Letter Sequence RAI |
---|
|
|
MONTHYEARIR 05000254/19960131996-11-22022 November 1996 Partially Withheld Insp Repts 50-254/96-13 & 50-265/96-13 on 960903-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Activities in Area of Physical Security Project stage: Request ML20134L0361997-02-13013 February 1997 Forwards RAI Re Plant Alternative to 10CFR50.55A(G)(6)(ii) (a) Augmented Reactor Pressure Vessel Insp Project stage: RAI 1996-11-22
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARSVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 9906301999-10-20020 October 1999 Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217K7011999-10-13013 October 1999 Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action1999-10-12012 October 1999 Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action ML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee1999-10-0707 October 1999 Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr SVP-99-189, Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage1999-09-22022 September 1999 Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted SVP-99-190, Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys1999-09-13013 September 1999 Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys ML20211Q7961999-09-0909 September 1999 Forwards Correction to Administrative Error on Page 8 of NRC Insp Repts 50-254/99-16 & 50-265/99-16,transmitted by Ltr, ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211Q6511999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Quad Cities Operator License Applicants During Wk of 000327.Validation of Exam Will Occur at Station During Wk of 000306 ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211F8251999-08-25025 August 1999 Forwards Insp Repts 50-254/99-15 & 50-265/99-15 on 990816-20.No Violations Noted.Insp Evaluated Effectiveness of Maint Rule Program & Review Periodic Evaluation Specifically Required for 10CFR50.65 ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211D1491999-08-19019 August 1999 Forwards Insp Repts 50-254/99-16 & 50-265/99-16 on 990719-22.Staff Identified Major Discrepancy Re Accuracy of Data Submitted to NRC for Protected Area Security Equipment Performance ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20210R7451999-08-13013 August 1999 Forwards Insp Repts 50-254/99-11 & 50-265/99-11 on 990601-0720.NRC Identified Several Issues Which Were Categorized as Being of Low Risk Significance.Two Issues Involved NCVs of Regulatory Requirements SVP-99-147, Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl1999-08-13013 August 1999 Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl SVP-99-170, Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety1999-08-13013 August 1999 Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML20210T9941999-08-13013 August 1999 Forwards Insp Repts 50-254/99-12 & 50-265/99-12 on 990628-0716.Violations Noted SVP-99-154, Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated1999-08-13013 August 1999 Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated ML20210R9541999-08-10010 August 1999 Informs That During 990804 Telcon Between J Bartlet & M Bielby,Arrangements Were Made for NRC to Insp License Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M5461999-08-0606 August 1999 Discusses 990804 Telcon Between J Bartlet & M Bielby,Where Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210L8371999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Motor-Operated Valves ML20210M4691999-07-30030 July 1999 Forwards Insp Repts 50-254/99-14 & 50-265/99-14 on 990713-15.One NCV Was Identified & Discussed in Encl Insp ML20210H4661999-07-29029 July 1999 Forwards Insp Repts 50-254/99-13 & 50-265/99-13 on 990628-0702.No Violations Noted.Insp Consisted of Selective Examination of Procedures & Representative Records, Observations of Activities & Interviews with Personnel 05000254/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed1999-07-29029 