ML20134A124

From kanterella
Jump to navigation Jump to search
Requests Equipment Layout Drawings,P&Ids,Electrical one-line Diagrams & Miscellaneous Drawings Necessary to Complete Lasl Vital Area Study Per Regulatory Effectiveness Review
ML20134A124
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/29/1985
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Taylor J
DAIRYLAND POWER COOPERATIVE
References
NUDOCS 8511040200
Download: ML20134A124 (2)


Text

e- - - -

w ~.-

OCT 29 %B5.

Docket No. 50-409 Mr. J. W. Taylor General Manager Dairyland Power Cooperative 2615 East Avenue South Lacrosse, Wisconsin -54601

Dear Mr. Taylor:

In preparation for the future Regulatory Effectiveness Review of the La Crosse plant, the Regulatory Effectiveness Review team has indicated that certain 4 plant drawings are necessary to complete their review of the Los Alamos National I Laboratory, vital area study of the La Crosse plant.

It is therefore requested that a copy of each drawing (Size D or larger) identified in the enclosure to this letter be forwarded to the individual identified below by February 1, 1986.

Ms. Kathleen McConnell Unite

  • States Nuclear Regulatory Commission 1 Division of Safeguards, NMSS Mail Stop 881-SS Washington, D.C. 20555 Should you or your ataff have any questions concerning this request, please contact Ms. McConnell at (301) 427-4720 or Mr. James R. Creed at (312) 790-5643.

Sincerely, ddbY k A. Hind, Director ivision of Radiation Safety and Safeguards

Enclosure:

As stated ,g6 0 k cc w/o enclosure:

C. O. Thomas, SSPB/NRR R. A. Erickson, SGAS/NMSS l g NRR Docket File 8511040200 851029 ADOCK 050 49 SG Case File SG Reviewer File

$DR ]

SG Inspector File RIII II RIII RIII RIII /f Ker d Ax$ n Bo n 10/g/85 io/u //

r-

).

LA CROSSE DRAWING LIST FOR VITAL AREA ANALYSIS

1. ~ Equipment Layout Drawings
  • 10.1 Main Floor of the Turbine Bldg. , EL 668'-0" (FSAR Fig.No.)'
  • 10.2 Mezzanine Floor of the Turbine Bldg. , EL 654'-0" (FSAR Fig.No.)
  • 10.3 Grade Floor of the Turbine Bldg. , EL 640'-0" (FSAR Fig.No.)

e

2. Piping and Instrument Diagrams
  • 41-400-193 Demineralized Water System Flow Diagram. (FSAR Fig.No.)

83-51-002 Emergency Service Water Supply System

  • 41-300-084 Shutdown Condenser System Flow Diagram (FSAR Fig.No.)
  • 41-300-085 Main Coolant System Flow Diagram (FSAR Fig.No.)
3. Electrical One Line Diagrams
    • 13.2 LACBWR Power Distribution Drawing (Operating Manual Fig. No.)
      • Offsite Power or Main Station Generator LACBWR 125-V DC Distribution System (Operating Manual Fig. No.;
    • 18.4
4. Misec11aneous Drawings Site Layout Plan showing arrangement and location of structures.
  • Need equivalent engineering drawings for the FSAR Figure numbers listed above.
    • Need equivalent engineering drawings for the Operating Manual Figure numbers listed above.
  • **N, drawing number availabic.

^ ' ~ n e- ,- .. ~ . ..___