Forwards Special Safety Insp Rept 50-289/85-19 on 850531-0628 & Notice of Violation
ML20133H130
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/18/1985
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20133H133 List:
References
CON-#385-943 SP, NUDOCS 8508090202
Download: ML20133H130 (3)


See also: IR 05000289/1985019

Text

- -

-

-

. _ _ -

-

--

-

_

4

7

JUL 18 1985

Decket/ License No. 50-289/DPR-50

GPU Nuclear Corporation

ATTN: Mr. H. D. Hukill

Director, TMI-1

P.O. Box 480

Middletown, Pennsylvania 17057

Gentlemen:

Subject:

Inspection 50-289/85-19

By Memorandum and Order CLI-85-09, dated May 29, 1985, the Commission issued a

decision that lifted the effectiveness of previous orders issued in 1979 that

directed TMI-1 to remain shut down. To manage and coordinate the Region I

inspection ef forts for the restart of TMI-1, a separate organization was

established. This organization, the NRC THI-1 Restart Staff, was established

to provide increased direct inspection and monitoring and increased senior

management involvement during this period.

Between May 31 and June 28, 1985, members of the NRC TMI-1 Restart Staff

conducted a special safety inspection of activities at your facility.

The

results of that initial inspection are documented in the attached Inspection

Report. At the conclusion of the inspection, Mr. R. Conte of my staff sum-

marized the inspection findings for you and members of your staff. These

findings were generally favorable.

,

,

As a result of the inspection, however, one of our inspectors identified a

plant condition in which you were not in full compliance with your license.

The attached Appendix A, Notice of Violation, describes operator actions which,

in part, were not in accordance with your established procedure for maintaining

the correct valve lineup in a reactor coolant pump seal leakoff line.

In

addition, control room operators failed to recognize the recorder indication

of abnormally low seal leakoff flow for more than eight hours.

Failure to

identify and correct the condition prior to restart could have led to failure

of the seal with consequent challenges to both the operators and safety systems.

No response is required to the Notice of Violation because you acknowledged

this noncompliance, took immediate corrective action to be in compliance with

your procedure, and completed adequate measures to prevent recurrence as

verified by our inspector. We do not view this incident as indicative of a

programmatic problem.

i

0FFICIAL RECORD COPY

NRCRI TMI1PC 0018 - 0001.0.0

11/29/80

8508090202 850718

/

PDR

ADOCK 05000289

%-O/

I,

G

PDR

F

-.

. -

.

-

.

. -

. -

~ . .

.

- -

. ~ . - -

-

. -

_-_ _ _

--

'

.

4

GPU Nuclear Corporation

2

JUL 18 1985

This letter also responds to your letter dated June 8,1985, which described

your plans to implement License Condition (LC) 2.c.8(2) regarding shutdown of

the facility when primary to secondary OTSG 1eakage exceeds baseline by 0.1 gpm

(6 gph). Your plans were reviewed in detail as described in paragraph 5.2 of

the attached inspection report and, as noted in the report, the license condi-

tion as it stands is enforceable. We do concur, however, with your plan which

calls for further investigation and confirmation of primary to secondary leak

rate indication in excess of the LC limit to avoid undesirable thermal cycles

that may result from unnecessary shutdown of the facility. During our review

of your implementing procedure for primary to secondary leak rate monitoring,

we noted that your planned actions for the determination of actual leakage

lacked specificity.

However, we understand that your planned actions in the

implementing procedure will be re-reviewed as a result of knowledge and

experience gained through the power escalation test program, and we will

review this area again at that time.

Your cooperation with us in this matter is appreciated.

Sincerely,

O LMfWl Y 0

William F. Kane, Director

TMI-1 Restart Staff

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report Number 50-289/85-19

cc w/encis:

R. J. Toole, Operations and Maintenance Director, TMI-1

C. W. Smyth, TMI-1 Licensing Manager

R. J. McGoey, Manager, PWR Licensing

G. F. Trowbridge, Esquire

TMI-1 Hearing Service List

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector (2 copies)

Commonwealth of Pennsylvania

0FFICIAL RECORD COPY

NRCRI TMI1PC 0018 - 0002.0.0

11/29/80

&

4

GPU Nuclear Corporation

3

JUL 18 1985

bcc w/encls:

Region I Docket Room (concurrence copy)

Management Assistant, RI (w/o encis)

H. Thompson, NRR

W. Travers, lvRR

J. Taylor, IE

J. Partiow, IE

J. Thoma, PM, NRR

T. Murley, RI

J. Allan, RI

K. Abraham, RI

R. Starostecki, RI

T. Martin, RI

S. Ebneter, RI

H. Kister, RI

L. Bettenhausen, RI

N. Blumberg, RI

P. Wen, RI

J. Durr, RI

E. Gray, RI

M. Schaeffer, RI

R. Conte, RI

D. Haverkamp, RI

R. Urban, RI

F. Young, RI

R. Walker, RII

H. Dance, RII

R. Bryant, RII

T. Peebles, RII

C. Norelius, RIII

N. Jackiw, RIII

B. Burgess, RIII

i

h{h

b th'

I

/

DFMverkamp

/mRCo'nte

Wggne

y"7//7/85

7/II/85

TMI-1 RS

TMI-1 RS

TMI-1 RS

7/t1/85

0FFICIAL RECORD COPY

NRCRI TMI1PC 0018 - 0003.0.0

11/29/80

l

L