05000336/LER-1996-040, Forwards LER 96-040-00,documenting Event That Occurred at Mnps,Unit 2 on 961212.Commitment Made within Ltr,Listed

From kanterella
(Redirected from ML20133L741)
Jump to navigation Jump to search
Forwards LER 96-040-00,documenting Event That Occurred at Mnps,Unit 2 on 961212.Commitment Made within Ltr,Listed
ML20133L741
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/13/1997
From: Price J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133L744 List:
References
B16143, NUDOCS 9701220123
Download: ML20133L741 (2)


LER-1996-040, Forwards LER 96-040-00,documenting Event That Occurred at Mnps,Unit 2 on 961212.Commitment Made within Ltr,Listed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)
3361996040R00 - NRC Website

text

.. _ _ _ _

\\ Northeast

  • =e omee.. none rerry na., woie:ront ci-Utilities Syskm p.o. g,, na Waterrord. CT 0638.%0128 (203) 447 1791 i

I i

January 13,1997 j

Docket No. 50-336 B16143 Re: 10 CFR 50.73(a)(2)(i)

U.S. Nuclear Regulatory Commiss. ion Document Control Desk Washington, DC 20555

.i

}

This letter forwards Licensee Event Report (LER) 96-040-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on December 12,1996. This LER is i

j being submitted pursuant to 10 CFR 50.73(a)GFi).

The following are NNECO's commitments made within this letter. All other statements made within this letter are for information only.

B16143-01:

Technical Specification surveillance procedures will be reviewed to ensure cor,apliance with Technical Specification surveillance requirements as part of the Millstone Unit No. 2 Operations: Readiness Plan. The review will initial!y focus on Technical Specification surveillance procedures required for Mode 6 and defueled. Surveillance procedures required for subsequent mode changes will be reviewed prior to mode entry. (This commitment was previously sent to the NRC in the response to NOV 336/96-08-07, NNECC Commitment No B16076-2.)

g

'] "bhl Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 210106

?

W/~

J. A. Pdi' (

DirectV-Millstone Unit No. 2 cc: see Page 2 9701220123 970113 PDR ADOCK 05000336 S

PDR

{

U. S. Nuclsar Regulatory Commission l

i B16143/Page 2 4

a Attachment: LER 96-040-00 l