U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-346/85026(DRSS)
Docket No. 50-346
License No. NPF-3
Safeguards Group IV
Licensee: Toledo Edison Company
Edison Plaza
300 Madison Avenue
Toledo, Ohio 43652
Facility Name:
Davis-Besse Nuclear Power Station, Unit 1
Inspection At:
Davis-Besse Site, Oak Harbor, Ohio
Inspection Conducted:
September 9-12, 1985
Date of Last Physical Security Inspection:
April 29 to May 2, 1985
Inspector:
kn,4A
/d//f/f5
,,
T. J.'Madeda
Date '
Phy
ai Se rity Inspector
l.
a
/>
/b
6 E3 ^
~G. M. Christoffer // 4
Date
Phy
'ty Inspector
-C<n '
/0ll/h X
'
B. Draliin /
Date
Physical S6curity Inspector
Approved By: @
/o//*
5'
.. R. Creed, Chief
Date
afeguards Section
Inspection Summary
Inspection on September 9-12, 1985 (Report No. 50-346/85026(DRSS))
Areas Inspected:
Included a Review of Management Effectiveness; Security Plan
Implementing Procedures; Security Organization; Records and Reports; Testing
and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protected
and Vital Area; Lighting; Compensatory Measures; Assessment Aids; Access
Control - Personnel; Detection Aids - Protected and Vital Areas; Alarm Stations;
Communications; Personnel Training and Qualifications and Safeguards Information.
The inspectors reviewed the_ licensee's actions / performance relating to several
weaknesses / concerns in the'above areas which were identified as a result of
Region III analysis of previous inspection findings, 10 CFR 73.71 Security
- . closure contains
SAFEGUARDS INFORMATION
8510210153 851016
Upon separation this
ADOCK 050
6
p,ge is Decontr9lled
G
r
__.____.______._______._____,_____.___.m.
.
.
.
.
.
.
J
. . .
.
Event Reports, and the previous SALP report.
The safety / security issues
addressed in NUREG-1154 (Loss of Main and Auxiliary Feedwater Event at the
Davis-Besse Plant on June 9, 1985) and other concerns which' surfaced through
interviews with licensee personnel were investigated.
The inspection involved
'
84 inspector-hours onsite by three NRC inspectors. The inspection began
during the dayshift; six inspector-hours were expended during off-shift
periods.
Results: The licensee was found to be in compliance with NRC requirements
within the areas examined during this inspection except as noted below:
Detection Aids - Protected Area:
Intrusion Detection System coverage in
some areas was not adequate (Details - UNCLASSIFIED SAFEGUARDS INFORMATION).