ML20134C853

From kanterella
Jump to navigation Jump to search
Submitts Follow Up to Discussion on Getting NRR Help on Various Insps Planned for Plant
ML20134C853
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/24/1996
From: Stolz J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20134C519 List:
References
FOIA-96-351 NUDOCS 9702040095
Download: ML20134C853 (2)


Text

,

!f s

4

.j.

1 From:

John Stolz i

To:

LEN,SFS,RWC Date:

6/24/96 5:02pm

,[

1 !

Subject:

SALEM ASSISTANCE This is followup to our discussions on getting NRR help on various inspections planned for The Salem t

facility. I have listed personnel in my Directorate who can be available for specific short-term assignments at Salem during the dates noted. This also entails deferring some NRR work assignments during these periods which we are prepared to do to meet Salem priorities through

}

September 1996.

[!

Len Olshan: July, August, September except week of 7/15 i

Don Brinkman: July 15 - August 15; Sept 15 -30 Jake Zimmerman: Wk of July 8; August; September.

Tilda Liu: Wk of August 5 Dave Jaffe: flexible between Hope Creek 40500 and Salem RATI (TBD)

I have a window of the Wks of July 8 and 15 during whichwe would spend 34 days inspecting the completeness of Self Assessment & Human Resources Action plans Wks of August 5; September 9 for Salem Assessment Panel business.

if help is needed from the NRR/DE Electrical Engineering Br, let's identify the Tech restart Issue (eg

[,

EDSFl Followup;EDG load margins) and the realistic target for our inspection.

Steve Varga did not offer encouragement on getting more help since, among other things, we are swamped with reponses to Controlled correspondence. A realistic schedule from the licensee is needed for our followup discussion on this..

i CC:

LNO,DSB1,JIZ,TYL1,DHJ l

l

.h.

i e

l 97@2040095'970116 PDR FOIA b

O ofEILL96-351 PDR g

/

I i

/

Mall Envelope information

Subject:

SALEM ASSISTANCE-Forwarded

-r i'

Creation Date:

6/25/96 7:30am From:

Larry r4icholson Created By:

KPD1.KPP2:LEN Recipients Post Office KPD1.KPP2 i

arb (A. Randolph Blough) csm (Charles Marschall)

A' emk (Eugene Kelly) asb (G. Scott Barber) jtw1 (James Wiggins) rwc CC (Richard Cooper)

I whr (William Ruland) l Post Office WND2.WNP3 Ino CC (Leonard Olshan)

[,l Domain. Post Office Route i

KPD1.KPP2 KPD1.KPP2 WND2.WNP3 WND2.WNP3 Files Size Date & Time Mail MESSAGE 129 06/25/96 07:30am

(

Options Expiration Date:

None Priority:

Normal Reply Requested:

No Return Notification::

None Concealed

Subject:

No Security:

Normal Ji k

f' k

/