Insp Rept 50-458/85-43 on 850501-0615.Violation Noted: Failure to Obtain NRC Approval of QA Program ChangeML20133B909 |
Person / Time |
---|
Site: |
River Bend |
---|
Issue date: |
08/01/1985 |
---|
From: |
Boardman J, Chamberlain D, Jaudon J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
---|
To: |
|
---|
Shared Package |
---|
ML20133B883 |
List: |
---|
References |
---|
50-458-85-43, IEB-77-06, IEB-77-6, IEB-79-15, IEB-79-23, IEB-79-27, IEB-80-08, IEB-80-16, IEB-80-8, IEB-84-03, IEB-84-3, NUDOCS 8508060287 |
Download: ML20133B909 (13) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000458/19900311990-11-19019 November 1990 Insp Rept 50-458/90-31 on 901105-09.No Violations or Deviations Noted.Major Areas Inspected:Verification of Isolation Component Exemptions IR 05000458/19900251990-11-0707 November 1990 Insp Rept 50-458/90-25 on 900924-28 & 1015-19.Noncited Violation Identified.Major Areas Inspected:Quality Verification Function Including Condition Rept Program, Internal Audit Program ML20058A5461990-10-17017 October 1990 Insp Rept 50-458/90-23 on 900910-14.No Violations or Deviations Noted.Major Areas Inspected:Engineering Evaluation in Response to NRC Bulletin 88-004,action of Previously Identified Items & Review of Root Cause Analysis IR 05000458/19900281990-10-17017 October 1990 Insp Rept 50-458/90-28 on 901009-12.No Violations or Deviations Noted.Major Areas Inspected:Installation & Testing of Mods & Installation of Heat Shrinkable Insulation Tubing IR 05000458/19900221990-09-27027 September 1990 Insp Rept 50-458/90-22 on 900827-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Liquid & Gaseous Radwaste Mgt Program ML20059D6471990-08-28028 August 1990 Insp Rept 50-458/90-15 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Followup to Previous Insp Findings & Equipment IR 05000458/19900201990-08-21021 August 1990 Insp Rept 50-458/90-20 on 900723-26.No Violations or Deviations Noted.Major Areas Inspected:Training & Qualification Effectiveness IR 05000458/19902001990-07-26026 July 1990 Electrical Distribution Sys Functional Insp Rept 50-458/90-200 on 900521-0622.No Violations Noted.Major Areas Inspected:Design & Implementation of Plant Electrical Distribution Sys & Adequacy of Engineering Support IR 05000458/19900171990-07-19019 July 1990 Advises That Insp 50-458/90-17 Canceled,Therefore,No Insp Rept Will Be Issued IR 05000458/19900141990-06-19019 June 1990 Insp Rept 50-458/90-14 on 900521-22.One self-identified Violation Noted.Major Areas Inspected:Licensee Occupational Radiation Protection Program Including High Radiation Area Controls IR 05000458/19890331989-09-21021 September 1989 Insp Rept 50-458/89-33 on 890801-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Test Observation,Ler Followup & Followup on 10CFR21 Repts IR 05000458/19890311989-08-29029 August 1989 Insp Rept 50-458/89-31 on 890701-31.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Test Observation,Esf Walkdown & Emergency Preparedness Drill IR 05000458/19890301989-08-17017 August 1989 Insp Rept 50-458/89-30 on 890619-23.Violations Noted.Major Areas Inspected:Physical Security Program IR 05000458/19890191989-08-10010 August 1989 Advises That Insp 50-458/89-19 Cancelled & No Insp Rept Will Be Issued for Rept Number IR 05000458/19890321989-07-31031 July 1989 Insp Rept 50-458/89-32 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Testing Program & Plant Instrumentation Calibr Program.Lists of Surveillance Test Performance & Loop Calibr Repts Encl IR 05000458/19890281989-07-27027 July 1989 Insp Rept 50-458/89-28 on 890601-30.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation & Licensee Action on Previous Insp Findings IR 05000458/19890251989-07-27027 July 1989 Insp Rept 50-458/89-25 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing. Conservative Error in Util Procedure for Manual Calculations of Core Thermal Power Identified IR 05000458/19890291989-07-14014 July 1989 Insp Rept 50-458/89-29 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Corrective Actions IR 05000458/19890271989-07-12012 July 1989 Insp Rept 50-458/89-27 on 890605-09 & 19-23.Violations Noted.Major Areas Inspected:Self Assessment Capabilities IR 05000458/19890241989-06-26026 June 1989 Insp Rept 50-458/89-24 on 890501-31.