Submits Comments Re Review of Proposed Contingency Plans in Event Advanced Medical Systems Either Abandons Facility or Declares Bankruptcy
ML20134G670
Person / Time
Issue date: 02/22/1996
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Federline M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20127A948 List:
References
FOIA-96-444 NUDOCS 9702100504
Download: ML20134G670 (9)


Text

{{#Wiki_filter:-

             \                                                                                            t
                                                                                        $ 4 ~ 00 0 -0 (
               #p*4%gj                                  UNITED STATES g                   NUCLEAR REGULATORY COMMISSION j                     "

REGION lli

                                                                                             %(
7. rj 801 WARRENVILLE ROAD g USLE. ILUNOIS 60632-4351 i

February 22, 1996 . MEMORANDUM T0: Margaret V. Federline, Deputy Director D1 isi n of Waste anagement, NMSS ! FROM: fit a o tor l Division of Nuclear Materials Safety, RIII 4

SUBJECT:

CONTINGENCY PLANS ADDRESSING ADVANCED [

MEDICAL SYSTEMS, INC. (AMS) SCENARIOS We have reviewed the e-mail (attached) submitted to us by Kevin Ramsey of your

, staff which discusses proposed contingency plans in the event AMS either L abandons their facility or declares bankruptcy. We support the development of contingency plans to deal with these possible scenarios, however we would like to take the opportunity to provide specific coments as noted below. g

Our coments are organized to correspond to the items listed in Task Nos. 3 j and 3A of the e-mail. As you will note from our coments, the Region recomends that headquarters take the lead in performing the tasks which concern financial assurance / funding issues. To accomplish the majority of the

( tasks described in the e-mail will require legal and financial expertise, which currently resides in headquarters, not the Region. Task No. 3: Develoo Continaency Plan to Address Situation where AMS Abandons the Facility [ Item 1: We agree with this item in its entirety. Region III should take the lead in dispatching an inspector to the site to verify that there is no imediate health and safety threat to the public. However, imediately after an inspector is dispatched, notifications of local authorities (e.g., police and fire ' departments, etc.) should follow. Local authorities could ~ provide valuable assistance in security of building, crowd and media control, etc. Also, if the facility is locked, they could provide assistance to the NRC in gaining access. A listing of agencies and their contacts would be beneficial, and provide NRC the opportunity to make expedient notifications. Item 2: We agree that an order should be issued to the licensee not to abandon the site. Region III would take the lead in i drafting and issuing an order, ( CONTACT: John R. Madera h 708/829-9834 9702100504 970129 PDR FOIA ENGLISH96-444 PDR

J l Margaret V. Federline . .( l l Item 3: We agree that a bankruptcy team should be established and be ' l- comprised of regional and headquarters staff. However,

         ,                                 since there are legal issues associated with bankruptcy, we recommend that OGC take the lead.

Item 4: Item 4 deals with procedures to follow for drawing on the letter credit. Region III suggests that headquarters, since it has the expertise in dealing with financial assurance issues, take the lead. , ! Item 5: Regarding financial assurance / funding issues, Region III , recommends that NMSS take the lead and direct the trustee to disburse funds from the trust, work with the trustee to prepare a Statement of Work, and solicit bids from contractors. As stated earlier, it is apparent that headquarters has the expertise to deal with these issues.

Item 6
The review of the.remediation contractors decommissioning ,

plan and cost estimate should be done at the Region with i technical assistance from headquarters, if necessary. However, any legal action against AMS due to a funding shortfall, should be handled by headquarters. }

                 ' Item 7:                 The Region should take the lead in conducting inspections of remediation efforts.

Item 8: Approval of disbursements from the standby trust'for maintenance of facility and remedial actions are financial and legal matters. Therefore, the Region suggests that these issues be handled by headquarters. Task No. 3A: Continoency Plan to Address Situation where AMS Declares Bankruotcy. but does not Abandon the Facility Item 1: The Region agrees that it should be responsible for contacting AMS to verify that they maintain control of the facility after they file for bankruptcy. The Region should - also take the lead in drafting and issuing a CAL, with headquarters concurrence. However, since a CAL is issued for items that are expected to last less than 30 days, you may wish to consider issuing an order in this situation. Item 2: As noted in our response to Item 1 of Task No. 3, we agree that a bankruptcy team should be formed; however, we  ; recommend that headquarters take the lead in putting the team together. Item 3: As noted in Item 3 of Task No. 3 above, the Region suggests . that headquarters take the lead in issues that involve '

             )                             drawing on the letter of credit.                                                                              !

o r

   - - . - ,              w. ..n,.   --- ,            -  --              . ,,    . . . - . . - , ,...en.-.- - ., - ,- , ,, - , . .,. ,e n.n, - ,
 ,                       i                                                                                      ,

t

       .-                   Margaret V. Federline                            !(

Item 4: This item discusses procedures concerning the disbursement of funds from the Standby Trust Account. We agree with Items 4.a. through 4.c.; however, the Region recommends that i headquarters take the lead in the review and approval of all' financial documents dealing with the disbursement of funds. Regarding Item 4.d., the Region suggests that headquarters certify the disbursement approval documents and ensure that certifications are authorized. Item 5: The Region again recommends that headquarters take the lead in legal action against the licensee in the event of a funding shortfall for decommissioning the facility.

                           .Ilsa_s:            Our response to this item is the same as for Item 7 of Task 3 above.

Item 7: Our response to this Item is the same as for Item 8 of Task 3 above. cc: K. Ramsey, NMSS (

                                                                                                                  )

i l l l l

         - .           -   -             -                                            -.             - - . -      l
                                                    .. = =

W Cleve'and, Ohio 44110 Advanced Medic 1020 London Rd. P16-692-3270 1 FAX (216) 692-3269

                    )           FAXMESSAGE em Bc6 A'r                                           i n gQST - + M//fe We.jep 1

FAX NUMBER: ( l DATE: 9, - d 8- f 6 - PAGE,._OF$ MESSAGE: r ' fv f0 4 -F&ff) e

                          /"1bSul73 fveM 9(77 W4                        l M.5      we        , Orc uar a >cc e sac l
                                                                    /
                                    -..         --      -                            ' ~ ~ ^      '~^

L

                                                                                                       ~

j N Z2fjr_A",#'"" fem.__ _ - - i- ..A n, wooEO Rm3T!cSL SEWICES - 21669Z5259 to.283 001

