ML20133G615
| ML20133G615 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/13/1985 |
| From: | Jabbour K Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8508090002 | |
| Download: ML20133G615 (3) | |
Text
'
((pa MCy ig UNITED STATES g
NUCLEAR REGULATORY COMMISSION E
WA ING TON, D. C. 20555 r,
(,j N 1 3 1985 Docket No:
50-414 APPLICANT: Duke Power Company FACILITY:
Catawba Nuclear Station, Unit 2
SUBJECT:
SUMMARY
OF MAY 14 AND 15, 1985, "EETING AND SITE VISIT TO AUDIT CATAWBA UNIT 2 SAFETY PARAMETER DISPLAY SYSTEM (SPDS)
General On May 14 and 15, 1985, the NRC staff and its consultants met with Duke Power Company (DPC) representatives and visited the McGuire/ Catawba simulator,.the Catawba control room and the technic.al support center (TSC) for Units 1 and 2.
A list of attendees is included in Enclosure 1.
Discussion The meeting on May 14 and the site visit on May 15 followed the enclosed agenda (Enclosure 2). The viewgraphs of the presentations made by DPC representatives on May 14 are included as Enclosure 3.
The staff's questions centered on the Verification and Validation'(V&V) program review, data validation, critical safety functions, containment isolation, and radiation monitoring.
In the morning of May 15, 1985, the staff visited the McGuire/ Catawba simulator.
The staff witnessed a safety injection demonstration on high containment pressure due to a main steam line break. The event sequence is outlined in Enclosure 4.
In*the 3fternoon, the staff visited the Catawba control room and TSC. The view-graphs of DPC's presentations are included as Enclosure 5.
The staff's questions centered on the human factors engineering aspects. DPC representatives stated that the Catawba simulator delivery date is 1987 and operability date is 1988.
TheshiftTechnicalAdvisor(STA)isresponsibleformonitoringtheSPDS.
Conclusion The NRC representatives made the following statements at the conclusion of I
the visit.
1.
DPC's V&V program appears to fulfill the intent of the SRP although the review is not performed by an independent consultant.
2.
DPC's data validation program is adequate as an interim program.
DPC committed to further improvements.
3.
The human factors engineering aspects' review will be documented in the staff's audit report.
8508090002 850613 l
hDR ADOCK 05000414 PDR I
L
,i.^
. 4.
The staff noted an inconsistency between the SPDS status tree and the emergency operating procedures.
5.' The staff noted that the containment isolation and radiation monitor-ing have to be reviewed by the NRC's Procedures and Systems Review Branch. The staff's target date for issuing the audit report is July 15, 1985, and for the SER is September 30, 1985.
[
Kahtan N. Jabbour, Project Manager Licensing Branch No. 4 Division of Licensing
Enclosures:
As stated cc: See next page D
IC1..t 3 OI:IGIDL I
.d, Certified By i
l
F-
. }-
~
.<f MEETING
SUMMARY
DISTRIBUTION DocketNo(s): 50-414 NRC PDR Local PDR
.NSIC PRC System LB #4 r/f Attorney, OELD E. Adensam Project Manager K. Jabbour Licensing Assistant M. Duncan i
NRC PARTICIPANTS G. Lapinsky i
K. Jabbour i
i l
t i
i i
bec: Applicant & Service List I
h e
n..
--. ~.,
- - -, -.. _.