Forwards LER 96-040-00,documenting Event That Occurred at Mnps,Unit 2 on 961212.Commitment Made within Ltr,Listed
Date released: 05/26/2020 Download: ML20133L744


:on 961212,inadequate Surveillance Procedure for Verifying Motor Circuit Breaker Position Identified. Caused by Failure to Properly Incorporate TS Requirements. Surveillance Procedures Revised