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification & Maint & Surveillance Test Observation IR 05000458/19890221989-06-20020 June 1989 Insp Rept 50-458/89-22 on 890525-27.No Violations or Deviations Noted.Major Areas Inspected:Containment Integrated Leak Rate Test & Review of Results of Local Leak Rate Test IR 05000458/19890261989-06-14014 June 1989 Insp Rept 50-458/89-26 on 890515-19.No Violations Noted. Major Areas Inspected:Action on Previously Indentified Insp Findings,Inservice Insp Data Review & Corrective Actions IR 05000458/19890011989-06-0707 June 1989 Insp Rept 50-458/89-01 on 890501-05.No Violations Noted. Major Areas Inspected:Facility Mods & Nonlicensed Staff Training ML20244C3561989-06-0505 June 1989 Insp Rept 50-458/89-18 on 890501-05 & 15-19.Violations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves,Welding Activities Associated W/Repairs to Svc Water Sys & Activities Re Instrument Air Sys Insp IR 05000458/19890231989-05-25025 May 1989 Insp Repts 50-458/89-23 on 890501-05.No Violations or Deviations Noted.Major Areas Inspected:Programs for Station Design Changes & Mods for Installation of Raychem Electrical Splices IR 05000458/19890111989-05-24024 May 1989 Insp Rept 50-458/89-11 on 890315-0430.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation,Refueling Activities & Licensee Action on Previous Findings IR 05000458/19890171989-05-16016 May 1989 Insp Rept 50-458/89-17 on 890409-19.Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Planning & Preparation for in-reactor Pressure Vessel Repair of Feed Water Spargers ML20244D4511989-05-15015 May 1989 Partially Withheld Insp Rept 50-458/89-15 on 890402-06 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support,Security Program Plans & Audits & Protected & Vital Area Access IR 05000458/19890131989-05-15015 May 1989 Advises That Insp Rept 50-458/89-13 Cancelled.No Rept Will Be Issued for Rept Number IR 05000458/19890211989-05-10010 May 1989 Insp Rept 50-458/89-21 on 890424-28.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Test Observation & Followup on Operating Events IR 05000458/19890101989-05-0909 May 1989 Insp Rept 50-458/89-10 on 890327-0406.No Violations or Deviations Noted.Major Areas Inspected:Review of Inservice Insp,Welding & Associated Documents & Procedures.Mod to RHR Sys Also Reviewed IR 05000458/19890141989-04-20020 April 1989 Insp Rept 50-458/89-14 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Testing of Pipe Supports & Restraint Sys ML20244B6001989-04-0606 April 1989 Insp Rept 50-458/89-12 on 890327-31.Violation Noted.Major Areas Inspected:Welding Activities.Welding Program Well Defined & Includes Monitoring by Qc.Weakness in Welder Qualification Program Noted IR 05000458/19890071989-04-0505 April 1989 Insp Rept 50-458/89-07 on 890201-0314.No Violations or Deviations Noted.Major Areas Inspected:Plant Events, Emergency Preparedness Exercise,Operational Safety Verification & Surveillance Test Observation IR 05000458/19890091989-03-30030 March 1989 Insp Rept 50-458/89-09 on 890301-03.No Violations or Deviations Noted.Major Areas Inspected:Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000458/19890081989-03-10010 March 1989 Insp Rept 50-458/89-08 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Calibr Program, Emergency Diesel Fuel Oil Program Into QA Program & Receipt, Storage & Handling of Diesel Generator Fuel Oil IR 05000458/19890061989-03-0808 March 1989 Insp Rept 50-458/89-06 on 890206-10.No Violations or Deviations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves IR 05000458/19890051989-02-24024 February 1989 Insp Rept 50-458/89-05 on 890101-31.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Radiological Protection,Security,Surveillance Test Observation & Maint Observation IR 05000458/19890031989-02-23023 February 1989 Informs That Insp 50-458/89-03 Cancelled.No Insp Rept Will Be Issued for Subj Rept Number IR 05000458/19880291989-01-31031 January 1989 Partially Withheld Insp Rept 50-458/88-29 on 881212-16 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program Included Mgt Support, Security Program Plans,Audits & Records & Repts IR 05000458/19880191988-10-14014 October 1988 Insp Rept 50-458/88-19 on 880801-0917.Violation Noted.Major Areas Inspected:Surveillance & Maint Observation,Safety Sys Walkdown,Operational Safety Verification,Radiological Protection Observation & Security ML20155G8291988-10-0303 October 1988 Insp Rept 50-458/88-21 on 880912-15.