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed SVP-99-151, Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 21999-07-23023 July 1999 Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-150, Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept1999-07-23023 July 1999 Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept SVP-99-146, Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 9906251999-07-21021 July 1999 Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 990625 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes SVP-99-139, Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage1999-06-30030 June 1999 Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 05000265/LER-1999-002, Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action1999-06-25025 June 1999 Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action SVP-99-122, Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 9906011999-06-25025 June 1999 Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 990601 SVP-99-066, Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested1999-06-25025 June 1999 Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested SVP-99-103, Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period1999-06-25025 June 1999 Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period ML20196F7921999-06-24024 June 1999 Forwards Meeting Summary,Nrc Meeting Handout & Licensee Handout from 990608 Meeting ML20196E7131999-06-23023 June 1999 Forwards Insp Repts 50-254/99-09 & 50-265/99-09 on 990421-0531.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20196E4821999-06-21021 June 1999 Discusses 990617 Meeting by Region III Senior Reactor Analysts (SRA) in Cordova,Il to Meet with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211Q7961999-09-0909 September 1999 Forwards Correction to Administrative Error on Page 8 of NRC Insp Repts 50-254/99-16 & 50-265/99-16,transmitted by Ltr, ML20211Q6511999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Quad Cities Operator License Applicants During Wk of 000327.Validation of Exam Will Occur at Station During Wk of 000306 ML20211F8251999-08-25025 August 1999 Forwards Insp Repts 50-254/99-15 & 50-265/99-15 on 990816-20.No Violations Noted.Insp Evaluated Effectiveness of Maint Rule Program & Review Periodic Evaluation Specifically Required for 10CFR50.65 ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20211D1491999-08-19019 August 1999 Forwards Insp Repts 50-254/99-16 & 50-265/99-16 on 990719-22.Staff Identified Major Discrepancy Re Accuracy of Data Submitted to NRC for Protected Area Security Equipment Performance ML20210R7451999-08-13013 August 1999 Forwards Insp Repts 50-254/99-11 & 50-265/99-11 on 990601-0720.NRC Identified Several Issues Which Were Categorized as Being of Low Risk Significance.Two Issues Involved NCVs of Regulatory Requirements ML20210T9941999-08-13013 August 1999 Forwards Insp Repts 50-254/99-12 & 50-265/99-12 on 990628-0716.Violations Noted ML20210R9541999-08-10010 August 1999 Informs That During 990804 Telcon Between J Bartlet & M Bielby,Arrangements Were Made for NRC to Insp License Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210M5461999-08-0606 August 1999 Discusses 990804 Telcon Between J Bartlet & M Bielby,Where Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210L8371999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Motor-Operated Valves ML20210M4691999-07-30030 July 1999 Forwards Insp Repts 50-254/99-14 & 50-265/99-14 on 990713-15.One NCV Was Identified & Discussed in Encl Insp ML20210H4661999-07-29029 July 1999 Forwards Insp Repts 50-254/99-13 & 50-265/99-13 on 990628-0702.No Violations Noted.Insp Consisted of Selective Examination of Procedures & Representative Records, Observations of Activities & Interviews with Personnel ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20196F7921999-06-24024 June 1999 Forwards Meeting Summary,Nrc Meeting Handout & Licensee Handout from 990608 Meeting ML20196E7131999-06-23023 June 1999 Forwards Insp Repts 50-254/99-09 & 50-265/99-09 on 990421-0531.