f-gI August 7,1985
' Carolina Pow:r and Light Company 6D, GOO
/ ATTN: Mr. E. E. Utley, Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
PLANT HARRIS INITIAL LICENSING EXAMINATIONS As a followup to the meeting conducted at the Region II Offices on July 23, 1985, this letter transmits the Meeting Summary as recorded by our personnel.
The agenda items of this meeting addressed: (1) Construction Schedule and Fuel Load Date; (2) Training Schedule for Licensed Operator Candidates; (3) Status of Reference Material for Examination Preparation; (4) Scope of Examination; and (5)
Contingency Plans for Examination Implementation.
Details of the subjects discussed are enclosed in the Meeting Summary.
It is our opinion that this meeting was very beneficial and that the examination process for the initial cadre of licensed operators at the Harris Plant will be much improved due to the information shared.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosure will be placed in the NRC's Public Document Room.
Should you have any questions regarding this matter, we will be pleased to discuss them.
Sincerely.
(Original Signed by DMVerrelli)
David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects
Enclosure:
Meeting Summary cc w/ encl:
4. A. Watson, Vice President Harris Nuclear Project vil. M. Parsons, Project General Manager bec w/encli Document Control Desk diRC Resident inspector gD130:30050007 State of North Carolina v
^DUW 05000400
- 8. A. Wilson, Ril PDIf K. E. Brockman, RIl yhjh4" f d R11 R!l R!l Ril ej 4y
$1y
/
KBrockmanill BAWilson CAJuitan PFr'edrickson 08/ /85 08/ /85 08/S/85 08/1/85 I
Zlil/.G
1 August 7, 1985 Carolina Power and Light Company ATTN: Mr. E. E. Utley, Executive Vice President, Power Supply and Engineering and Construction P. O. Box 1551 j
Raleigh, NC 27002 Gentlemen:
SUBJECT:
PLANT HARRIS INITIAL LICENSING EXAMINATIONS As a followup to the meeting conducted at the Region II Offices on July 23, 1985, 1
this letter transmits the Meeting Summary as recorded by our personnel.
The agenda items of this meeting addressed: (1) Construction Schedule and Fuel Load Date; (2) Training Schedule for Licensed Operator Candidates; (3) Status of Reference Material for Examination Preparation; (4) Scope of Examination; and (5)
Contingency Plans for Examination Implementation.
Details of the subjects discussed are enclosed in the Meeting Sunenary.
It is our opinion that this meeting was very beneficial and that the examination process for the initial cadre of licensed operators at the Harris Plant will be much improved due to the information shared, i
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosure will be placed in the NRC's Public Document Room.
Should you have any questions regarding this matter, we will be pleased to discuss them.
Sincerely, (Original Signed by OftVerrolli)
David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects
Enclosure:
i Meeting Summary cc w/ encl R. A. Watson, Vice President Harris Nuclear Project R. M. Parsons, Project leneral Manager bec w/ encl i
Document Control Desk NRC Resident inspector State of North Carolina B. A. Wilson, Ri!