| | | Reporting criterion |
|---|
| 05000482/LER-1993-001, :on 930304,determined That All Time Delays for RCP Undervoltage Trip Function Not Included in Response Time Testing of Reactor Trip Circuit.Caused by Inadequate Westinghouse TS Development Procedures Revised |
- on 930304,determined That All Time Delays for RCP Undervoltage Trip Function Not Included in Response Time Testing of Reactor Trip Circuit.Caused by Inadequate Westinghouse TS Development Procedures Revised
| |
| 05000482/LER-1993-002, :on 930310,CPIS & CR Ventilation Isolation Signal Generated by Signal from Containment Purge Radiation Monitor.Caused by Design Misapplication of Target Rock Sovs. Target Rock Valves Will Be Replaced |
- on 930310,CPIS & CR Ventilation Isolation Signal Generated by Signal from Containment Purge Radiation Monitor.Caused by Design Misapplication of Target Rock Sovs. Target Rock Valves Will Be Replaced
| 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000482/LER-1993-004, :on 930316,discovered That Broken Fuel Rod Segment Protruding Out of Fuel Assembly F67 at Core Position H-6 Due to grid-to-rod Fretting.Detailed Remote Visual Insp Conducted |
- on 930316,discovered That Broken Fuel Rod Segment Protruding Out of Fuel Assembly F67 at Core Position H-6 Due to grid-to-rod Fretting.Detailed Remote Visual Insp Conducted
| 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(B) |
| 05000482/LER-1993-004-01, :on 930316,broken Fuel rod,11-12 Inches in Length,Protruded Out of Fuel Assembly F67 at Core Position FH-6.Caused by Grid to Rod Fretting Failures.Util Evaluating Fluid Elastic Instability |
- on 930316,broken Fuel rod,11-12 Inches in Length,Protruded Out of Fuel Assembly F67 at Core Position FH-6.Caused by Grid to Rod Fretting Failures.Util Evaluating Fluid Elastic Instability
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000482/LER-1993-005, :on 930322,maint Electrician Skipped Step in Suppl Work Instruction to Replace/Refurbish Actuator for Centrifugal Charging Pumps.Caused by Personnel Error. Electrican Counseled & Will Be Disciplined |
- on 930322,maint Electrician Skipped Step in Suppl Work Instruction to Replace/Refurbish Actuator for Centrifugal Charging Pumps.Caused by Personnel Error. Electrican Counseled & Will Be Disciplined
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(1) |
| 05000482/LER-1993-006, Forwards LER 93-006-00 Re Exposure of Individual in Excess of Applicable Limits in 10CFR20.101 | Forwards LER 93-006-00 Re Exposure of Individual in Excess of Applicable Limits in 10CFR20.101 | |
| 05000482/LER-1993-006-01, :on 930402,hot Particle Picked Up During Filling & Venting of SI Sys Resulted in Exposure Exceeding 10CFR 20.101 Requirements.Operations Qualification Card Checklist Procedures Will Be Revised |
- on 930402,hot Particle Picked Up During Filling & Venting of SI Sys Resulted in Exposure Exceeding 10CFR 20.101 Requirements.Operations Qualification Card Checklist Procedures Will Be Revised
| |
| 05000482/LER-1993-007, :on 930413,determined That Surveillance Test Procedure Re RHR Sys Inservice Pump B Test Not Accomplished by 930410.Caused by Lack of Oversight of Surveillance program.Past-due Notice Proceduralized |
- on 930413,determined That Surveillance Test Procedure Re RHR Sys Inservice Pump B Test Not Accomplished by 930410.Caused by Lack of Oversight of Surveillance program.Past-due Notice Proceduralized
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(1) |
| 05000482/LER-1993-008, :on 930416,flux Doubling Circuit Blocked Due to Personnel Error Re Misunderstanding of Applicability of Ts. Issued Memo & Initiated Change to TS Bases |
- on 930416,flux Doubling Circuit Blocked Due to Personnel Error Re Misunderstanding of Applicability of Ts. Issued Memo & Initiated Change to TS Bases