                                                                         ~

ma a ru m / io c unse n lI 4 Lockheed Analytical Services (702)3G1-3955 ext. 274 l 975 Kelly Johnson Drive tax (702)361-3137 I Las Vegas, NV 89119 f FAX TRANSMITTAL COVER DATE: February 27,1996 l NUMBER OF PAGES (including cover) 5 i FROM: Wade Pullman To: Mr. Robert Meschter i PHONE #: (216) 892-3270 FAX #: (216) 692-3269 ( COMMENTS Draft data I i! ClientlQ LAL Samnle IQ WO22696-002(TOP) L6509 - 1 WO22696-00,2(BOTTOM) L6500 - 2 WO22696-002(TOP) ( Filter ) L6509 - 4 WO22696 002(BOTTOM) ( Filter ) L6509 5 J h

                                                                                                              /

b'd 37 02 # "# " "- 3 LN mngammo gg 9 tO.283 p02 w W/hY8 LeCOEED ANALtTICAL SEty!Cis kA3 Daf A R470ef (re01) lEM. Iw. (pr0 oct J FAST 7AT GMed SPEC) Climat temple ins WQ22696 002(TW) LAL sa mte to: LeSC9-1 cete Collected: 24-fts M Date tecelwed: 27 ftt-96 htria Water Login h e r: L6509 Y M N eb M M M D M '$ N, M NkhY$7 M M M M.5I co-.o 27 ses w waa ease tat co63.p204 2.0 2.9 6.6 ocist 1 I l 1 l l l l

                       $                                                                                                       I i

l

 # =d u - o - :.s u ue: %as A~

LDD #C4 '.*T!CA enj!CES a 21669' 9

            '                                                                                                10.283             g Yk L0ct(CD AhALYflCAL 3ERVICIS SAD DA1A stocat (ved9 1tn, Inc.

(Project f A111Af Gasma 8PEC) Clims sample ID: W 22494 401(tet m p LAG temele ID: Le500 2 Date Cellected M.f ts.96 Date Received: 27.fts 96 Metr (ut water gogg n gg, , gggg, I W N7mampailue:y4dh;egmEEugg;7;ygweg3y g , I co-*o sr.ees.w em.meric m ens,uat 5,6 ..s ,,, ,,,, 1 1 1 l I f 1 i

                                                                                                                                       'i 9

k

           -    u.'      J                         -a     A  - -      -n---w.,       _ ---       1.       , es as._L.-Am_.-_ -e-- - -M-x+-m..-e      4n      -4   _,   __za . .,,n
                    *'"N            4 s NJ                                                       &b      Y         &          Y UAAKhtU f#04LYTICOl. SERVICES e 2166923269
                     .                                                                                                                   to N3              D04
tocaeuse AsiaLvticAt unviess l

RAo DATA er8041 tr 00 [ ,

                                                                               ,~ ,-

treejeet #Aef f at eManA late) 4 cuene s=te th wcz2m.co2nce) 'at Wi* to: um 4 i; bete Collesteds M*FH M Cote ReceIMI 17'M8'M natrias tiet,, testa s.** WM i j i i 4 1 a

        .......-.e.same.eainm=== muse ====sammmm=n======am--m'm*"""dd"8'*".""*".*'**""""""*"'"""*"'**"""*""'"~"" 
u.so n m u enom me wms.mu - o.s a u ocu' i

b i s 1 J < '/ l i, - 1. i 4 i

                                                                                                                                                                                      ~
          .          . - .                                 --      =        ..                                - - . - - _ - - . - - . .                        -
                                                                                                   .~_.
        "' d ' ' W                                                                                                                                   , ' u

.. l'/*UJ N R)RYTIA cRIGS

  • 2E9M9 gg
                                                                                                                                                                 ~

ft L7tiL ( tocostge WTitCAL 46tytttt f GAD DATA tf>0tf (re01) tER, Enc. (Project FAtt TAT GMetA SP(C) Cilent Sasple its W226M DID(90ffm) LAL temple Its L6509 5 Dete Cettected: M*PH-96 Date neceived 21 pes N notrts Water 4*stn ames L6sw 4 aeg amassassmensranntBKf16auladll tie 4ssale6Shatmannaann - , co 40 27.pte M GAsed spic LAL 0M3)4241 +0.6 2.4 6.4 pcl/L I-i 5 l

  • e I

i i ! I 1 t e 4

                                                                     ..e. ,

l 1

  ..                                                                                                             i 4

UNITED STATES [C'%'s y, NUCLEAR REGULATORY COMMISSION i O o REGION m E '

  -{                                                801 WARRENVILLE ROAD USLE. ILUNOIS 805324%1 g . . . . . ,f                                                                                       ,

February 26, 1996 I Lawrence K. English . Assistant General Counsel l Northeast Ohio Regional Sewer District [ 3826 Euclid Avenue Cleveland, Ohio 44115-2504 l

Dear Mr. English:

8 l I am writing in response to your facsimiles dated January 31, February 1, l February 5, February 7, and February 12, 1996, as well as the recent telephone conversations between you and members of my staff, regarding the discharge of [

water at Advanced Medical Systems, Inc. (AMS). In these communications, you j expressed concern about the presence of insoluble cobalt-60 (Co-60) in the

! water from AMS' underdrain system and manhole which had been pumped into storage Tanks 877, 222, and 880. ( Your facsimiles list the results of the solubility tests performed by your contract laboratory. The January 31, 1996 facsimile documented that your l laboratory had measured a cobalt-60 (Co-60) activity of 2.7

  • 2.0 picocuries t l

(pci). on the filter from water held in AMS Tank 877. Likewise, the I February 5,1996 facsimile reported a measurement of 4.0 1.9 pCi on the filter from water held in AMS Tank 222, and the February 12, 1996 facsimile l reported a measurement of 39.3 12.0 pCi on the filter from water held in AMS I Tank 880. Since Co-60 was detected on these filters, Northeast Ohio Regional l Sewer District (NE0RSD) considers the Co-60 in Tanks 877, 222 and 880 to be i insoluble. In as much as 10 CFR 20.2003 requires that licensed material which is discharged into a sanitary sewerage system be readily soluble in water, NE0RSD requested that NRC prohibit AMS from discharging the water from these ~ tanks. - On January 31, 1996, we asked AMS to postpone the discharge of Tank 877 until NRC's investigation was complete. On February 5, 1996, we made the same request for Tank 222. AMS complied with our requests. By facsimile dated February 2,1996, AMS indicated that its contract laboratory, Lockheed Analytical Services, had measured the Co-60 concentration l in a water sample from Tank 877 and found no detectable Co-60 (the minimum l detectable activity (MDA) for this analysis was 4.1 picocuries per liter + !. (pCi/1)). A solubility test on this water sample was not performed. By ! facsimile dated February 7,1996, AMS indicated that its laboratory had i measured the Co-60 concentration and performed a solubility test of a water n sample from Tank 222. Co-60 was not detected on the filter (the MDA for this ') analysis was 3.5 pCi).