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program ML20155E2471988-09-27027 September 1988 Insp Rept 50-458/88-22 on 880829-0915.Violations Noted.Major Areas Inspected:Fuel Bldg Ventilation Charcoal Filtration Sys IR 05000458/19880201988-09-14014 September 1988 Insp Rept 50-458/88-20 on 880822-25.No Violations Noted. Details Withheld (Ref 10CFR73.21) ML20153E4051988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records IR 05000458/19880181988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records ML20151Z8021988-08-22022 August 1988 Partially Withheld Insp Rept 50-458/88-14 on 880613-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Lers, Allegations,Security Procedures,Mgt Effectivenss,Security Program Audits & Records & Repts IR 05000458/19880171988-08-12012 August 1988 Insp Rept 50-458/88-17 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on NRC Bulletin 88-005,surveillance Test & Maint Observation, Operational Safety Verification & Security IR 05000458/19880161988-07-27027 July 1988 Insp Rept 50-458/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Release Program & Allegations Re Training & Qualifications of Supervisory Personnel ML20151G0971988-07-15015 July 1988 Insp Rept 50-458/88-13 on 880501-0630.Violation Noted.Major Areas Inspected:Previous Insp Findings,Nrc Bulletins 88-001 & 88-007,NRC Info Notices,Surveillance Test Observation, Maint Observation & Safety Sys Walkdown 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support ML20212L9771999-10-0505 October 1999 Notice of Violation from Insp on 990710.Violation Noted:From 990224-0325,River Bend Station Operated in Mode I Without Three Operable EDGs IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20205A4131999-03-23023 March 1999 NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222- 0303.All 14 Applicants Passed Exams ML20203A5351999-01-27027 January 1999 EN-99-005:on 990201,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Two Severity Level III Violations Involving Design Deficiency,Caused Uncertainty as to Ability of Div I & II IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E2111999-01-0707 January 1999 Notice of Violation from Insp on 981101-1212.Violation Noted:On 971022,radiation Protection Technicians Released One Container with Two Items Contaminated Above Limits Specified in Procedure RSP-0213 ML20199A2161999-01-0505 January 1999 Notice of Violation from Investigation Conducted on 971231. Violation Noted:On 971015,A Wells,Employee on Entergy Operations,Inc,Submitted to NRC Info Known to Be Inaccurate in Some Respect Matl to NRC ML20198T0691999-01-0505 January 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Info Was Provided to Senior Resident Inspector That Was Not Complete & Accurate in All Matl Respects Re 971010 of RWP 97-0002 ML20203A6601999-01-0505 January 1999 EN-99-001:on 990105,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Violation Involving Superintendent of Radiation Control at Licensee River Bend Station Facility ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9151998-12-29029 December 1998 Notice of Violation from Insp on 980720-0807.Violation Noted:On 980724,licensee Made Change to Facility as Described in Safety Analysis Rept,Which Created Unreviewed Safety Question,Without Prior Commission Approval IR 05000458/19980991998-12-22022 December 1998 SALP Rept 50-458/98-99 Canceled.Process Suspended for Two Yrs.No Insp Rept Will Be Issued for Number IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20154L7021998-08-17017 August 1998 Corrected Notice of Violation from Insp Completed on 980218. Corrected NOV Sent to Make Consistent with Ltr Sent on 980722 & to Make Clear That No Response Required ML20236V2081998-07-29029 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980601,while Accomplishing Clearance Order 98-0583, Operator Did Not Follow Sequence Shown on Clearance Order While Positioning Components IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154M5531998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980323. Violation Noted:On 970908,WJ Ginn,Employee of Contractor to Entergy Operations,Inc,Deliberately Submitted Info to Licensee That Was Incomplete & Inaccurate ML20154L7351998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980218. Violation Noted:On 970711,DL Brown Employee of Contractor to Util Deliberatly Submitted Info to Licensee That Brown Knew Incomplete & Inaccurate on Security Questionnaire IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4461998-04-17017 April 1998 Notice of Violation from Insp on 980222-0404.Violation Noted:Established Measures Did Not Assure That Deviation from Environ Design Criteria Was Controlled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support PNO-IV-98-016, on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing1998-04-14014 April 1998 PNO-IV-98-016:on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing ML20217B4701998-03-24024 March 1998 Notice of Violation from Insp on 980223-26.Violation Noted: Licensee Not Maintained Records of Reviews of Radiation Protection Program Content & Implementation ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability 1999-09-08
[Table view] |
See also: IR 05000458/1985043
Text
e .
