ML20134B164

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-413/85-29 & 50-414/85-22 on 850624-28 & Notice of Violation
ML20134B164
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/05/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20134B167 List:
References
NUDOCS 8508150534
Download: ML20134B164 (2)


See also: IR 05000413/1985029

Text

fl CM

.

-

[

+e

3

1

AUG 05 BBS

uke Power Company

' ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT:

REPORT N05. 50-413/85-29 AND 50-414/85-22

On June 24 - 28, 1985, NRC inspected activities authorized by NRC License

No. NPF-35 and NRC Construction Permit No. CPPR-117 for your Catawba facility.

At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments.

The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

Your attention is invited to unresolved items identified in the inyection

report. These matters will be reviewed during future inspections

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

!

Roger D. Walker, Director

Division of Reactor Projects

l

Enclosures:

i

1.

Notice of Violation

l

2.

In'pection Report Nos. 50-413/85-29

and 50-414/85-22

c w/encls:

jR. L. Dick, Vice President - Construction

j

v0. W. Hampton, Station Manager

bec w/encls:

(See page 2)

8508150534 050005

PDR

ADOCK 05000413

G

PDR

' \\ 1206

F

3

.

.* i Y

Duke Power Company

2

pcc w/encls:

A V. Johnson, ELD

$. N. Jabbour, NRR

e

vM. E. Bolch, Station Emergency Planner,

Catawba Nuclear Station

B. Matthews, EPLB, IE HQS

&

'

. Heard, FEMA, Region IV

EP Section File

Document Control Desk

S, tate of South Carolina

ARC Resident Inspector

-

e

t

t

<<

K h

5

'f ,97/)

0 / N5

$

"

5

GRJ n n h a reed

0

37

5

it was violation &

'

indicated we

RII

RI

RII

should look at

h

M

'

VLBr(ownlee

severity level

CBurger

H

ance

closely.

07 y/85

85

/v/85

.

(

.

E.

.

.

.

.

.

. . .

.

.

.