ML20133J915

From kanterella
Jump to navigation Jump to search
National Institute of Standards and Technology - Approval of Exemption from Select Requirements of 10 CFR Part 55, Operators Licenses
ML20133J915
Person / Time
Site: National Bureau of Standards Reactor
Issue date: 05/18/2020
From: John Monninger
NRC/NRR/DANU
To: Dimeo R
US Dept of Commerce, National Institute of Standards & Technology (NIST)
Schuster W, NRR/DANU/UNPO, 301-415-1590
Shared Package
ML20136A430 List:
References
Download: ML20133J915 (5)


Text

May 18, 2020 Dr. Robert Dimeo, Director National Institute of Standards and Technology NIST Center for Neutron Research U.S. Department of Commerce 100 Bureau Drive, Mail Stop 8561 Gaithersburg, MD 20899-8561

SUBJECT:

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY - APPROVAL OF EXEMPTION FROM SELECT REQUIREMENTS OF 10 CFR PART 55, OPERATORS LICENSES

Dear Dr. Dimeo:

The U.S. Nuclear Regulatory Commission (NRC) has approved the requested exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, Operators Licenses, for licensed operators at the National Bureau of Standards Test Reactor. This action is in response to the National Institute of Standards and Technology (facility licensee) application dated May 11, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20136A442), related to an NRC letter dated April 14, 2020 (ADAMS Accession No. ML20104C071), describing a process to request expedited review of certain exemptions from 10 CFR Part 55 during the Coronavirus Disease 2019 (COVID-19) public health emergency (PHE).

Specifically, the application requested exemption from medical examination requirements in 10 CFR 55.21 and 10 CFR 55.53(i) and provided the following information:

  • The names and docket numbers of the licensed operators for whom the exemption is being requested.
  • A description of the interim compensatory measures that the facility licensee is using to address delay in receipt of recommendations from a licensed physician concerning the licensed operators health.

Consistent with 10 CFR 55.11, Specific exemptions, the NRC may, upon application by an interested person, or upon its own initiative, grant such exemptions from the requirements of the regulations in 10 CFR Part 55 as it determines are authorized by law and will not endanger life or property and are otherwise in the public interest.

10 CFR 55.21 and 10 CFR 55.53(i) require a medical examination of each licensed operator every two years by a licensed physician who uses the applicable American National Standards Institute/American Nuclear Society (ANSI/ANS) standard. Based on this examination, the physician certifies whether the licensed operator has been found to meet the medical requirements of 10 CFR 55.33(a)(1) and whether the licensed operators license should be conditioned based on an identified health problem. Consistent with 10 CFR 55.25,

R. Dimeo Incapacitation because of disability or illness, the facility licensee must notify the NRC if it learns that the licensed operator has developed a permanent condition that causes the licensed operator to fail to meet the health requirements. If the facility licensee alerts the NRC to a health concern, then the NRC uses a qualified medical expert to review the relevant medical information. Neither the facility licensee nor the NRC makes medical judgements of licensed operators.

A PHE requiring the use of social distancing and other practices intended to slow the spread of illness and the potential long-term unavailability of routine medical appointments due to a PHE were not considered during the rulemaking that established the medical examination requirements.

During the COVID-19 PHE, licensed operators might not be able to receive the required biennial medical examination from a licensed physician. The compensatory measure that the facility licensee (in coordination with the licensed operator) will implement during the exemption term will provide the results of a partial examination to the facility licensee, which will consider the recommendations as to whether the ANSI/ANS-15.4-2007 standard appears to be met based on available information. Consistent with 10 CFR 55.25, the facility licensee must continue to notify the NRC of permanent conditions that cause licensed operators to fail to meet the health requirements. Based on the proposed compensatory measure and the continued compliance with the regulatory requirements in 10 CFR 55.25, the NRC staff finds that the requested exemption will not endanger life or property.