'
. .
x.
,
, APPENDIX B .
' '
U. -S. NUCLEAR REGULATORY COMISSION
-
REGION IV
NRC Inspection.Reporti 50-458/85-43 CP: CPPR-145
Docket: 50-458
Licensee: Gulf States Utilities Company-(GSU)
P. O. Box 2951
' Beaumont, Texas 77704
Facility Name: River Bend Station (RBS)
Inspection At: River Bend Station, St. Francisville, Louisiana
Inspection Conducted: May 1 through June 15, 1985
Inspect : v_/ 8
D. 7. C6am@ rTain, Senior Resident Inspector Date-
(pars. 1, 2, 3, 4, 5, 6, 7, 11)
Y A >J 61^
hJ yB rt9 nan, Reactor Inspector, Operations
$
Date
$$
( Secti n, Reactor Project Branch (par. 8)
L nu m
J./P. yaudo , Chief, Project Section A, Reactor
sh/er
Date
froject anch
Approved: c , /4 /4 . /) A [ dI
J./ P. paup6n, Chief, ProIect' Section A, Date
(Reac'to(Projects Branch
Inspection Summary
l- Inspection Conducted May 1 through June 15, 1985 (Report 50-458/85-43)
Areas Inspected: Routine, unannounced inspection of licensee action on
previous inspection findings, site tours, reactor protection system
preoperational test witness, reactor pressure vessel leakage test witness,
l control rod drive system full core scram test witness, reactor coolant system
l-
l
l
8508060287 850002
PDR ADOCK 05000458
G PDR
_
.
-.-ea r- --
e y - , .--w- ^.._..__m ,,a ..,9 - . -
7 .74
. _
- .. _ _ _
'
...
. .
, 4 _.
+
.
-g.
hydrostatic ~ test results evaluation, construction quality assurance (QA)
~ program review,-Inspection and Enforcement (IE) Bulletin followup, and
allegation followup.' The inspection involved 147 inspector-hours onsite by
three NRC' inspectors.
Results: .Within the areas' inspected, onb violation was issued in the area of
construction QA program review (failure to obtain.NRC approval of a QA
program' change, paragraph 8).
.
. .
..
,
f
4
r
T ,,
9 5
4 , 4
8 '
5
,, i
i f
'
>
$
k
r
-
i
!
i
i
!
, . . _ -. _ , _ . - . - , _. ~ _ _ _ . . . .. . . _ . , - . _ . . _ . . _ . _ . . _ _ _ _ _ _ _ . _ _ _ _ _ . _ . ---
- - .
,
. .
