ML20134P389
| ML20134P389 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/05/1997 |
| From: | Jaudon J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Beard P FLORIDA POWER CORP. |
| Shared Package | |
| ML20134P392 | List: |
| References | |
| NUDOCS 9702250418 | |
| Download: ML20134P389 (3) | |
See also: IR 05000302/1996020
Text
is
, s.
.
..
February 5, 1997
Florida Power Corporation
. Crystal River Energy Complex
Mr. P. M. Beard, Jr. (SA2A)
Sr. VP, Nuclear Operations
ATTN:
Mgr.. Nuclear Licensing
15760 West Power Line Street
Crystal River, FL 34428-6708
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-302/96-20
Dear Mr. Beard:
On January 11, 1997, the NRC completed an inspection at your Crystal River 3
reactor facility. The enclosed report presents the results of that
inspection.
During the 6-week period ccvered by this inspection period. your conduct of
activities at your Crystal River facility were generally characterized as
adequate. We are concerned, however, about two violations of NRC requirements
that were identified. One violation was issued for failure to adhere to
Technical Specification reactor coolant system cooldown limits. The second
violation was cited for failure to implement procedural requirements for the
review and development of a maintenance procedure.
These violations are cited in the enclosed Notice of Violation, and the
circumstances surrounding the violations are described in detail in the
enclosed report.
Please note that you are required to respond to this letter
and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room
(PDR).
Sincerely.
.
-
Original Signed By
Johns P. Jaudon Director
Division of Reactor Safety
Docket No. 50-302
License No. DPR-72
Enclosures: 1,
t
2.
Inspection Report 50-302/96-20
1
3.
Synopsis
!
.?50047
orricia1 copy
9702250418 970205
gDR
ADOCK0500g2
fggf j
.-
. - _ . .
-
-
.
- - . .
. _ .
' ' , ' .
FPc
2
cc w/ encl:
Gary L. Boldt, Vice President
Nuclear Production (SA2C)
!
Florida Power Corporation
Crystal River Energy Complex
i
15760 West Power Line Street
Crystal River, FL 34428-6708
B. J. Hickle, Director
Nuclear ?lant Operations (NA2C)
Florida Power Corporation
Crystal River Energy Complex
15760 West Power Line Street
Crystal River, FL 34428-6708
L. C. Kelley, Director (SA2A)
Nuclear Operations Site Support
Florida Power Corporation
'
Crystal River Energy Complex
15760 West Power Line Street
Crystal River, FL 34428-6708
i
!
R. Alexander Glenn
Corporate Counsel
Florida Power Corporation
MAC - A5A
!
P. O. Box 14042
!
St. Petersburg, FL 33733-4042
Attorney General
Department of Legal Affairs
The Capitol
i
Tallahassee, FL 32304
i
Bill Passetti
Office of Radiation Control
'
l
De)artment of Health and
,
l
Rehabilitative Services
1317 Winewood Boulevard
'
Tallahassee. FL 32399-0700
J
Joe Myers Director
Division of Emergency Preparedness
Department of Community Affairs
2740 Centerview Drive
1
Tallahassee, FL 32399-2100
cc: Continued see page 3
.
l
l
.
.
.
) ' *.
'
-
l
)
t
l
FPc
3
i
cc: Continued-
-Chairman
Board of County Commissioners
Citrus County
110 N.-Apopka Avenue
Inverness. FL 34450-4245
Robert B. Borsum
Framatome Technologies
1700 Rockville Pike. Suite 525
Rockville. MD 20852-1631
Distribution w/ encl:
'
K. Landis.-RII
L. Raghavan. NRR
B. R. Crowley, RII
G. Hopper RII
PUBLIC
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
6745 N. Tallahassee Road
Crystal River. FL 34428
.
.
,h
I
ortict
,
a
$1GNATURE
.i
@
NAME
L# ellen
Klan 1
SCah111 hDE
TCooper Qet
DATE
02 / 9 / 97
01 / k / 97
02 /. LA / 97
02 / 4 / 97
02 /
/ 97
02 /
/ 97
COPY?
[fEh
NO
- [YCS)
NO
[fES')
NO
(IED
NO
VES
NO
YES
NO
Utr1ClJi RELUKU LUPY
DDLlPEN i NAM hW\\ CRY 51 ALWtFUR i b \\CRb20f . ULL