ML20133G735
| ML20133G735 | |
| Person / Time | |
|---|---|
| Issue date: | 10/01/1985 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Schlemmer D GOVERNMENT ACCOUNTABILITY PROJECT |
| Shared Package | |
| ML20133G739 | List: |
| References | |
| FOIA-84-559, PROJECT-512A NUDOCS 8510160103 | |
| Download: ML20133G735 (2) | |
Text
-.
h
/
%g, UNITED STATES NUCLEAR REGULATORY COMMISSION v
g W ASHINGTON, D. C. 20555
\\
O{
E g
\\..... ' '/
i s
00T 011985 1
Mr. Donald L. Schlemmer Government Accountability Project' IN RESPONSE REFER 1555 Connecticut Avenue, NW, Suite 202 TO F01A-84-559 Washington, DC 20036
Dear Mr. Schlemmer:
This is in further response to your letter dated July 5,1984, in which you requested, pursuant to the Freedom of Information Act (F0IA), four categories of documents concerning the Philippine nuclear power plant.
The enclosed Appendix D identifies additional documents which are being made available for your inspection and copying at the NRC Public Document Room (PDR),
1717 H Street, NW, Washington, DC 20555. The documents will be filed in PDR folder F01A-84-559 under your name.
This completes NRC's action on your request.
Sincerely, J. M. Felton, Director Division of Rules and Records Office of Administration
Enclosure:
As stated f
l l
SCHLEMM 84-559 PDR i
l
e-J Q
9
+
Re:
l i
APPEADIX D i
y 1.'
12/29/76 Letter to Geo'rge F. Murphy, Jr. from Michael A. Guhin
/e: Notice of Application for Federal Register.
(1 page) l 2.
12/20/76 Letter to C. Arthur Borg from Lee V. Gossick re: Application from Westinghouse Electric Corp.
(1 page) 3.
12/09/76 Memo for Michael A. Guhin from W. M. Morrison re: Application for Export of One Westinghouse Nuclear Steam Supply System to the Philippines.
(1 page) 4.
12/07/76 Memo for W. M. Morrison from Michael A. Guhin re: Determination of Utilization Facility.
(1 page) 5.
11/18/76 Letter to Neal Moore from James P. Rodi re: Export License -
Nuclear Steam Supply System.
(5 pages) 6.
10/28/77 Letter to Librado D. Ibe from Joseph D. Lafleur, Jr., re: IAEA Fellowship Programs.
(1page) j 7.
07/02/76 Letter to Antonio M. Portugal from Joseph D. Lafleur, Jr., re:
Code of Federal Regulations.
(2 pages) 8.
03/08/77 Memo for F. J. Miraglia from Richard M. Vollmer re: AAB Coments on Preliminary Site Investigation Review of the Philippine Nuclear Power Plant Unit No. 1.
(4 pages) 9.
03/15/77 Memo for F. J. Miraglia from W. P. Gamill re: Philippine Preliminary Site Investigation Report.
(8 pages)
- 10. 03/16/77 Memo for Joseph D. Lafleur from Harold R. Denten re: Philippine Preliminary Site Investigation Report.
(13 pages)
- 11. 03/29/77 Memo for F. J. Miraglia from W. P. Gamill re: Philippine Preliminary Site Investigation Report.
(1 page)
- 12. 02/16/77 Memo for R. H. Vollmer and W. P. Gamill from H. R. Denton re:
Philippine Preliminary Site Investigation Report.
(13 pages) i 13.
11/04/77 Letter to Librado D. Ibe from Joseph D. Lafleur, Jr., re:
Technical Information.
(1 page) l l
- - -., _ _