Forwards LER 96-038.Commitments Made Re LER Submitted
ML20133C584
Person / Time
Site: Millstone 
Issue date: 12/31/1996
From: Price J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133C587 List:
References
B16119, NUDOCS 9701080002
Download: ML20133C584 (2)


LER-1996-038, Forwards LER 96-038.Commitments Made Re LER Submitted
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)
3361996038R00 - NRC Website

text

.

,,.'i Northeast men, omce.. a.e rerry u nierrora. cr m

gp Utilities System i,.o. is,, 3.,,8

%terrord. Ur 06385-0128 (203) 447-1791 I

i DEC 311996 Docket No. 50-336 B16119 Re: 10 CFR 50.73(a)(2)(i)

)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 1

This letter forwards Licensee Event Report (LER) 96-038-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on December 2,1996. This LER is 1

being submitted pursuant to 10 CFR 50.73(a)(2)(i).

The following are NNECO's commitments made within this letter. All other statements made within this letter are for information only.

B16119-01:

Technical Specification surveillance procedures will be reviewed to ensure compliance with Technical Specification surveillance requirements as part of the Millstone Unit No. 2 Operational Readiness Plan. The review will initially focus on Technical Specification surveillance procedures required for Mode 6 and defueled. Surveillance procedures required for subsequent mode changes will be reviewed prior to mode entry. (This commitment was previously sent to the NRC in the response to NOV 336/96 07, NNECO Commitment No. B16076-2.)

\\

\\

Very truly yours, gf s%

NORTHEAST NUCLEAR ENERGY COMPANY 070054

/

9701000002 961231 l"

PDR ADOCK 05000336 J.A.9rfe s

PDR DirectM - Millstone Unit No. 2 cc: see page 2 OH3422 9 REV l 95

~....

...~.-...-- -- -

i l

,U. S. Nuciscr Rsgulatory Commission B16119/Pags 2

}

)

1 Attachment: LER 96-038-00 4