i-Lawrence K. English . In response to your first three facsimiles, on February 6,1996, an NRC inspector and I went to AMS and took six 0.5 liter water samples from Tanks 877 and 222. The water in the tanks had been recirculating for approximately 20 hours. In the Region III laboratory, each water sample was tested for solubility. Co-60 was not detected on these filters; thus, the NRC analysis did not confirm that the water in these tanks contained insoluble Co-60. These results were transmitted to AMS, and AMS subsequently discharged the water from the two tanks. (The analysis results are summarized in the enclosure.) [ In response to your February 12, 1996 facsimile, on February 13, 1996, an NRC inspector went to AMS and took seven 0.5 liter water samples from Tank 880. Four samples were obtained from the top of the tank while the water was being 8 recirculated. (The water in'the tank had been recirculating for approximately 24 hours.) Based on our discussions with you regarding NE0RSD's sampling technique, three samples were obtained from the tank's bottom outlet valve one hour after the recirculation pump had been turned off. Prior to taking the { samples, approximately two liters of water were drained from the bottom outlet valve and returned to the tank. The analysis of the samples from Tank 880 is still in progress. To date, two samples from the top and two samples from the bottom of the tank have been ( filtered. No Co-60 was detected on the filters from the top samples, but Co-60 was detected on the filters from the bottom samples. (The analysis results are summarized in the enclosure.) Based on these results: (1) on , February 16, 1996, we informed AMS that insoluble cobalt-60 had been detected i in the water from Tank 880, and therefore, a discharge of. Tank 880 would be an apparent violation of 10 CFR 20.2003, and (2) we are currently reviewing the adequacy of AMS' sampling and analysis procedures. Once our analysis of samples from Tank 880 is complete, you will be provided the complete results. In the meantime,-please do not hesitate to contact me , should you have any further questions regarding AMS. l Sincerely, - Original signed by Geoffrey C. Wright, Acting Deputy Director Division of Nuclear Materials Safety Docket No. 030-16055 License No. 34-19089-01

Enclosure:

NRC Analysis See Attached Distribution ( CUMENT NAME: G:\LTRS2LIC\MTLS\030\96316055.LO4 <

                      \                            wolve a copy of this document,indecate in the box: C = Copy without attachment / enclosure E = Copy with attachment / enclosure N = No copy               I 0FFICE        RIII                         E   RIII       ,         L6        RIII + M             F RIII M " l/ RIII                             ,

ls NAME MWeber:dp h JMadera')/%. DCool v + FwJl MZobler w v h 1 GWright W p ) i DATE 02/ n /96 02/ 2 99'6 02/ M /96 02/ O /96 02/4(j/96 0FFICIAL RECORD COPY

8 lawrence K. English [ Distribution Robert Meschter Robert E. Owen, Administrator Radiation Safety Officer Department of Health Advanced Medical Systems, Inc. 246 North High Street, 3rd Floor 1020 London Road P.O. Box 118 Cleveland, OH 44110 Columbus, OH 43266 Michael R. White, Mayor Lisa Mehringer City of Cleveland City of Cleveland Law Department [ 601 Lakeside Avenue 601 Lakeside Avenue, Room 106 Cleveland, OH 44114 Cleveland, OH 44114 Erwin J. Odeal, Executive Director Erv Ball, Deputy Director' Northeast Ohio Regional Sewer District Cuyahoga County Board of Health 3826 Euclid Avenue 1375 Euclid Avenue, Suite 524 Cleveland, OH 44115 Cleveland, OH 44115 l Michael Kalstrom, Secretary Jane Harf, Chairperson County of Cuyahoga Ohio State Emergency Response Cuyahoga Emergency Management Commission Assistance Center 1800 Watermark Drive 1255 Euclid Avenue, Room 102 P.O. Box 163669 ( Cleveland, OH 44115-1807 Columbus, OH 43216-3669 Marian Zobler U.S. Nuclear Regulatory Commission { hcci C. Jones, NHSS PUBLIC IE07 AMS File E-mail: Bruce Berson (BAB1) Bill Brach (EWB) Joe DeCicco (JXD1) Cynthia Jones (CGJ) Mike Stein (MHS) Jim Caldwell (JLC1) - Tim Johnson (TCJ) Mike Weber (MFWI) Fred Combs (FCC) John Madera (JRM4) Marian Zobler (MLZ) Donald Cool (DAC) Kevin Null (KGN) Bernie Bordenick (BMB) Steve Crockett (SFC) Cindy Pederson (CDPI) Josie Piccone (JMP1) Geoffrey Wright (GCW) ( l l

              -                                                                                                       l

.. i i, i ~[ ENCLOSURE RESULTS OF NRC'S ANALYSIS OF FILTERS FROM TANKS 877, 222 AND 880 j AMS Tank Filter Activity MDA Count Time. Number Number (pCi) (pCi) (hours) i 877 1 < MDA 2.0 12.7 1 d 877 -2 < MDA 1.8 -16.0 j 877 3 < MDA 1.8 13,. 3 i I 222 1 < MDA 2.3 10.4 222 2 <-MDA 1.7 16.1 , 222 3 < MDA 1.7 17.1 i 880 top 2 < MDA 1.7 15.7 _ j 880 top 3 < MDA 2.3 11.0 [ 880 bottom 1 _17.2 1.2 1.5 24.4 ) i 880 bottom 2 19.6 2.0 2.4 7.2 !( NOTES: (1) MDA stands for minimum detectable activity. s , i i 6 e e

i o e i I a l l i l l 1 I l l r 1

'I I

f 5 i

                                                         .                                            I v                                                                                        -
   /

M Cleveland, Ohio 44110 Advanced Me 1020 London Rd. t 216-692-3270 Febmary 26,1996 l Ms. Cynthia D. Pederson, Director Division of Nuclear Materials Safety , U. S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Re: License No. 34-19089-01

Dear Ms. Pederson:

[i Advanced Medical Systems, Inc. (AMS) is in receipt of your letter dated February 16,199 response to that letter, and as. follow-up to a February 26, 1996 conference call between representatives.of AMS and the IJSNRC, the following is providri ( Tank 880, containing foundation drain water, will be filtered prior to discharge. AMS intends to filter the water in Tank 880. This action should significantly red [, of suspended solids in the tank, which will then be ready for repeat sampling an pursuant to RSP-018, " Operation of the Gamma Spectrometer" and RSP-019, " Assessment o Radioactivity in Wmer Samples" (see below). AMS intends to initiate the sampli procedure immediately. The USNRC is welcome to come to the AMS facility to colle of the filtered water if you wish to perform a confirmatory analysis at the Region In the future, analytical results that are positive for the presence ofinsoluble "Co tank of water will require filtration and re-sampling of that batch prior to discharge A revised sampling and discharge methodology for all hold-up tanks will ensure ho of the tank's contents. Radiation Safety Procedure No. RSP-019 is being revised to include a more aggressi methodology for ensuring homogeneity of the hold-up tanks du:ing sampling and disc Once the revised procedure is approved by the AMS Radiation Safety Committee, a c forwarded to you for review._. Pursuant to our. discussion, for the aveek of Febnury 26 confirmatory samples from tanks staged for discharge will be collected from the top an bottom of the recirculating tank. A comparison of results from the two locations will demonsi the effectiveness of the more aggressive mixing methodology. mn 1. tm  :