The requested exemption from the biennial medical examination requirements addresses the fact that a licensed operator may not be able to obtain this examination during the COVID-19 PHE because of a limited availability of medical resources and the possibility that an in-office medical examination may expose the operator to COVID-19. The requested exemption ensures that licensed operators are not required to take actions that would conflict with practices recommended by the Centers for Disease Control and Prevention (CDC) to limit the spread of COVID-19.1 Therefore, the NRC staff finds that granting the requested exemption is in the public interest.

The NRC staff determined that exemption from the medical examination requirements is permissible under the Atomic Energy Act of 1954, as amended, and other regulatory requirements. Therefore, the NRC staff finds that the requested exemption is authorized by law.

Granting the requested exemption is categorically excluded under 10 CFR 51.22(c)(25) and there are no special or extraordinary circumstances present that would preclude reliance on this exclusion. The NRC staff determined, per 10 CFR 51.22(c)(25)(vi)(E), that the requirements from which the exemption is sought involve education, training, experience, qualification, requalification, or other employment suitability requirements. The NRC staff also determined that approval of the requested exemption involves no significant hazards consideration because it does not authorize any physical changes to the facility or any of its safety systems, nor does it change any of the assumptions or limits used in the facility licensees safety analyses or introduce any new failure modes; no significant change in the types or significant increase in the amounts of any effluents that may be released offsite because the exemption does not affect any effluent release limits as provided in the facility licensees technical specifications or by the regulations in 10 CFR Part 20, Standards for Protection Against Radiation; no significant increase in individual or cumulative public or occupational radiation exposure because the 1

CDC, How to Protect Yourself and Others, April 18, 2020 (ADAMS Accession No. ML20125A069).

R. Dimeo exemption does not affect limits on the release of any radioactive material or the limits provided in 10 CFR Part 20 for radiation exposure to workers or members of the public; no significant construction impact because the exemption does not involve any changes to a construction permit; and no significant increase in the potential for or consequences from radiological accidents because the exemption does not alter any of the assumptions or limits in the facility licensees safety analyses. In addition, the NRC staff determined that there would be no significant impacts to biota, water resources, historic properties, cultural resources, or socioeconomic conditions in the region. As such, there are no extraordinary circumstances present that would preclude reliance on this categorical exclusion. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the approval of the requested exemption.

Based on the above, the NRC staff finds that (1) the exemption is authorized by law, (2) the exemption will not endanger life or property, and (3) the exemption is otherwise in the public interest.

The exemption is effective upon issuance until 90 days after the COVID-19 PHE is ended or until December 31, 2020, whichever occurs first.

Sincerely,

/RA Brian W. Smith for/

John D. Monninger, Director Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-184 cc: See next page

National Institute of Standards and Technology Docket No. 50-184 cc:

Environmental Program Manager III Radiological Health Program Air & Radiation Management Adm.

Maryland Dept. of the Environment 1800 Washington Blvd., Suite 750 Baltimore, MD 21230-1724 Director, Department of State Planning 301 West Preston Street Baltimore, MD 21201 Director, Air & Radiation Management Adm.

Maryland Dept. of the Environment 1800 Washington Blvd., Suite 710 Baltimore, MD 21230 Director, Department of Natural Resources Power Plant Siting Program Energy and Coastal Zone Administration Tawes State Office Building Annapolis, MD 21401 President Montgomery County Council 100 Maryland Avenue Rockville, MD 20850 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept. of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115 Dr. Thomas H. Newton, Deputy Director National Institute of Standards and Technology NIST Center for Neutron Research U.S. Department of Commerce 100 Bureau Drive, Mail Stop 6101 Gaithersburg, MD 20899-6101

ML20136A430 (Package) *via e-mail NRR-048 OFFICE NRR/DANU/UNPO/CE* NRR/DANU/UNPL/PM* NRR/DANU/UNPL/LA* NRR/DANU/UNPL/BC*

NAME WSchuster XYin NParker GCasto DATE 05/11/2020 05/11/2020 05/11/2020 05/11/2020 OFFICE NRR/DANU/UNPO/BC* OGC/NLO* NRR/DANU*

NAME TTate JWachutka JMonninger (BSmith for)

DATE 05/11/2020 05/15/2020 05/18 /2020