Addendum 1 to 850611 Final Deficiency Rept,Item 207 Re Cable Sizing Deficiency.Design Guideline Issued Requiring Cable Size Verification Based on Feeder Breaker Rating,Connected Load & Circuit Length
ML20133P932
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/19/1985
From: Watson R
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
207, NRC-379, NUDOCS 8508140539
Download: ML20133P932 (2)


Text

.

GP&L Caroli-sa Power & Leght Company usumasamme=== cumuumuman P. O. Box 101, New Hill, NC 27562 July 19, 1985 Dr. J. Nelson Crace NR(@79 United States Nuclear Regulatory Commission a

Region II 101 Marietta Street, Northwest (Suite 2900) g' Atlanta, Georgia 30323 m

CAROLINA POWER & LICHT COMPANY C

/

SHEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - UNIT 1 cn CABLE SIZINC DEFICIENCY, ITEM 207

Dear Dr. Crace:

Attached is Addendum No. I to the final 10CFR50.55(e); Report issued to the NRC on June 11, 1985, for the above subject deficiency.

This addendum more completely addresses our corrective actions taken to resolve this item.

If you have any questions regarding this matter, please do not hesitate to contact me.

Yours very truly, A

R. A. Watson Vice President Shearon Harris Nuclear Power Plant RAW:sae Attachment cc: Messrs. C. Maxwell /R. Prevatte (NRC-SHNPP)

R. C. DeYoung (NRC) 8508140539 850719 PDR ADOCK 05000400 1

PDR I

NBI-NRC-379/1-OS5

\\

gJ7

s a

49 4

1 1

SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 i

r CABLE SIZINC DEFICIENCY l

ADDENDUM NO. 1 TO FINAL REPORT - ITEM 207 ISSUED JUNE 11, 1985 I

JULY 19, 1985 I

l Under Corrective Action, paragraph should be changed to read as l

follows:

j The subject #10 AWC conductor was replaced with a #2 AWG conductor per FCR-E-4052.

A review has also been conducted by Ebasco using the latest issue of the power distribution and motor data sheets (drawing 2166-B-041) to assure safety related cable sizes are suitable for the breaker rating.

Administrative action has been taken to ensure closer monitoring and control of cable j

size design in HPES electrical.

In addition, a design i

guideline has now been issued which requires that cable l

size be verified based on the feeder breaker rating, l

connected load and circuit length, before cable routes and sizes can be released by HPES.

l l

i NBI-NRC-379/3-OS5

- -.