CY ENFORCEMENT CONFERENCE Update on Haddam Neck's Enforcement Conference Date: October 18 at 9am Place: Berlin, CT, Hawthorne Inn Try to make this conferencel We need to show the NRC that we are paying close attention not only of their ability to identify problems but also their ability to enforcement compliance.
The enforcement conference will involve violations identified in Haddam Neck Inspection Reports:
96-08, 96-06,96-201, and 95-27 (specifically the LPSI system).
If possible, review these reports prior to the conference.
Reports 96-08 and 96-201 are on the NRC homepage.
A message from the Citizens Awareness Network Editors Note:
This is likely to be a very significant conference and the first ever in the State of Connecticut. The issues to be discussed are much more significant i
than the recent CY event with the nitrogen.
This will discuss the fact that had a LOCA occured, it was likely there would be no long term Emergency Core Cooling.
There is no other safety system to back these systems up.
If a l
loss of power occured coincident with a LOCA (design basis event), the containment may have been breached at the same time.
This could have resulted in the loss of the three principal barriers (fuel clad, primary system and the containment).
This condition existed for the past 28 years.
Paul M. Blanch Energy Consultant 135 Hyde Rd.
)
West Hartford CT 06117 i
Voice 860-236-0326 Fax 860-232-9350 9610310104 961024 PDR ORQ NRRAPDR