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000482/LER-1993-009, :on 930504,noted That Supervising Operator Erroneously Instructed RO to Reset Steamline LP SI Signal Rather than Block SI Signal.Caused by Personnel Error. Personnel Have Been Directed to Review Event |
- on 930504,noted That Supervising Operator Erroneously Instructed RO to Reset Steamline LP SI Signal Rather than Block SI Signal.Caused by Personnel Error. Personnel Have Been Directed to Review Event
| 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000482/LER-1993-010, :on 930508,Mode 3 Entered from Mode 4 W/Both MDAFWPs Rendered Inoperable by Handswitches Being Placed in pull-to-lock.Caused by Failure to Control Work Activity.Mgt Expectations Clarified |
- on 930508,Mode 3 Entered from Mode 4 W/Both MDAFWPs Rendered Inoperable by Handswitches Being Placed in pull-to-lock.Caused by Failure to Control Work Activity.Mgt Expectations Clarified
| 10 CFR 50.73(a)(2)(1) |
| 05000482/LER-1993-011, :on 930518,nuclear Plant Instrumentation Sys Axial Flux Difference Limits Were Not Updated W/Ts Due to Inadequate Review of Colr.Initiated WR & Computer Software Mod Request |
- on 930518,nuclear Plant Instrumentation Sys Axial Flux Difference Limits Were Not Updated W/Ts Due to Inadequate Review of Colr.Initiated WR & Computer Software Mod Request
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000482/LER-1993-012-01, Forwards LER 93-012-01 Re Noise Event Experienced During heat-up Following Sixth Refueling Outage.Ler Addresses Results of Thermal Expansion Monitoring Program.New Info Noted by Rev Bars | Forwards LER 93-012-01 Re Noise Event Experienced During heat-up Following Sixth Refueling Outage.Ler Addresses Results of Thermal Expansion Monitoring Program.New Info Noted by Rev Bars | |
| 05000482/LER-1993-012, :on 930510,reported Unusual Noise Due to Small Frictional Force Release in RCS During heat-up.Implemented Thermal Expansion Monitoring Program in Refuel Viii to Aid in Identification of Locations of Restraint on RCS |
- on 930510,reported Unusual Noise Due to Small Frictional Force Release in RCS During heat-up.Implemented Thermal Expansion Monitoring Program in Refuel Viii to Aid in Identification of Locations of Restraint on RCS
| |
| 05000482/LER-1993-013, :on 930809,meteorological Tower de-energized for Mods & Declared Inoperable.Caused by Personnel Error. Meteorological Tower Drawing as-builts Established to Reflect Correct Field Wiring Configuration |
- on 930809,meteorological Tower de-energized for Mods & Declared Inoperable.Caused by Personnel Error. Meteorological Tower Drawing as-builts Established to Reflect Correct Field Wiring Configuration
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000482/LER-1993-014, :on 900501,essential Svc Water Low Flow Prior to Refueling Outage Occurred.Cause Unknown.Reportability Determination Process Revised,Rers Logged & Entered Into Tracking Database |
- on 900501,essential Svc Water Low Flow Prior to Refueling Outage Occurred.Cause Unknown.Reportability Determination Process Revised,Rers Logged & Entered Into Tracking Database
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2) |
| 05000482/LER-1993-015, :on 930317,breech of Containment Noted During Refueling Operations Due to Inadequate Procedural Guidance. Issued Procedure Change Mi 93-1274 |
- on 930317,breech of Containment Noted During Refueling Operations Due to Inadequate Procedural Guidance. Issued Procedure Change Mi 93-1274
| 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(x) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000482/LER-1993-016, :on 931101,individual W/Lapsed Fire Brigade Qualification Served as Member of Fire Brigade.Caused by Inadequate Verifying Qualifications Process.Verification Program Consolidated Under Fire Program |
- on 931101,individual W/Lapsed Fire Brigade Qualification Served as Member of Fire Brigade.Caused by Inadequate Verifying Qualifications Process.Verification Program Consolidated Under Fire Program
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |