1091 2141 I

,_ 3 Care Thermas Energy Gen. GWO (t)2 -

. *66.0417 0

96.4089 t162.4506 Stum Gen. Thermal Energy Gen.. GwD (t)2 4

'8 5

Gross Electricaf Gen.. MWh 524.950 0

769.000 1.204.850

)i 6

Station use. MWh 16.289 3.095 19.024 38,408

,5 7

Net Electrical Gen.. MWh 508.661

-3.095 750.876 1.256.442

'3 8

Station Use. Percent 3.10 0

2.47 2.07 9

Accum. Core Avg. Exposure. Mw0/Toni 17.490 0

10.381 27.471 f

10 CTEG This Month.100 BTU 5.407.421 0

7.001 170 11.110.543 i

6 t1 SGTEG This Month.10 BTU l

12

!3 Hours Reactor Was Critical 542.33 0

725.67 1263.00 14 Ur'it Use. Hours-Min.

521:11 0

721205 1242:19 15 Capacity Factor, Percent 64.2 0

94.2 18 jy 16 Turbine Ava.i. Factor. Percent 100 0

100 46 7

'j 17 Generator Avait. Factor. Percent 100 0

100 66.7

l*

'8 Turtmen Avait. F3ctor. Percent 100 0

100 66J in Deleter Avait. Factor. Percent 100 0

100 E7 j2 20 Ur..t *,.c.L Factor. Percent 70.I O

7.".. ?

_Z.7 3

1 2i T.., n.n. si a, e o r,.

L1 0

?

t i

22 Rescior Cord Startues 2

0 0

2.

7_-

I 24 Gross Heat Rate. 8tuikWh 10.300 0

10.270

'10 10A I

j

S Net Heat Aste. 8tu&wn 10.630 0

10 320 JS 500 26

~

?7

'l 23 Tnrottie Pressure. psig 942 0

914 9_17

,j 29 Throttie Temperature. 'F 538 0

M7 23 L _

-i 4

30 En haust Pressure. InHg Abs.

1.02 0

0.97 d.90 I

31 intane water Temo..

  • F 44.7 0

41.5 42.3 i

__j 2

32 33 Main Feedwater. M lb/hr 11.7

_0 12.5 j

.2_2_2._,

_j l

i ;

u 4

I I

'A 35 26 17 Fult power Caoacity. EFPO (3) 346

(

_ 4)

M_

i 38 Accum. Cycle Full Power Days. EFPO (3)

  • 329 (4) 41 j

, j 39 Oil Fired for Generation. Gallons 45,587

,3 40 Oil Heatino Vafue. Stu/Gaf.

W),')00 l

i i

41 Omen 1 Generation. Mwn J3.6

{l i

t, I

l Max. Hour Net Gen.

Max. Day Net Gen.

LoJd i

e MWh Time l

Date MWh Oate Factor. %

2 43 2141 11:00 11/31/85 51,588 1-15-85 7H.9 l

3 A er" ark s t A For 8FNP this value is mwd /STU and for SONP and WBNP this value is MWDiM TU.

lj 2(t) IndiCJtes Thermal Eneray.

(3)

Information furnished by Rx Analysis Group. Chatt.

[d]

(4) End of cycle 5 refuel outage.

8509100452 850716 PDR ADOCK 05000259 R

PDR I

Jate Suomitted 8'

d Date Revised Cn;,,.

N//

Plant WJpetintinO**nt

CCor'r:cted Copy I

  • Corrected OPERATING DATA REPORT

' DOCKET NO 50-259 DATE 2/1/S5 CO3!PLETED BY T. Tho-

-- TELEPHONE.(205) 729-3834 OPERATING STATUS

1. Unit Name:

Browns Ferry One N"'"

2. Reportin; Period:

January 1985

3. Licensed Thermal Power (StWt):

3293

4. Namep!ste Rating (Gross atWe):

1152 l

5. Desgn Electriest Rating (Net MWe):

1065 i

6. 31s-imum Dependsble Capacity (Gross A!We):.1098.4
7. 31ssimum Dependable Capacity (Net alWeJ:

1065 j

S. If Changes Oc'eur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gi.e Rea>ont N/A

9. Power Level To Which Restricted,if Any INet alwe):

'f/A

10. Reawns For Re>trictions. lf Any:

N/A This Stonth Yr..to Date Cumulain e i1. Iloun in Reporting Perind 744 744 92.144

12. Number Ot'lloun !!c1ctor Was Critical 542.33 542.31 59.'.15 9'1 2
13. Hractor' Reserve Shutdown llours 201.67 201.67 6,636.89
14. linurs Generatur On Line 521.22 521.22 57.161 31
15. Unit Rewrve Shutdown !!ours 0

0 0

t6. Crnw fbermal Er.er;y Gcnerated plWlO

..L1,5.85 001

  • 1J3L001
  • 16/dOQ.961_

t i-Grun Elatrical Energy Cencrated (.*.thlii 524.930___,.

524.950 34.27(s20 11 Net E!ntsical Energy Generated stWH) 508.661 508.661

_52.722,492 19 Unit Serve Factor 70.1 70.1 62.0

20. Unit Anifahdity Factor 70.1 70.1 62.0 21 Unit Capa,ity Factor IUning alDC Neti 64.2 64.2 53.7 2.'. Unit Capacity Factor IU>ing DER Net) 64.2 64.2 53.7
23. Umt Forced Outage Rate
  • '0.0
  • 2.2. 9
  • 22.2
24. Shutdowns Scheduled Over Nest 6 Stonths i f,s pe. Date.and Duration of Each1:
25. If Shut Down At End Of Report Period. Estunated Date nf Startup:

2a Units in fest Status Irrior to Commercial Opsratumi:

F >rease h ini s. d

. INITIA L L RI flCA LITY INITIAL ELECTRICITY COsl.stERCIA L OPER A TION l' 0 *

  • l l g

_..,smeP -

,