Safeguards Insp Rept 50-346/85-26 on 850909-12.Noncompliance Noted:Intrusion Detection Sys Coverage in Some Areas Inadequate.Details Withheld (Ref 10CFR73.21)
ML20133K279
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/16/1985
From: Christoffer G, Creed J, Drouin B, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20133K277 List:
References
50-346-85-26, 50-346-85026, NUDOCS 8510210153
Download: ML20133K279 (2)


See also: IR 05000346/1985026

Text

_

.- . . .

o

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-346/85026(DRSS)

Docket No. 50-346 License No. NPF-3 Safeguards Group IV

Licensee: Toledo Edison Company

Edison Plaza

300 Madison Avenue

Toledo, Ohio 43652

Facility Name: Davis-Besse Nuclear Power Station, Unit 1

Inspection At: Davis-Besse Site, Oak Harbor, Ohio

Inspection Conducted: September 9-12, 1985

Date of Last Physical Security Inspection: April 29 to May 2, 1985

Inspector: ,, kn,4A /d//f/f5

T. J.'Madeda Date '

Phy ai Se rity Inspector

l. a /> /b 6 E3 ^

~G. M. Christoffer // 4 Date

Phy 'ty Inspector

'

-C<n ' /0ll/h X

B. Draliin / Date

Physical S6curity Inspector

Approved By: @ /o//* 5'

.. R. Creed, Chief Date

afeguards Section

Inspection Summary

Inspection on September 9-12, 1985 (Report No. 50-346/85026(DRSS))

Areas Inspected: Included a Review of Management Effectiveness; Security Plan

Implementing Procedures; Security Organization; Records and Reports; Testing

and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protected

and Vital Area; Lighting; Compensatory Measures; Assessment Aids; Access

Control - Personnel; Detection Aids - Protected and Vital Areas; Alarm Stations;

Communications; Personnel Training and Qualifications and Safeguards Information.

The inspectors reviewed the_ licensee's actions / performance relating to several

weaknesses / concerns in the'above areas which were identified as a result of

Region III analysis of previous inspection findings, 10 CFR 73.71 Security

  1. . closure contains

SAFEGUARDS INFORMATION

8510210153 851016 6 Upon separation this

PDR ADOCK 050 p,ge is Decontr9lled

G

. . . .

Event Reports, and the previous SALP report. The safety / security issues

addressed in NUREG-1154 (Loss of Main and Auxiliary Feedwater Event at the

Davis-Besse Plant on June 9, 1985) and other concerns which' surfaced through

'

interviews with licensee personnel were investigated. The inspection involved

84 inspector-hours onsite by three NRC inspectors. The inspection began

during the dayshift; six inspector-hours were expended during off-shift

periods.

Results: The licensee was found to be in compliance with NRC requirements

within the areas examined during this inspection except as noted below:

Detection Aids - Protected Area: Intrusion Detection System coverage in

some areas was not adequate (Details - UNCLASSIFIED SAFEGUARDS INFORMATION).