-3-
DETAILS
1. Persons Contacted
Principal Licensee Employees
K. Arnstedt, Quality Assurance (QA) Engineer
- W. H. Cahill, Jr. , Senior Vice President, River Bend Nuclear Group
J. Davis, QA Engineer
- P. J. Dautel, Licensing Staff Assistant
- J. C. Deddens, Vice President, River Bend Nuclear Group
D. R. Derbonne, Supervisor, Startup and Test
S. Finnegan, Control Operating Foreman
- P. E. Freehill, Superintendent, Startup and Test
- D. R. Gipson, Assistant Plant Manager, Operations
P. D. Graham, Assistant Plant Manager, Services
R. W. Helmick, Director, Projects
K. C. Hodges, Supervisor, Quality Systems
D. Jernigan, Engineer, Startup and Test
- G. R. Kimmell, Supervisor, Operations QA
- G. V. King, Supervisor, Plant Services
J. L. Pawlik, Engineer, Startup and Test
- T. L. Plunkett, Plant Manager
- S. R. Radebaugh, Assistant Superintendent, Startup & Test
- S. F. Sawa, Control Superintendent, Startup & Test
- J. E. Spivey, QA Engineer
R. B. Stafford, Director, Quality Services
K. E. Suhrke, Manager Project Planning & Coordination
L. Sutton, QA Engineer
- P. F. Tomlinson, Director, Operations QA
- A. Valenzuela, Startup and Test
- J. Venable, Mechanical Maintenance Supervisor
D. White, Engineer, Startup and Test
Stone and Webster
D. P. Barry, Superintendent of Engineering
W. I. Clifford, Senior Construction Manager
F. W. Finger, III, Project Manager, Preliminary Test Organization (PTO)
M. Fischete, Engineer, Startup and Test
- P. H. Griffin, Site Advisory Manager
B. R. Hall, Assistant Superintendent, Field Quality Control (FQC)
Q. E. Harper, Hydro Test Engineer
D. Hill, Maintenance Engineer
R. L. Spence, Superintendent, FQC
The NRC senior resident inspector (SRI) also interviewed additional
7 ; " :
- [ i.5 .[
.
,r'
,
?' Mf A
s
Q3 ,3'~~ '
-
? 5 -
' *; -
yy < t.: ' y..
.v
g 3* ,
l/: ;
'
,
..
y ,
.
'- 4-
~
'
, <
,
licensee, Stone and Webster (S&W), and other contractor personnel ~during
lthe inspection period.
-
l
"
- Denotes .those persons that attended the exit' interview conducted on
!. jJune21,1985. _.
[2. Licensee Action on Previous Inspection Findings
a'. (0 pen) 0'enp Item (458/8408-01): ' Review to determine if and how the
- diesel; generator loading restrictions of calculation 12210-E-122 are
implemented in plant operating procedures.
, ,
The. SRI obtained a copy.of calculation 12210-E-122, Revision 4,
" Standby Diesel generator Loading Calc. ," dated March 1,1984. This
revision.of the calculation is based on a 3500-KW loading limit on
the diesel and does not' reflect the latest load restriction of 3130
- KW. However, a GSU letter RBG - 20,086 dated February 6, 1985,
.contains revisions to the FSAR "to establish a qualified load for
'
,
"'
each of the diesel generators." These revisions include, for diesel
4
1EGS*EG1A loading, a requirement.that "LPCS or RHR A pump shall be
. manually tripped after 2.0 hr of LOCA, depending upon the available
' diesel generator sets" and for diesel 1EGS*EG1B loading, a requirement
^ '
that "RHR C is stripped manually.by the operator after 2.0 hr of
operation after LOCA, depending upon the combination of the available
,
diesel generator. sets."
Abnormal Operating Procedure A0P . .0004, Revision 1, " Loss of Offsite
'
Power," dated April 10, 1985, appears to address the latest loading
' 1 restrictions (3130 KW) for the diesels,' but the stated action for
' manual tripping of an RHR or LPCS pump in Section 5.8 needs some
.
clarification. For example, it is not clear under what conditions
that RHR A pump is tripped,instead of the'LPCS pump. This item will
remain open pending issue'of an approved calculation reflecting
. qualified diesel loading and pending the required clarifications in
procedure Section 5.8.
, b. (0 pen) Unresolved Item (458-8408-04): Review of licensee ' "
program,'
'
. for tracking of commitments to the NRC. -
,
.