   -4eri3ratr4ter 3fr

i; l s The methodology for determining the amount of insoluble "Co in each hold-up tank will be ( . sufficiently sensitive. AMS is instituting a new counting geometry for its in-house gamma spectroscopy system. Since  ! this geometry will permit us to count filters, RSP-018 will be revised to incorumate the new  ; counting geometry. In addition, RSP-019 will be revised to require that all water staged for

                                                                                                                                           )

discharge be counted directly for total "Co concentration, and, as necessary, passed through a 1 0.45 micrometer filter. The filter will then be counted for insoluble "Co concentration pursuant to RSP-018. After Rauiation Safety Committee approval, copies of these revised procedures will be forwarded to you for review. The water discharge criterion at AMS will be no detectable "Co on a 0.45 micrometer filter with a nominal detection limit of 35 pCi per liter. Title 10, Code of Federal Regulations, Section 20.2003 permits discharge of radioactive materials into the sanitary sewer system if they are "readily soluble (or readily dispersible biological material) in water". The reason for including the solubility criterion is to ensure that discharged materials are not concentrated to unacceptably elevated levels in the ash or sludge of the receiving sewage treatment plant. r Information Notice 94-07, " Solubility Criteria for Liquid Effluent Release to Sanitary Sewerage Under the Revised 10 CFR Part 20", states that the solubility of the residual radioactivity may be demonstrated using American Public Health Association's Method 7110 " Gross Alpha and Gross Beta Radioactivity (Total, Suspe,nded, and Dissolved)" from Standard Methods for Framination ( of Water and Wastewater. (This methodology calls for filtering the water through a 0.45 micrometer filter, followed by gross alpha / beta activity determination on the filter.) However, i neither 10 CFR 20.2003 nor APHA 7110 provide a detection limit below which it can be assumed that insignificant insoluble radioactivity exists in the sample. ' In a telephone conversation between John Madera (USNRC Region III) and Carol Berger l (technical consultant to AMS) on Friday, February 23, 1996, the USNRC indicated that a i detection limit of one (1) to two (2) pCi/l would be an acceptable detection limit. However, a I limit of this magnitude is not technically defensible for the following reasons: It cannot be achieved using in-house resources (nor can it be achieved at the y USNRC's counting laboratory in less than 15 hours of counting time) It demands the use of expensive commercial analytical services It provides no societal benefit pursuant to 10 CFR 20.1003 and 20.1001 AMS discharges a maximum of 3,000 gallons of groundwater per day. The regional sewage treatment plant generates approximately 50 tons of ash per day. Ifit is conservatively assumed that 100% of an AMS discharge reaches the sewage treatment plant, and ifit is conservatively assumed that 100% of the radioactivity is removed to the sludge, and if it is conservatively (

                                                                                                                                       +

4

         ,                 r,                                                  .-      m.      ,-m. ,        -       ,      --- . <+ ,

u .. .  : l ,

                                                                                                                                                                ?
     '                                                                                                                                                          L assumed that the discharge contains 100 pCi per liter ofinsoluble "Co, then the ash at the                                               !

( treatment plant would contain the following concentration of"Co: ' 30008 day x 100b I x 41 x I ### x I ##"

                                                                                                                - x  I ##*"#
                                                                                                                                   = 0.026 #

gal 50 ton 2000 pound 454 grane gram If 100 licensees in the Cleveland area discharged similar quantities, the maximum "Co concentration in the daily ash volume would be less than 3 pCi per gram. In light of the other i radioactivity present in this material (e.g., uranium, thorium, potassium, and short-lived medicali radionuclides), it is not likely that such a concentration would be detectable. Furthermore, ev if the ash were released for unrestricted use, it would result in negligible individual doses even { i under the most conservative use scenario (e.g., residential scenario). l  ; l To demonstrate, please assume that 100 USNRC licensees in the same regional sewer district discharge water containing insoluble cobalt. If the ash concentration limit for a residential i scenario pursuant to NUREG-1500, based upon a three (3) millirem ~per year dose limit is assumed (e.g.,0.593 pCilg),8, then the limit for each facility independently would be 0.593/100 or 0.00593 ' pCi/g. Applying this value to AMS alone, the following conservative discharge limit results: 3000 gal 3.,85 t , g day con pound day , \ gal t 50 ton 2000 pound 454 gram

                                                                                                                                                                 \

x - n., e ' t

( Pursuant to RSP-018 and RSP-019, the AMS in-house gamma spectrometer is capable achieving a nominal detection limit of less than 35 pCi on a filter within a reasonable co time. If 35 pCill of insoluble "Co went undetected prior to discharge of 3,000 gallons of water per day, the radiological impact on the regional sewer district would be indistinguishable from background, and the spirit of 10 CFR 20.2003 would be preserved.

Your timely concurrence with our position on the above would be greatly appreciated. IfI can answer any questions or provide you with additional information, please call me at (216) 692-3270. Sincerely, Robert Meschter, R.S.O. cc: D. Cesar D. Miller, Esq. - Stavole & Miller l C. D. Berger, C.H.P. - IEM L M. Weber - USNRC Region III l ,_( l \ ' Daily, M. C., et al, " Working Draft Regulatory Guide on Release Criteria for Decommissioning I Staff's Draft for Comment", NUREG/1500, U. S. Nuclear Regulatory Commission, August.1994. l l

. . t Advanced MedicalSystems,Inc. 1020 London Rd. Cleveland, Ohio 44110 . t 216-692-3270 l

                                                                                                        .i February 26,1996 Ms. Cynthia D. Pederson, Director Division of Nuclear Materials Safety                                    ,

{ U. S. Nuclear Regulatory Commission l 801 Warrenville Road Lisle, Illinois 60532-4351 , Re: License No. 34-19089-01

Dear Ms. Pederson:

