ML20133J043

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Sept 1985 & Rev to Monthly Operating Rept for Aug 1985.Rev Necessary Due to Mathematical Error in Plant Log
ML20133J043
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/09/1985
From: Morgan R
CAROLINA POWER & LIGHT CO.
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20133J047 List:
References
RNPD-85-3472, NUDOCS 8510180239
Download: ML20133J043 (1)


Text

?: .

Cp&L Carolina Power & Light Company POBINSCN NUCLFAR pin 7ECT DEPARIMENT POST OFFICE BOX 790 HARTSVIILE, SOlmi CAROLINA 29550 OCT 9 1985 Robinson File : 15505 Serial: ENPD/85-3472 Mr. James M. Taylor, Director Office of Inspection & Enforc ment U. S. Nuclear Regulatory Camtission Washington, D. C. 20555 IOBINSCN NUCLEAR PInTECT DEPARIMENT UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 ITN111LY OPERATICNS REPORT

Dear Mr. Taylor:

In accordance with Technical Specifications 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Cmpany herewith subnits the report of operation statistics and shutdown experience for the nonth of Septmber, 1985.

In addition to the subject report, please find a revision to the nonthly operating report for August, 1985. 'Ihis revision was necessary due to an mathematic error in our plant log. 'Ihis revision is denoted by a bar in the right-hand margin.

Should you have any questions, please contact our office at (803)383-4524 extension 2363.

Very truly yours, R. E.

General ger H. B. Robinson S. E. Plant ACS/aes.

Enclosures cc: J. N. Grace (1)

R. A. Hartfield (2) p 8510180239 851009 k

\

PDR ADOCK 05000261 R PDR

_ _ _ . _ _ _ _ _ _ _ _ _ _