GSU has developed and implemented a commitment tracking program at
-
- River Bend. Project Procedure' No. 8.2,'" Identifying and Tracking
,,
Project Commitments," was issued on Augu~st 9,.1984,Dto " provide
-
guidelines for River Bend Nuclear Group <(R8NG) organizations for
m
identifying, documenting, tracking,,and closing commitments made .to
." . regulatory agencies." Nuclear licensing is responsible for the
' :l :' ' ' tracking system' with QA responsible for verification of completion .
( of commitments on a sampling basis.' ' GSU' uses the "19AC" computer
w program and they have identified approximately ^2,152,t.cenitments to
date. The present status of the 1,191'open commitments is 717.high'
priority commitments required for fuel, load and 156 required after
fuel load, and there are 280 low priority commitments required for
fuel load and 38 required after fuel load.
4
>
,
_. h
h .
'
w e .
, ,
,- ;, .
-
,
- -5-
l
~
-
L c. This item will remain open for the SRI to evaluate the GSU method _of
w identifying commitments that require closure prior to fuel load and
> for identifying those that can be completed after fuel' load.
GV
?' '
c. (Closed) Open Item (458/8434-01): Implementation of preoperational
3*, test commitments ~by the control rod drive'(CRD) hydraulic
preoperational test procedure (1-PT-052).
,
,o .
ir^ The' specific items of concern were impienentation of'the following ,
Final safety Analysis Report (FSAR), Chapter 14, test commitments:
'
j
"1.e. To verify the failure mode of the CRD
L system on loss of power."
' "3.j. The CRD pumps are tripped and the time for
accumulator' inoperable alarms to occur is
'
,. recorded as baseline data."
,
"4.f. . All scram valves open on a loss of
g instrument air to the CRD, system."
- The above items were addressed in the. following manner:
'
1. 'e . Th'e failure mode of the CRD system was
tested by verifying the scram function on a
> loss of power to the scram' pilot solenoids.
'
'
3.j. ~A minor change request (MCR 09) was issued
'
to require recording of the times for all
hydraulic control units which exhibited low
accumulator pressure alarms within 10
- minutes after tripping oflthe CRD pump.
4.f. An acceptance criteria step 10.9 was added
"
9 by a major change request (MRC 06) to
reference the backup scram valve test which
demonstrates that the scram valves open on a
loss of instrument air.
l
This item is closed.
,
d. .(Closed) Violation (458/8507-01):- Procedures were not implemented-
to maintain Class 8 cleanliness requirements in the spent fuel storage.
area'where the new fuel was to be stored'in accordance with the
-
Special Nuclear Material License issued on January 15, 1985.
,
'
GSU took immediate action to issue an unsatisfactory inspection
report and fuel' receipt was delayed 1 day to allow removal and
inspection of the spent fuel racks and clean up of the spent fuel
pool floor. Following'the cleaning, the spent fuel racks were
x
1_
r;
y
'
l -
.
-
-6-
reassembled in the pool and fuel receipt progressed as scheduled.
Also, to prevent recurrence of this type of item, housekeeping and
cleanliness procedures shall be implemented as a prerequisite to the
governing procedures.
This item is closed.
e. (Closed) Deviation (458/8507-02): Preoperational test procedures
are not being provided for NRC review 60 days prior to the scheduled
test performance in all cases.
Only four preoperational test procedures remained to be submitted for
NRC review at the time of this deviation. The.four remaining
procedures were expedited and all have now been submitted.
This item is closed.
f. (Closed) Open Item (458/8522-07): GSU has installed motor operated
valve'(M0V) circuit breaker trips that can be reset either manually
or automatically. GSU has not established control to verify that all
such resets are in the manual mode.
Motor control center starters for MOVs at River Bend have both
thermal overload trip and magnetic trip devices. The magnetic trip
devices trip the manual circuit breaker to remove the overload
condition.' The magnetic, trip device then resets automatically, but
the~ circuit breaker must be manually reclosed to provide power to the
' starter. The thermal overload trip device opens the circuit to the
~
motor starter to: remove the overload condition. The thermal overload
device'has a hand / automatic option on reset. GSU has chosen to place
all of the thermal overload ' devices in the hand reset position.