{' Advanced Medical Systems, Inc. (AMS) is in receipt of your letter16,1996. dated February In response to that letter, and as follow-up to a February 26, 1996 conference call between representatives.cf AMS and the USNRC, the following is provided. ( Tank 880, containing foundation drain water, will be filtered prior to discharge. AMS intends to filter the water in Tank 880. This action should significantly reduce , i of suspended solids in the tank, which will then be ready for repeat sampling and pursuant to RSP-018, " Operation of the Gamma Spectrometer" and RSP-019, " Assessment of Radioactivity in Water Samples" (see below). AMS intends to initiate the sampling procedure immediately. The USNRC is welcome to come to the AMS facility to collec of the filtered water if you wish to perform a confirmatory analysis at the Region III In the future, analytical results that are positive for the presence ofinsoluble "Co tank of water will require filtration and re-sampling of that batch prior to discharge. A revised sampling and discharge methodology for all hold-up tanks will ensure hom of the tank's contents. Radiation Safety Procedure No. RSP-019 is being revised to include a more aggressive methodology for ensuring homogeneity of the hold-up tanks during sampling and disch Once the revised procedure is approved by the AMS Radiation Safety Committee, a co forwarded to you for review. .. Pursuant to our discussion, for the . week of February 26, - confirmatory samples from tanks staged for discharge will be collected from the top and . bottom of the recirculating tank. A comparison'of results from the two locations will demonstrate the effectiveness of the more aggressive mixing methodology. i j ( MMt 1.1996 I eaomo 99, I

         -The methodology for determining the amount of insoluble "Co in each hold-up tank will be

( sufficiently sensitive. AMS is instituting a new counting geometry for its in-house gamma spectroscopy system. Since this geometry will permit us to count filters, RSP-018 will be revised to incorporate the new counting geometry. In addition, RSP-019 will be revised to require that all water staged for discharge be counted directly for total "Co concentration, and, as necessary, passed through a 0.45 micrometer filter. The filter will then be counted for insoluble "Co concentration pursuant to RSP-018. After Radt. tion Safety Committee approval, copies of these revised procedures will be forwarded to you for review. The water discharge criterion at AMS will be no detectable "Co on a 0.45 micrometer filter with a nominal detection limit of 35 pCi per liter. Title 10, Code of Federal Regulations, Section 20.2003 permits discharge of radioactive materials into the sanitary sewer system if they are "readily soluble (or readily dispersible biological material) in water". The reason for including the solubility criterion is to ensure that discharged materials are not concentrated to unacceptably elevated levels in the ash or sludge of the recei sewage treatment plant. Information Notice 94-07, " Solubility Criteria for Liquid Effluent Release to Sanitary Sewerage Under the Revised 10 CFR Part 20", states that the solubility of the residual radioactivity may be demonstrated using American Public Health Association's Method 7110 " Gross Alpha and Gross Beta Radioactivity (Total, Suspe.nded, and Dissolved)" from Standard Methods for Examination (, of Water and Wastewater. (This methodology calls for filtering the water through a 0.45 micrometer filter, followed by gross alpha / beta activity determination on the filter.) However, neither 10 CFR 20.2003 nor APHA 7110 provide a detection limit below which it can be assumed that insignificant insoluble radioactivity exists in the sample. In a telephone conversation between John Madera (USNRC Region III) and Carol Berger (technical consultant to AMS) on Friday, February 23, 1996, the USNRC indicated that a detection limit of one (1) to two (2) pCill would be an acceptable detection limit. However, a limit of this magnitude is not technically defensible for the following reasons:

                     =                                                                                                             ;

It cannot be achieved using in-house resources (nor can it be achieved at the USNRC's counting laboratory in less than 15 hours of counting time) .) It demands the use of expensive commercial analytical services It provides no societal benefit pursuant to 10 CFR 20.1003 and 20.1001 AMS discharges a maximum of 3,000 gallons of groundwater per day. The regional sewage j treatment plant generates approximately 50 tons of ash per day. If it is conservatively assumed that 100% of an AMS discharge reaches the sewage treatment plant, and if it is conservatively ' assumed that 100% of the radioactivity is removed to the sludge, and if it is conservatively '( i

assumed that the discharge contains 100 pCi per liter ofinsoluble "Co, then the ash at the ( treatment plant would contain the following concentration of *Co: i 3000day b x 100bt x 41 x I ### x I '#" x I ##""#

                                                                                   = 0.026 gal   50 ton    2000 pound    454 gram         gram If 100 licensees in the Cleveland area discharged similar quantities, the maximum *Co concentration in the daily ash volume would be less than 3 pCi per gram. In light of the other i radioactivity present in this material (e.g., uranium, thorium, potassium, and short-lived medical radionuclides), it is not likely that such a concentration would be detectable. Furthermore, eve           )

if the ash were released for unrestricted use, it would result in negligible individual doses even under the most conservative use scenario (e.g., residential scenario). To demonstrate, please assume that 100 USNRC licensees in the same regional sewer district discharge water containing insoluble cobalt. If the ash concentration limit for a residential scenario pursuant to NUREG-1500, based upon a three (3) millirem per year dose limit is assume (e.g.,0.593 pCi/g), , then the limit for each facility independently would be 0.593/100 or 0.00593 pCilg. Applying this value to AMS alone, the following conservative discharge limit results: 3000 gal , 3.785 t y pCl day ton pound day , ,n993,3 gal t 50 ton 2000 pound 454 gram X = 23.7 Pursuant to RSP-018 and RSP-019, the AMS in-house gamma spectrometer is capable o ( achieving a nominal detection limit of less than 35 pCi on a filter within a reasonable cou time. If 35 pCill ofinsoluble *Co went undetected prior to discharge of 3,000 gallons of water per day, the radiological impact on the regional sewer district would be indistinguishable from background, and the spirit of 10 CFR 20.2003 would be preserved. Your timely concurrence with our position on the above would be greatly appreciated. IfI can answer any questions or provide you with additional information, please call me at (216) 692-3270. Sincerely, Robert Meschter, R.S.O. cc: D. Cesar D. Miller, Esq. - Stavole & Miller C. D. Berger, C.H.P. - IEM M. Weber - USNRC Region III (s ' Daily, M. C., et al, " Working Draft Regulatory Guide on Release Criteria for Decommissioning: NR Staff's Draft for Comment", NUREG/1500, U. S. Nuclear Regulatory Commission, August,1994.