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20196E4821999-06-21021 June 1999 Discusses 990617 Meeting by Region III Senior Reactor Analysts (SRA) in Cordova,Il to Meet with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195K1411999-06-16016 June 1999 Forwards Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety ML20195J6401999-06-14014 June 1999 Discusses Licensee 990331 Remediation Plan for Welds Susceptible to Intergranular Stress Corrosion Cracking at Quad Cities Nuclear Power Station,Unit 1 & Requests Licensee Address Concerns Discussed & Propose Plan to Implement C/A ML20207H6171999-06-14014 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-254/99-01 & 50-265/99-01,per 990217 & 0401 Ltrs Which Transmitted NOV Associated with Insp Repts 50-254/98-23 & 50-265/98-23 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML20206S3981999-05-14014 May 1999 Forwards Insp Repts 50-254/99-06 & 50-265/99-06 on 990307-0420.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20206S1131999-05-13013 May 1999 Informs That on 990505 NRC Staff Held Planning Meeting for Plant to Identify Insp Activities at Facility Over Next 6 to 12 Months ML20206S1561999-05-12012 May 1999 Informs of Plans to Conduct Public Meeting on 990608 in Rock Island,Il to Present Planned Changes to NRC Regulatory Processes & Pilot Plant Program for Quad Cities Station ML20206N9621999-05-11011 May 1999 Forwards Insp Repts 50-254/99-08 & 50-265/99-08 on 990419-23.No Violations Noted.Insp Examined Efforts in Addressing Actions Requested in NRC GL 96-01, Testing of Safety Related Logic Circuits ML20206P8511999-05-11011 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-254/98-21 & 50-265/98-21.Corrective Actions Will Be Examined During Future Insp ML20206P6811999-05-11011 May 1999 Confirms Discussion Between Members of Staff to Have Mgt Meeting at Qcs on 990608 in Training Bldg,Meeting Open to Public.Purpose of Meeting to Discuss Qcs Performance Described in PPR ML20206F3221999-05-0404 May 1999 Second Final Response to FOIA Request for Documents.Forwards Documents Listed in App B Maintained in PDR Under Request Number 99-134.Documents in App C Being Released in Part (Ref FOIA Exemptions 6) ML20206Q5701999-05-0303 May 1999 Informs That on 990420-21 NRC Senior Managers Met to Evaluate Nuclear Safety Performance of Operation Reactors, Fuel Cycle Facilities & Other Matl Licenses ML20206E0621999-04-30030 April 1999 Refers to Ceco Which Committed to Perform Future FW Nozzle Insps in Accordance with BWROG Alternate BWR FW Nozzle Insp Requirements Rept.Informs of Misunderstanding Re Condition 6 Implications in SER Which Approved Rept ML20205T4281999-04-22022 April 1999 Informs That Encl FEMA Correspondence Was Received on 990322,transmitting FEMA Evaluation Rept for 981007 Annual Medical Drill Conducted at Rock Island County for Quad City Nuclear Power Station.No Violations Were Noted ML20205Q5191999-04-16016 April 1999 Forwards SER Concluding That Quad Cities Nuclear Power Station,Unit 1 Can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained ML20205P4641999-04-15015 April 1999 Forwards for Review & Comment Draft Info Notice That Describes Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station Unit 2,Arkansas Nuclear One Unit 2 & Ja Fitzpatrick NPP ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML20205N9541999-04-0909 April 1999 Forwards Insp Repts 50-254/99-03 & 50-265/99-03 on 990308-12.No Violations Noted.Longstanding Materiel Condition Issues Continue to Be Problem,However Progress Had Been Made in Listed Areas ML20205J5691999-04-0707 April 1999 First Partial Response to FOIA Request for Documents. Documents Listed in App a Being Released in Their Entirety ML20205F8031999-04-0202 April 1999 Forwards Draft Info Notice Describing Unanticipated Reactor Water Draindown of Listed Plants ML20205J2891999-04-0101 April 