ML20134C598
| ML20134C598 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/29/1997 |
| From: | Miraglia F NRC (Affiliation Not Assigned) |
| To: | Mills G AFFILIATION NOT ASSIGNED |
| Shared Package | |
| ML20134C601 | List: |
| References | |
| NUDOCS 9702030208 | |
| Download: ML20134C598 (5) | |
Text
_. _ _ _ _. _ _ _.. _ _
January 29, 1997 l
Mr. Glen R. Mills P.O. Box 3393 Mission Viejo, CA 92690
Dear Mr. Mills:
I am responding to your letter of January 8,1997, to Chairman Jackson of the U.S. Nuclear Regulatory Comission (NRC) in which you forwarded a copy of a letter dated January 8,1997, to Samuel Collins of the NRC from David Lochbaum of the Union of Concerned Scientists.
You state that in his letter, Mr. Lochbaum alleged that the NRC staff made a technical error in its evaluation of the 10 CFR 2.206 petition on the Millstone Unit I refueling i
practices by using spent fuel pool water temperature as the limiting factor when the design and licensing basis for decay time has nothing to do with decay heat removal but is based exclusively on the offsite dose consequences.
l As you may be aware, Mr. Lochbaum retracted his January 8 letter in a letter dated January 17, 1997. As noted by Mr. Lochbaum in his retraction letter, all of the Millstone Unit 1 fuel offloads were bounded by the fuel-handling accident analysis previously performed by the licensee.
If you have any other questions on this issue, please contact Mr. Stephen Dembek at (301) 415-1455. Mr. Dembek is the petition manager for the 10 CFR 2.206 petition that Mr. Lochbaum referenced in his letters.
Sincerely, Original signed by Frank J. Miraglia Frank J. Miraglia, Jr., Acting Director Office of Nuclear Reactor Regulation NRC HLE CMTR COPY DOCUMENT NAME:
G:\\DEMBEK\\GT970036.GRN
- See previious concurrence Ta seceive e copy of thee Jecument,insucete in the box:
- C" = Copy without ettechment/ enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE SP0-L:PM lC SPO-L:LA l
- TECH ED l SP0-L:DD l
- SP0:D lc5 V (A) l NAME SDembek/)./s LBerry/AEBCalure PMcKee*
WTravers F){ Hblia DATE 01/2f/97 01/24/97
- 01/22/97 01/27/97 01/27/97 MJ1 /97 0FFICIAL RliCORD COPY
"(
9702030208 970129 PDR ADOCK 05000245 P
ppg
arco
["
4 UNITED STATES g
j NUCLEAR REGULATORY COMMISSION
/g WASHINGTON, D.C. 206tWM001 o
January 29, 1997 Mr. Glen R. Mills P.O. Box 3393 Mission Viejo, CA 92630 1
Dear Mr. Mills:
1 I am responding to your letter of January 8,1997, to Chairman Jackson of the U.S. Nuclear Regulatory Comission (NRC) in which you forwarded a copy of a letter dated January 8, 1997, to Samuel Collins of the NRC from David Lochbaum of the Union of Concerned Scientists.
You state that in his letter, i
Mr. Lochbaum alleged that the NRC staff made a technical error in its evaluation of the 10 CFR 2.206 petition on the Millstone Unit I refueling practices by using spent fuel pool water temperature as the limiting factor when the design and licensing basis for decay time has nothing to do with decay heat removal but is based exclusively on the offsite dose consequences.
As you may be aware, Mr. Lochbaum retracted his January S letter in a letter dated January 17, 1997. As noted by Mr. Lochbaum in his retraction letter, all of the Millstone Unit 1 fuel offloads were bounded by the fuel-handling accident analysis previously performed by the licensee.
If you have any other questions on this issue, please contact Mr. Stephen Dembek at (301) 415-1455.
Mr. Dembek is the petition manager for the 10 CFR 2.206 petition that Mr. Lochbaum referenced in his letters.
Sincerely, A
n l7527/L }k, )r2f O'
Frank t.
irag i, Jr., A t 9 Director Office o Nuclear Reactor Regulation
- ;r, r
p s
s, DISTRIBUTION:
DocketiF11er(50-245);(w/orjgina.liinEosiing);.
PUBLIC'(w/ incoming)
^ ' " " " ~
EDO #970036 HThompson k
EJordan PNorry
+
JBlaha FMiraglia/AThadani RZimmerman BSheron TMartin SP0 Reading (w/ incoming)
WTravers PMcKee MBoyle (e-mail only MLB4)
OGC OPA SECY # CRC-97-0038 NRR Mailroom (ED0 #970036 w/ incoming) (0-12G18)
N01 son SRohrer SDembek (w/ incoming)
LBerry HMiller, RI JDurr, RI OCA
\\
1
' ~
9qv\\
\\
r 030051 s
4
4 s/
og
%a
(~.
., ; - 7 b
bb%hOU EDO Principal Correspondence Control l
FROM DUE: 02/03/97 EDO CONTROL: G970036 DOC DT: 01/08/97 FINAL REPLY:
Glen R. Mills TO:
Chairman Jackson FOR SIGNATURE OF :
- GRN CRC NO: 97-0038 Miraglia DESCs ROUTING:
SAFETY CONCERNS AT MILLSTONE (REFERENCE ERNEST Thompson HADLEY/ GEORGE GALATIS 2.206 PETITION)
Jordan Norry Blaha Miller, RI DATE: 01/17/97 i
ASSIGNED TO:
CONTACT:
NRR Miraglia SPECIAL INSTRUCTIONS OR REMARKS:
REF: ED0 603 NRR RECEIVED:
JANUARY 17, 1997
~ ~ ~ ~ ~,
NRR ACTION:
SP0: TRAVERS p-
[gyt{h{
I
~'
NRR ROUTING:
MIRAGLIA c. c r-j O,u,c g { g y'.g viUK. uN C -
THADANI ZIMMERMAN i
t-SHERON i
d@j_j Ng MARTIN
{
B0HRER
- ~
J j
o
.o 5
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET e
PAPER NUMBER:
CRC-97-0038 LOGGING DATE: Jan 13 97 ACTION OFFICE:
EDO AUTHOR:
GLEN MILLS AFFILIATION:
1 l
ADDRESSEE:
CHAIRMAN JACKSON LETTER DATE:
Jan 8 97 FILE CODE: IDR-5 MILLSTONE
SUBJECT:
MILLSTONE UNIT 1 ACTION:
Direct Reply DISTRIBUTION:
CHAIRMAN l
SPECIAL HANDLING: SECY TO ACK l
CONSTITUENT:
R/3/97 NOTES:
DATE DUE:
an M 97 I
SIGNATURE:
DATE SIGNED:
l AFFILIATION:
l i
l l
l 4
l l
O
' G970036 l
l i