FEB 2 81996 <( 5 l l l . Mr. David Cesar, Vice President Advanced Medical Systems 1 121 North Eagle Street Geneva, OH 44041 4

Dear Mr. Cesar:

We have completed our review of your Emergency Plan submitted under letter dated September 21, 1995, and request that you provide clarification and/or additional information on the following topics: $ 1. AMS Staffina levels and Offsite Response Personnel Your response to our previous comment I.A of our June 7, 1995 letter did i ' not provide an assessment of how current staffing levels will be able to ' fulfill the functions and responsibilities described in the plan, especially during nonworking hours. The following issues should be addressed in the plan:

a. It appears that the onsite emergency organization is comprised of

(  ; three individuals during working hours, and the absence of one or ' more individuals could severely impact the licensee's capability to promptly notify offsite response organizations and coordinate the. response to an emergency. The licensee is required by 10 CFR 30.32(i)(3)(viii) to plan the notification and coordination so ' i that unavailability of some personnel will not prevent I notification and coordination. The plan should describe how the licensee will compensate for the functions assigned to an absent member of the emergency organization.

b. Section 4.2 of the plan should clearly state the order in which AMS staff members assume the role of Emergency Manager if the Radiation Safety Officer (RS0) is not available (see previous comment V.C).
c. It is still difficult to determine which personnel are assigned to each of the functional areas specified in Section 4.2.2 of  ;

Regulatory Guide 3.67 (see previous comment V.D). It would be helpful if these functional responsibilities were all specified in one place such as Figure 7.

d. During nonworking hours, it is unclear whether a fire or other emergency situation will be detected promptly if power lines or phone lines are down. The plan should describe how the alarm system signal is transmitted to ADT Security Systems and how ADT k ~

g _GSMMO:$&7 llN.

I? D. Cesar would detect a loss of contact with the alarm system. Any difference in the response to a loss of contact versus an alarm signal should be described also. . i

e. During nonworking hours, it appears that local fire or police units could arrive before AMS staff and it is unclear whether there are adequate provisions to alert offsite response personnel e to radiological hazards if no AMS personnel are there to meet  !

them. The plan should describe arrangements with fire, police and rescue personnel regarding how they will fight fires and respond to alarms if AMS personnel are not present when they arrive at the  ! site. The plan should also describe signs and other provisions to prevent offsite response personnel from unknowingly entering areas with elevated radiation levels.

2. Engineers Opinion Report l

In response to our request for an engineering analysis of the facility i structure, the emergency plan refers to an Engineers Opinion Report issued by Neff and Associates dated September 1995. We obtained a faxed copy of the report dated September 22, 1995 (after the date of the ( emergency plan). We noted a number of deficiencies in the report and a general failure to provide an adequate technical basis to support its conclusions. Most of our concerns regarding the structural integrity of your facility will be addressed in Inspection Report No. 030-16055/95006 which will be transmitted under separate cover. With respect to the l! emergency plan, the Engineer's Opinion Report does not provide an ' i adequate analysis of the worst case earthquake. The report states that the structure can " withstand seismic forces as great as 5.2 Richter" and "a seismic event greater than 5.2 Richter in this region is highly improbable." Since the Richter scale is a method of classifying the 4 energy released by an earthquake without defining other parameters such ' as epicentral distance, the statement fails to define the associated seismic forces on the structure. An adequate analysis should state, in appropriate units, the ground acceleration, velocity, and displacement ~ that the worst case earthquake could impose on the structure. The analysis should evaluate how well the various existing structural systems in the building would withstand these seismic effects.

2. Facility Description
a. Section 1.1 contains a brief description of activities formerly conducted at the site, but there is no description of the activities currently authorized or conducted. The plan should describe the current activities.
 /          b. Section 1.1 and Table 1 describe the amount of licensed material

( possessed on September 21, 1995. This inventory is subject to change and could increase up to the possession limits stated in

I; e 4 D. Cesar 1 the license. The plan should state the total quantity of radioactive material authorized by the license. Typical quantities possessed at one time may be noted also.

c. Section 1.1 states that there are over 60,000 curies of cobalt-60 and 2200 kilograms of depleted uranium in the facility, but it is

' unclear where this material is typically located. Sections 1.2 , through 1.2.12 only identify the location of approximately 34,000 [ curies of cobalt-60. The typical storage locations for the remaining material authorized by the license should be identified. , d. The plan still lacks a detailed site drawing showing the exterior features of the building and property described in Section 1.2 of Regulatory Guide 3.67 (see previous comment II.8). A detailed drawing of the exterior features of the site must be provided in addition to the interior floor plans. In addition to detailed i ' information about the licensee's property, the drawing should show l the pump house on Mandalay Avenue, the rail line that runs past the facility, and the nearest residents in each direction.

e. The terminology used to describe areas in the facility is still

( inconsistent (see previous comment II.D). Section 1.2 refers to a l shielded work room on the main floor, but this term does not 1 appear in the following sections or on Figure 3/ Appendix B. Section 1.2 refers to a mechanical equipment room and a ' 4 ventilation system equipment room on the second floor, but these i areas are labeled as the clean equipment room and HEPA equipment room in the following sections and Figure 4/ Appendix B. Section 1.2 refers to a source storage area and irradiation facility in the basement, but Section 1.2.3 discusses a source garden, and . Figure 2/ Appendix B does not identify any of these areas in the basement. Consistent terminology should be used and all areas discussed in the text should be indicated on the drawings. 4

f. Section 1.2.3 states that there is an L-shaped shield of sand- -

filled vaults on two sides of the source garden in the basement,

but the floor plan in Figure 2/ Appendix B does not show the shield. Significant safety features such as the sand shield, the emergency generator, fire pull stations, and storage locations of emergency response kits should be shown on the floor plans. The floor plans should also identify where electrical and natural gas services enter the building.
g. Section 1.3 states that Figure 5 identifies the facility and its proximity to near-site structures. It states that Figure 5 shows the location of schools, hospitals and fire stations also. Figure 5 appears to be a poor quality copy of a street map and. neither

( the licensee's building nor any structures within 1 mile of the site are clearly identified. Figure 1 does not provide an i l i

a 8 D. Cesar adequate picture of the area near the site either. The plan  ! 1 ' should contain a reasonably detailed drawing of the site . area as described in Section 1.3 of Regulatory Guide 3.67 (see previous comment II.F). The plan should also contain a U.S. Geological Survey topographical map (7.5 minute series).