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990121-0306.Violations Identified Involving Failure to Follow Station Procedures for Use of Shutdown Cooling & Failure to Follow Station out-of-svc Tagging Procedures ML20196K9001999-03-31031 March 1999 Forwards Radiation Protection Insp Repts 50-254/99-07 & 50-265/99-07 on 990309-12.No Violations Were Identified.Insp Consisted of Review of Solid Radwaste Processing & Control Program & Radioactive Matls Shipping Program ML20205G5811999-03-26026 March 1999 Advises of Completion of Plant Performance Review on 990201 to Develop Integrated Understanding of Safety Performance. Overall Performance of Plant Acceptable.Plant Issues Matrix & Insp Plan Encl ML20204E0611999-03-18018 March 1999 Discusses Review of Rev 8Q to Portions of Plant Emergency Plan Site Annex ML20207L7511999-03-15015 March 1999 Informs That Staff Offers No Objections to Util 990121 Change to Licenses DPR-29 & DPR-30,App a TSs Bases Sections 3/4.10.K & 3/4.10.L.Changes Clearly Identifies That RHR Scs Not Designed to Be Throttled Sufficiently to Maintain Rc 1999-09-09
[Table view] |
Text
February 13, 1997
. Ms. Irena Johns:n, Acting Manag2r Nuclear Regulatcry S;rvices Commonrealth Edis:n Company Executive Towers West III 1400 Opus Place, Suite 500 Downers Grove, IL 60515
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING THE QUAD CITIES NUCLEAR POWER STATION,_ UNIT 1, ALTERNATIVE TO 10 CFR 50.55A(G)(6)(ii)(A) AUGMENTED REACTOR PRESSURE VESSEL (RPV) EXAMINATION (TAC NO. M97370);
Dear Ms.' Johnson:
1 g
e . . ;
By letter dated November 22, 1996, Commonwealth' Edison Company (Comed) submitted an alternative to 10 CFR 50.55a(g)(6)(ii)(A)1 augmented reactor pressure vessel examination requirements for-Quad Cities Nuclear! Power Station, Unit 1. The staff with assistance from its contractor,, Idaho (INEL), is reviewing and evaluating ~this National alternative. Engineering Additional informaLaboratory, tion is' required from' Comed'in order for the staff to complete its review. '
e s . - ,
H;3 The staff requests that the responsei o'th' t attached e RAI be' forwarded [t NRC within 60 days. In addition, to expedite the review process, please send a copy of the RAI response to the NRC's contractor, INEL,Jat the following address: i 4
C
,o Michael T. Anderson .
INEL Research Center 2151 North Boulevard .
P.O. Box 1625 ,
Idaho Falls, Idaho 83415-2209 -
,,i Sincerely, 1 ORIGINAL SIGNED BY:
Robert M. Pulsifer, Project Manager Project Directorate III Division of Reactor Projects - III/IV 1 Office of Nuclear Reactor Regulation Docket No.: 50-254
Enclosure:
As stated cc w/ encl: See next page Distribution:
Docket File ACRS, T2E26 gg h PUBLIC OGC, 015B18 !
PDIII-2 r/f R. Pulsifer i J. Roe, JWR C. Moore E. Adensam, EGA1 R. Capra 'Ql'i P. Hiland, RIII DOCUMENT NAME: QUAD \QC97370.RAI To reesive e espy of thie A--* Indosee in the ben: "C" = Copy without enclosures *E" = Copy with enclosuree *N" = No copy 0FFICE PM:PDIII-2_ 6 LA:PDIII-2 D:PDIII-2 le NAME RPULSIFER/JP CM00RE GmH* fre RCAPRA w DATE 02//$/97~ 02/13 [97 02/s/97
] b U UJ-) 0FFICIAL RECORD COPY 9702180200 970213 '
PDR ADOCK 05000254 G PDR ,
VdDruary W,~h)F Ms. Irsne J hnsen, Acting Manag ;r Nuclear Regulatory Services Commonwealth Edisen Company Executive Towers West III i 1400 Opus Place, Suite 500 Downers Grove, IL 60515
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING THE QUAD CITIES NUCLEAR POWER STATION, UNIT 1, ALTERNATIVE TO 10 CFR 50.55A(G)(6)(ii)(A) AUGMENTED REACTOR PRESSURE VESSEL (RPV) EXAMINATION (TAC NO. M97370)
Dear Ms. Johnson:
By letter dated November 22, 1996, Commonwealth Edison Company (Comed) submitted an alternative to 10 CFR 50.55a(g)(6)(ii)(A) augmented reactor pressure vessel examination requirements for Quad Cities Nuclear Power Station, Unit 1. The staff with assistance from its contractor, Idaho National Engineering Laboratory (INEL), is reviewing and evaluating this .
alternative. Additional information is required from Comed in order for the !
