ML20134B164
| ML20134B164 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 08/05/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20134B167 | List: |
| References | |
| NUDOCS 8508150534 | |
| Download: ML20134B164 (2) | |
See also: IR 05000413/1985029
Text
fl CM
.
-
[
+e
3
1
AUG 05 BBS
uke Power Company
' ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT N05. 50-413/85-29 AND 50-414/85-22
On June 24 - 28, 1985, NRC inspected activities authorized by NRC License
No. NPF-35 and NRC Construction Permit No. CPPR-117 for your Catawba facility.
At the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
Your attention is invited to unresolved items identified in the inyection
report. These matters will be reviewed during future inspections
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
!
Roger D. Walker, Director
Division of Reactor Projects
l
Enclosures:
i
1.
l
2.
In'pection Report Nos. 50-413/85-29
and 50-414/85-22
c w/encls:
jR. L. Dick, Vice President - Construction
j
v0. W. Hampton, Station Manager
bec w/encls:
(See page 2)
8508150534 050005
ADOCK 05000413
G
' \\ 1206
F
3
.
.* i Y
Duke Power Company
2
pcc w/encls:
A V. Johnson, ELD
$. N. Jabbour, NRR
e
vM. E. Bolch, Station Emergency Planner,
Catawba Nuclear Station
B. Matthews, EPLB, IE HQS
&
'
. Heard, FEMA, Region IV
EP Section File
Document Control Desk
S, tate of South Carolina
ARC Resident Inspector
-
e
t
t
<<
K h
5
'f ,97/)
0 / N5
$
"
5
GRJ n n h a reed
0
37
5
it was violation &
'
indicated we
RII
RI
RII
should look at
h
M
'
VLBr(ownlee
severity level
CBurger
H
ance
closely.
07 y/85
85
/v/85
.
(
.
E.
.
.
.
.
.
. . .
.
.
.