ML20133K275
| ML20133K275 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/16/1985 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Williams J TOLEDO EDISON CO. |
| Shared Package | |
| ML20133K277 | List: |
| References | |
| NUDOCS 8510210152 | |
| Download: ML20133K275 (2) | |
See also: IR 05000346/1985026
Text
I
DNd
.
,
S$ur$bb IN rUhlVIA 10N
OCT i 6 i985
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. Joe Williams, Jr.
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the routine safeguards inspection conducted by Messrs. B. Drouin,
T. J. Madeda, and Ms. G. M. Christoffer of this office on September 9-12, 1985,
of activities at Davis-Besse Nuclear Power Station authorized by NRC Operating
License No. NPF-3 and to the discussion of our findings with Messrs. G. Grime
and L. Storz at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
Areas examined during this inspection concern a subject matter which
is exempt from disclosure according to Section 73.21(c)(2) of the NRC's
" Rules of Practice," Part 73, Title 10, Code of Federal Regulations.
This
information must be handled and protected in accordance with the provisions
of 10 CFR 73.21.
Consequently, the enclosure to this letter, our report of
this inspection, and your response to the noncompliance identified in the
enclosure to this letter will not be placed in the Public Document Room.
Therefore, your statement of corrective action regarding the noncompliance
identified in the enclosure should be submitted as a separate enclosure to
your transmittal letter in the manner prescribed.
The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
p Ck
9)\\
0
0510210152 051016
POR
ADOCK 05000346
l
G
s;elo:sure contair,s
$;5E.GERDS INFOP.MATION
Upon separation this
o,c-~...-m,
pego is Decontrolled
mrnn,,._,r.
"
"Ul tn UO a n o v . ..... . i io n
F
'
.
,
biti L Q u nt\\.J Q ll51 U nih'O ' ^%
cirnm 9 W
4
,,,cn,,.n ,n
- I
Toledo Edison Company
2
OCT 161985
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
W. L. Axelson, Chief
Nuclear Materials Safety
and Safeguards Branch
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No. 50-346/85026(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
cc w/ enclosures:
L. Storz, Plant Manager
IE File
IE/DI/0RPB
IE/ES
NMSS/SGPL
NRR/DL/SSPB
cc w/ enclosures, w/o
UNCLASSIFIED SAFEGUARDS
IhFORMATION:
OCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
James W. Harris, Statt of Ohio
Robert H. Quillin, Ohio
Department of Health
E closure contains
SAFEGUARDS INFORMATIS
RIII
RIII
RIII
RIII
RIII
RIII L'p n separation this
page is Decontrolled
Drohin/kja
M eda
Christoffer
d
Jac w
'
elson
10/11/85
- 8
p,. ,--.. 7 ,...-_--,..-,
-
u isa uU/Ti\\Ud liii Unglygtii1
-