staff to complete its review. 1 Tl.e staff requests that the response to the attached RAI be forwarded to NRC within 60 days. In addition, to expedite the review process, please send a copy of the RAI response to the NRC's contractor, INEL, at the following address:
Michael T. Anderson INEL Research Center 2151 North Boulevard P.O. Box 1625 Idaho Falls, Idaho 83415-2209 Sincerely, ORIGINAL SIGNED BY:
Robert M. Pulsifer, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No.: 50-254
Enclosure:
As stated cc w/ encl: See next page Distribution:
Docket File ACRS, T2E26 PUBLIC OGC, 015B18 PDIII-2 r/f R. Pulsifer J. Roe, JWR C. Moore E. Adensas, EGAl R. Capra P. Hiland, RIII DOCUMENT NAME: QUAD \QC97370.RAI Ta ,eenive e espy of this desunennt, Indoses bi the ben: 'C' = Copy without enclosures *E* = Copy with enclosures *N* = No copy 0FFICE PN:PDIII-2 6 LA:PDIII-2 D:PDIII-2 s NAME RPULSIFEll(JP CM00RE cm H /re RCAPRA e DATE 02//997~ 02/J3/97 02/t3 /97 0FFICIAL RECORD COPY
psf
,j l
l
~ l R NUCLEAR REGULATORY COMMISSION WASHINGTON, D.O. Sh,564001 l
o% *****/ February 13, 1997 l
Ms. Irene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III 1400 Opus Place, Suite 500 Downers Grove, IL 60515
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING THE QUAD CITIES NUCLEAR POWER STATION, UNIT 1 ALTERNATIVE TO 10 CFR 50.55A(G)(6)(ii)(A) AUGMENTED REACTOR PRESSURE VESSEL (RPV)
EXAMINATION (TAC NO. M97370)
Dear Ms. Johnson:
By letter dated November 22, 1996, Commonwealth Edison Company (Comed) submitted an alternative to 10 CFR 50.55a(g)(6)(ii)(A) augmented reactor pressure vessel examination requirements for Quad Cities Nuclear Power Station, Unit 1. The staff with assistance from its contractor, Idaho National Engineering Laboratory (INEL), is reviewing and evaluating this alternative. Additional information is required from Comed in order for the staff to complete its review.
The staff requests that the response to the attached RAI be forwarded to NRC within 60 days. In addition, to expedite the review process, please send a ;
copy of the RAI response to the NRC's contractor, INEL, at the following )
address:
Michael T. Anderson INEL Research Center 2151 North Boulevard i P.O. Box 1625 Idaho Falls, Idaho 83415-2209 l Sincerely, y
~
Rohrt M. Pulsifer, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV Office of Nu:: lear Reactor Regulation i
Docket No.: 50-254
Enclosure:
As stated l cc w/ enc 1: See next page
1
~
l I. Johnson Quad Cities Nuclear Power Station Commonwealth Edison Company Unit Nos. I and 2 !
cc: i Michael I. Miller, Esquire Document Control Desk-Licensing l Sidley and Austin Commonwealth Edison Company !
One First National Plaza 1400 Opus Place, Suite 400 !
Chicago, Illinois 60603 Downers Grove, Illinois 60515 l Mr. L. William Pearce l Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North
- Cordova, Illinois 61242 l
U.S. Nuclear Regulatory Commission Quad Cities Resident Inspectors Office !
22712 206th Avenue North r Cordova, Illinois 61242 L Chairman
- Rock Island County Board of Supervisors ;
1504 3rd Avenue l
Rock Island County Office Bldg.
Rock Island, Illinois 61201 Illinois Department of Nuclear Safety l l Office of Nuclear Facility Safety
- 1035 Outer Park Drive Springfield, Illinois 62704 i Regional Administrator i U.S. NRC, Region III l 801 Warrenville Road l l Lisle, Illinois 60532-4351 l Richard J. Singer Manager - Nuclear
- MidAmerican Energy Company
! 907 Walnut Street l
P.0, Box 657 Des Poines, Iowa 50303 Brent E. Gale, Esq.
