05000302/LER-1996-018-01, Forwards Suppl LER 96-018-01 Identifying Changes Resulting from Comprehensive Review of Flow Diagrams,Procedure,Design Basis Documents & Licensing Basis Info Required to Be Performed IAW Original LER

From kanterella
(Redirected from ML20135A466)
Jump to navigation Jump to search
Forwards Suppl LER 96-018-01 Identifying Changes Resulting from Comprehensive Review of Flow Diagrams,Procedure,Design Basis Documents & Licensing Basis Info Required to Be Performed IAW Original LER
ML20135A466
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/25/1996
From: Boldt G
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135A469 List:
References
3F1196-15, NUDOCS 9612030238
Download: ML20135A466 (1)


LER-1996-018, Forwards Suppl LER 96-018-01 Identifying Changes Resulting from Comprehensive Review of Flow Diagrams,Procedure,Design Basis Documents & Licensing Basis Info Required to Be Performed IAW Original LER
Event date:
Report date:
3021996018R01 - NRC Website

text

.

'.A

@~

Fbrida Egggr Crysts hvet Uedt 3 Doctet No. 50-3o2 November 25, 1996 3F1196-15 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C.

20555-0001

Subject:

Licensee Event Report (LER) 96-018-01

Dear Sir:

Please find the enclosed Licensee Event Report (LER) 96-018-01 concerning inadequate containment penetration surveillance procedures.

This supplemental report is submitted by Florida Power Corporation in accordance with 10 CFR 50.73 and identifies changes resulting from the comprehensive review of flow diagrams, procedures, design basis documents and licensing basis information required to be performed in accordance with actions established by the original LER.

As a result, included in this supplement is one additional valve and a blind flange discovered to be omitted from the required surveillance l

procedures for verification that containment penetration valves and blind flanges are in their required positions. Note that one valve previously identified in the original LER was removed by this supplement as it had been erroneously identified as not being included in the surveillance procedure.

Sincerely, G. L.

oldt Vice President, Nuclear Production GLB/TWC Attachment i

xc: Regional Administrator, Region II

<>')

Project Manager, NRR "i h A' '

I Senior Resident Inspector 9612030238 961125 l

PDR ADOCK 05000302 S

PDR CRYSTAL RIVER ENERGY COMPLEX: 1stso w Po.., un. si e cry tw mv.,, rio,id. 3442e s70s e cas2) 7es s4se A fku,de Proveen Congwsy