OCT 02 gggy
N
/DukePowerCompany
J ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NO. 50-414/85-35
On August 26-30 and September 9-13, 1985, NRC inspected activities authorized by
NRC Construction Permit No. CPPR-117 for your Catawba facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in_the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Y.
Mit*fL
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-414/85-35
/cc w/ encl:
JJ1. L. Dick, Vice President - Construction
/J. W. Hampton, Station Manager
cc w/ encl:
. Johnson, ELD
. N. Jabbour, NRR
Document Control Desk
State of South Carolina
Y
8
/ "f P
RII
RII
RI
f
. JThomas:bhg
FJape
A rdt
V9/Jo/85
99])/85
9/h/85
8510070477 851002
ADOCK 05000414
11
-