Vice President - Law and Regulatory Affairs MidAmerican Energy Company
, One Rivertenter Place
! 106 East Second Street P.O. Box 4350 i Davenport, Iowa 52808 i
i !
i*
l REQUEST FOR ADDITIONAL INFORMATION l RELATING TO AN ALTERNATIVE TO AUGMENTED REACTOR PRESSURE VESSEL INSPECTION
! 00AD CITIES NUCLEAR POWER STATION. UNIT 1 1
l DOCKET NUMBER: 50-254 i
Request for Additional Infomation - Alternative to 10 CFR 50.55a(g)(6)(ii)(A) j Augmented Reactor Pressure Vessel (RPV) Examination
- 1. Scone / Status of Review f
In accordance with 10 CFR 50.55a(g)(6)(ii)(A), all licensees must implement once, as part of the inservice inspection interval in effect on September 8,1992, an augmented voimiric examination of the RPV welds specified in Item B1.10 of Examination Category B-A of the 1989 Edition of the ASME Code,Section XI. Examination Category B-A, Items B1.11 and 81.12 require volumetric examination of essentially 100 percent of the RPV circumferential and longitudinal shell welds, as defined by Figures IWB-2500-1 and -2, respectively. Essentially 100 percent, as defined by 10 CFR 50.55a(g)(6)(ii)(A)(2), is greater than 90 percent of the examination volume of each weld. Licensee's unable to satisfy the requirements of 10 CFR 50.55a(g)(6)(ii)(A) must propose an alternative to the examination requirements, which may be used when authorized by the Director of the Office of Nuclear Reactor Regulation. In addition, all areviously granted relief for Item Bl.10, Examination Category B-A for t te interval in effect on September 8, 1992, are revoked by the new regulation. For licensees with fewer than 40 months remaining in the interval on the effective date, deferral of l the augmented examination is permissible with the conditions stated in )
the regulations. '
The staff has reviewed tho information submitted by the licensee in a letter dated November 22, 1996, proposing an alternative to the 10 CFR 50.55a(g)(6)(ii)(A) augmented RPV examination. !
- 2. Additional Information Reauired ;
The staff has concluded that additional infomation and/or clarification is required to complete the evaluation.
2.1 Provide the date of the augmented RPV examination. In addition, provide a history of the examinations performed on the RPV to date. The licensee stated that the augmented examination was perfomed utilizing the GERIS system from within the reactor pressure vessel. Describe how examinations were performed on the vessel for the previous intervals. Did the vessel receive a 100 percent baseline examination?
ENCLOSURE
l
. \
d 2.2 Considering that the augmented vessel examination is a one time requirement, and considering past examinations may have been performed from the outside surface, discuss increasing examination coverages from the outside surface.
2.3 The licensee noted that 53 indications were detected by the augmented examination. The licensee stated that all of these flaws were determined to be fabrication flaws. Provide the basis for this determination.
2.4 Based on the review of the limitations listed by the ifcensee, it appears that one of the main factors resulting in the noncompliance with Code-required coverage is associated with the inspection device manipulator lower limit. For reactor pressure <
vessel longitudinal welds RPV-VSCI-55 and RPV-VSCl-317, coverages j of less than 90 percent were obtained and for circumferential weld i RPV-CW-LHC1, 0 percent coverage was obtained. Provide further discussion on these limited examinations. It appears that modification of the manipulator may provide additional reach for increased coverage.
2.5 The licensee noted that the procedure for performing the augmented examination was an alternative examination method. In addition, it is stated that the procedure was not in strict compliance with ASME Section XI 1989 Edition, Paragraph IWA-2232; ASME Section V Article 4; or NRC Regulatory Guide 1.150. It is generally agreed that qualification by demonstration would provide a basis to I conclude that the flaw detection capabilities of a procedure will i be at least equal to that of past examinations. However, !
performance demonstration does not preclude the requirement to satisfy the Code of record for a plant or other commitments that l
the licensee may have made. As such, describe the differences '
between the requirements associated with the Code of record and commitments for the licensee's plant, and the procedure implemented to satisfy the subject examinations. Verify that scanning of welds was performed from both sides of the weld on the same surface where feasible. These examinations should have included scanning for reflectors oriented parallel and transverse to the weld.
l 1