4. Types of Accidents i
a. The discussion on page 2-2 refers to guidance issued by the ,

International Commission on Radiological Protection (ICRP). This I guidance is not directly applicable to facilities in the United States. The guidance applicable to protecting the public in this country is contained in the " Manual of Protective Action Guides and Protective Actions for Nuclear Incidents" issued by the U.S. Environmental Protection Agency (EPA 400-R-92-001). The plan should refer to this guidance regarding offsite protective action recommendations.

b. We have a number of concerns regarding the analysis in Section 2.1.1 and Appendix C of potential doses from a fire (see previous comment IV.A)., Appendix C states that the source term for the
/
   \

worst case fire was assumed to be 40.4 curies, but the basis for that number is not provided. This does not appear to be a  ; conservative assumption because the revised AMS license application dated October 30, 1995 requests a possession limit of 4 50 curies for packaged waste and surface contamination, and there is no explanation why the source term should not include bulk - quantities of cobalt-60 from containers ruptured by one of the accidents postulated in Chapter 2 such a gas line explosion, train derailment, or earthquake. In addition, we disagree with the statement in footnote 40 that a 10-meter release height is a conservative assumption. A ground level release with no plume rise would maximize the offsite dose estimate. We note that the CAP 88-PC computer code is not intended to estimate short term doses resulting from an unplanned release during an emergency. Using a 40-curie source term, we estimated an inhalation dose at 100 meters of 7.7 millirem using the hand calculation in Section 2.1.3 of NUREG-1140, "A Regulatory Analysis on Emergency Preparedness for Fuel Cycle and Other Radioactive Material Licensees," January 1988. This estimate is over an order of magnitude greater than the 0.2 millirem dose estimated by the i CAP 88-PC code. A more detailed and conservative analysis using , more appropriate calculational methods should be provided. (. 2

il . D. Cesar c. Section 2.1.2 and Appendix C state that an earthquake could create a 100 millirem / hour dose rate 20 feet beyond the outside wall of the source garden. The plan should state the distance at'which the dose rate would drop below 2 millirem / hour and whether that location is in an area accessible to the public. In addition, we attempted to run the Microshield code using the assumptions stated in Appendix C but we could not duplicate the results stated in the , plan. The input parameters and assumptions should be described in i enough detail to permit us to duplicate and evaluate the calculation. l l

d. Section 2.1.3 states that a tornado would not compromise the 1

structural integrity of restricted areas and references the ' Engineers Opinion Report issued by Neff & Associates. Although this report states that portions of the building contained within the bunker-type construction would not sustain any appreciable ' distress, it also states "that it is scientifically certain that  ! a tornado passing over this facility would impose significant structural damage" to other parts of the building. Restricted 1 1 areas on the second floor and in the warehouse areas of the first floor could be , completely demolished by a tornado releasing (' radioactive materials in those areas. Section 2.1.3 should i \ provide a more accurate description of the potential damage from a tornado, and postulate the maximum amount of radioactive material that could be in these areas as a result of routine storage, ' preparation for shipments, or other operations. '

5. Classification and Notification 1

i

a. Section 3.2 is still inconsistent with the notification '

requirements in the regulations (see previous comment III.A).  ; Pursuant to 10 CFR 30.32(1)(3)(viii), the plan must contain a ' clear commitment to notify appropriate offsite response organizations promptly after declaring an Alert or Site Area Emergency (SAE). The plan should not differentiate between these - classifications or give the impression that the licensee can needlessly wait a full hour before notifying offsite officials of an Alert declaration. In addition, the plan must clearly state that the licensee shall notify NRC immediately after notification of local and State authorities. Simply stating that NRC will be notified within one hour is not sufficient.

b. Several of the emergency action levels (EALs) in Attachment 1 of Appendix D are defined in terms of potential exposure rates or actual exposures. It is unclear how the Emergency Manager will be able to identify these conditions in a timely manner. It is unacceptable to wait for survey results if it will take more than

( 15 minutes to get them. EALs must be defined in terms of conditions that are apparent within the first few minutes of an

  .                                                                                     i-D. Cesar                                                 emergency. This is especially important during nonworking hours.

If an alarm goes off and the condition cannot be verified within 15 minutes, the Emergency Manager should act conservatively by declaring an emergency and initiating notification of offsite response organizations. The EAls should be redefined.

c. The offsite response organizations listed in Attachment 1 of -

Appendix D to receive a notification vary depending on the event. Each of the organizations identified as a "first responder" should be notified every time an Alert or Site Area Emergency is declared. In addition, all NRC notifications should be made to the NRC Operations Center. The Operations Center coordinates event reports with regional staff.

d. The plan does not establish the initial recommendations for offsite protective actions that will be included in the initial -

SAE notification to offsite organizations (see previous comment ' III.B). If an accident has the potential to require road blocks or other protective actions offsite, the licensee should act conservatively and make initial recommendations to offsite officials until the scope of the accident can be verified. This ( would include recommendations to stop traffic on the rail line or rope off potentially contaminated areas. Protective action recommendations should be addressed in Sections 3.1.4 and 3.3, and Appendix D.

e. Section 3.3 should specify the minimum frequency of updates to -

offsite response organizations after the initial notification (see previous comment IX.8). The response to our previous comment states that Section 8.3 was being modified to include the information, but the revision does not include this information.

6. Responsibilities
a. Section 4.2 states that an environmental consulting firm and a '

certified health physicist have been retained to assist in all matters relating to radiation safety and environmental issues. Figure 7 only shows the environmental consultant as part of the AMS emergency organization and it is unclear what function either of these parties would perform during an emergency. The roles of the environmental consultant and the certified health physicist should be clarified.

b. The response to our previous comment V.E states that letters from the hospital, fire department, and police department will be included in the plan. Section 4.3 states that Appendix E contains letters of agreement from " applicable first responders". listed in

(. Table 2 along with information on the agreed upon means of communication and notification with these agencies. Contrary to

  • 1 D. Cesar these statements, Appendix E only contains letters from the fire 4

department and two State agencies and there is almost no information about methods of communication. Complete documentation that offsite response agencies are aware of, and have agreed to their roles as specified in the plan should be p provided. i 4

c. The response to our previous comment V.G concerning the capabilitics of offsite organizations and rumor control arrangements stated that the plan would be modified to address these items. The plan does not include this information. In addition to other capabilities, Section 4.4 should specifically address whether local fire or police personnel have the capability to conduct radiation surveys.
d. Section 4.4 fails to describe some of the organizations listed in Table 2. A description of the responsibilities and capabilities of each of these organizations should be provided.
e. In Table 2, the organizations do not appear to be listed in the  !

order they would be called. The NRC Operations Center should be ' ( notified immediately after appropriate local and State organizations. Table 2 and Attachments 2 and 3 of Appendix D should be revised to prevent confusion.

7. Response Measures i i
a. The terms used for accidents are still inconsistent (see previous I

comment IV.8). The plan should establish the terms for accidents  ; in Chapter 2 and these terms should be used consistently throughout the rest of the plan. The terms we found are listed below: Chapter 2 Chapter 5 Appendix 0 Fire Fire Loss or Theft Earthquake Natural Phenomenon Unauthorized Entry Tornado Tornado Power Failure Vandalism Vandalism Minor Spill or Flood Flood Release Industrial Facility Major Spill or Impact Release i Underground Gas Line Minor Fire Explosion Significant Transportation Exposure i Accident Fire, Explosion or Other Major Emergency l l I

   .-                                                                                           1:

D. Cesar b. We disagree with the statement ir Section 5.3 that no actions can be taken to mitigr.te the consequeaces of a tornado or flood. When there is advance warning of severe weather conditions, we would expect the licensee to take reasonable steps to secure the  ; facility and minimize releases. If a tornado warning is issued for the site area, we would expect the licensee to declare an alert and take immediate steps to secure licensed materials especially in the warehouse portions of the facility. Section 5.3 and Appendix D should address the mitigating actions that will be taken if a severe weather warning is issued. l

c. Section 5.4.1 states that evacuated personnel will assemble at the i designated muster area, however the location of the muster area is  :

not sp ified and it is not shown on any of the drawings. The l locatio yf the muster area should be identified.

d. Section 5.4.1 does not describe provisions for search and rescue j operations if the RSO cannot account for all personnel. This j issue should t e addressed. '
e. Section 5.3 states that licensee staff will assist the fire

( department by conducting surveys during fire fighting efforts. Footnote 25 on page 5-2 states that in the event of a fire, only self-contained breathing apparatus (SCBA) should be worn, and full- or half-face respirators are not permitted. Section 6.4 states that respirators are maintained in the building and Table 3 indicates that a respirator is maintained at the pump house. - Please indicate what types of respirators are maintained in the building and the pump house. SCBAs should be available in the building and the pump house to respond to a fire.

f. Section 5.5 still does not address informed consent (see previous comment VI.A). The plan should describe how the Emergency Manager will verify that a volunteer is aware of the health risks before authorizing emergency exposures exceeding 25 rem. ~
g. Issuing dosimeters to firemen is not addressed in section 5.11 of Appendix D. This issue should be addressed in the implementing procedure.

I

h. Section 5.5 states that personnel will be monitored for contamination, but there is no description of the procedures for decontaminating personnel if contamination is found. This issue should be addressed.

( 6

i 2 D. Cesar .

i. Section S.6 states that the Cleveland Emergency Medical Service personnel receive annual training, but it is unclear who . conducts this training. In addition, there is no letter of agreement confirming that this organization has agreed to transport contaminated individuals. The training issue should be clarified and a letter of agreement should be provided.

j. Sections 5.6 and 5.7 state that the University Hospital of [ Cleveland is capable of diagnosing and treating radiation injuries, and has a Radiation Safety Officer who will perform surveys and control contamination. There is no letter of agreement from the hospital verifying its capabilities and confirming its agreement with these statements (see previous comment VI.D). A letter of agreement should be provided.

8. Equipment and Facilities j
a. Section 6.2 does not describe any communications capability at the alternate command center (the pump house). Both the primary and I alternate command center should have a telephone or other means of communication with offsite organizations.
b. Section 6.4 states that dosimeters and survey meters are stored in the " instrument calibration room" shown in Figure 3, and that protective clothing and respirators are stored "in the locker room or storage room." There is no instrument calibration room [

indicated on Figure 3 and the storage location for the protective - clothing is too vague. It is unclear whether these locations would be accessible during postulated accidents. Section 6.4 should use terminology that is consistent with the labels on the drawings. It would be helpful if the command center, equipment storage locations, first aid kits, emergency generator and.other features related to emergency response were specifically indicated on the drawings.

c. Section 6.4 and Table 3 only list pocket dosimeters. While pocket dosimeters are useful for real-time dose assessment, they are not very accurate. The licensee should provide more accurate dosimeters (e.g., film badges or TLDs) that can be used to verify personnel exposures after an emergency is brought under control.
d. Table 3 indicates that only one respirator and two pocket dosimeters are maintained at the pump house. This does not appear to be sufficient to equip the licensee's staff and offsite rescue personnel that may need to enter the building. The pump house should contain enough respirators and dosimeters to equip the licensee's emergency staff, and enough additional dosimeters to

( monitor hose crews, search and rescue teams, or other offsite rescue personnel.

                                         .                                                     a t

D. Cesar  : r! t,

e. Table 3 indicates that only one frisker and one survey meter are maintained at the pump house. We believe that at least one i additional survey meter should be provided at this location for backup. The range of the survey meters should be specified also.
9. Maintainino Emeroency Capabilities -

t a. Section 7.2 should specifically state that the risks of emergency { doses will be covered in the training of offsite rescue personnel so they can decide in advance what risks they would be willing to accept during lifesaving operations. Numerical estimates of 1 i health risks are provided in the EPA Manual of Protective Action Guides.

b. Section 7.3 should state that the exercise objectives and scenario shall be provided to NRC in advance (typically 60 days) to allow NRC to review and comment on the exercise. I
c. Sections 7.4 and 7.5 should specify who is responsible for tracking findings from critiques and audits, and verifying that the findings are closed out.
d. Section 7.5 states that there will be periodic audits. The plan should clearly state that there will be annual audits.
e. Section 7.6 should state that the shelf-life of protective clothing and other degradable materials shall be tracked and. -

changed out on a regular basis. In addition, provisions for calibration of the stack monitor and testing of the emergency generator should be described.

      ?,0.       Records Section 8.1 should specify that records of incidents shall be                 '

permanently retained with the licensee's decommissioning records. "

11. Format
a. The plan still does not have a list of effective pages that a reader can use to verify his copy is complete and up-to-date (see previous comment XII). A list of effective pages should be provided.
b. Although Figures 2, 3, 4, and 5, and Appendix B have cover pages '

that are numbered, the actual drawings are not numbered or identified as part of the emergency plan. The drawings can be removed from the plan without creating any gaps in the p, age ( numbers. Every page of the plan, including the drawings, must be identified with a page number and a revision number /date. r L

I! a l' D. Cesar >

  • (

i . 1 We will continue our review of your application upon receipt of this . information. Please reply in duplicate, within 30 days, and refer to Control  : ! Number 98538. ' s If you have any questions or require clarification on any of the information stated above, you may contact us at (708) 829-9887. ), Sincerely, , 1 i a j 4-Original Signed By John R. Madera, Chief Nuclear Materials Licensing Branch I License No. 34-19089-01 Docket No. 030-16055 l l f II

                                                                                                                                      )

l l i DOCUMENT NAME: M:\AMS.EP Ta sessive a sepy of this document, indicate in the bec *c" = Copy without enclosures *r = Copy with enclosures T = No copy 0FFICE DNMS/RIII l C. DNMS/RIII l c. IM08/NMSS M , t. DNMS/RTN l e, l NAME KGNULL: jaw U MWEBER W KRAMSEY P Q','I JRM30 ERA)b DATE 02/ftJ96 02/T)/96 02/ W 96 t 07/;t7/96/ [ OFFICIAL RECORD COPY u 6-}}