Temporary Change Notice.No.85-131 has been issued to revise Procedure
No. CMP-1026, " Corrective Maintenance of MCC Starters," to include a
step for verifying that hand automatic reset selectors are in the
- hand position for thermal overload trip devices. GSU operations was
notified of this' condition per memorandum APM-M-85-94 dated June 13,
1985. It was also noted during the review of this item that certain
loss of coolant accident initiated MOVs would have not thermal
overload trip devices installed.
,
This item is closed.
'
i g. (Closed)) Open Item (458/8522-12): A system had not been provided
for assuring that each piece of measuring and test equipment (M&TE)
is calibrated and adjusted on or before the date required.
Procedure ADM-0029, Revision 4, " Control of Measuring and Test
Equipment (M&TE)," has been revised via temporary Change Notice
< 85-733 to clarify the system used and the responsibilities for the
recall of M&TE for calibration. Also, in addition to the recall
.-
>
L -
n
'
t
- *
. .
,
-7-
. requirements, the M&TE issue facility must verify that the M&TE
calibration due date is current prior to issue of the M&TE and users
of M&TE are required to verify that the calibration of M&TE is
current prior to use. All of these requirements are intended to
preclude the use of any M&TE for which the calibration has expired.
This item is closed.
3. Site Tours
The SRI toured areas of the site during the inspection period to gain
knowledge of the plant and to observe general job practices. The site
tours conducted included special tours on separate occasions with
Commissioner Bernthal and with a group fron NRC Nuclear Reactor Regulation
headed by Harold Denton. Both of these tours included the conduct of mock
scenarios on the River Bend plant simulator.
No violations or deviations were identified in this area of inspection.
' 4. Reactor Protection System Preoperational Test Witness
The SRI witnessed portions of the reactor protection system response time
'
measurements testing conducted during this inspection period. The
specific testing witnessed included reactor pressure sensor response
timing, reactor vessel level sensor response timing and drywell pressure
sensor response timing. Testing personnel experienced several problems
with the set up of the response time test equipment which caused testing
delays. They also experienced problems with interpreting the response
time curves such that the proper ramp was generated for acceptance.
criteria purposes. The vendor for the test equipment was brought to the
site and the test equipment problems were corrected. Also','a uniform
method for interpreting the response time curves was formulated. The SRI
conducted a preliminary review of several response time curves and it
appeared that the response times were within acceptance criteria limits.
The major testing remaining for the reactor protection system
preoperational test at the end of this inspection period was the
intermediate range monitor (IRM) and average power range monitor (APRM)
response time measurement testing.
No violations or deviations were identified in this area of inspection.
5. Reactor Pressure Vessel Leakage Test Witness
This special reactor pressure vessel (RPV) leakage test (1.MPRV.002) was
performed in order to disposition a Nonconformance and Disposition (N&D)
Report No. 11275. This N&D resulted when the review of the N-5 data
reports on the reactor pressure vessel indicated that no hydrostatic test
was performed subsequent to the installation of reactor-internals or
rework on nozzle safe ends. This included installation of items such as
control rod drive (CRD) housings, incore housings, recirculation and
(~ 't
.
_
~-
-
<
c ;
,
... .
.
, .
_
%
.,
t - , '
'
-8-
'
'
,
qp -
,
.
._ a ,
N ~
feedwater safe end rework, jet pump.pene'tration seals, etc. The reactor ,
. pressure-: vessel system hydro procedure (1-G-ME-15) and associated
[v ' '
. ; documentation did not identify the welds for these items,as being'withinJ
-
.the scope of the RPV hydro-test inspections.' _Therefore, during the RPV '
,
hydro' conducted in May 1984, documentary evidence of the inspection off
,t these welds was not obtained.
'TheSRIwitnessedthe-RPVleakagetestingandweldinspectionspe[ form ~
Jon May 16, 1985. The leakage testing was performed at a design pressure
E of 1250 psig. Initially, trouble was. experienced with obtaining the test-
. _ pressure _due to excessive leakage through the gaged safety relief valves.
Test personnel obtained apnroval from the relief valve vendor which
4. -
allowed the relief valve gags to be torqued to 30 foot pounds psig at a
. .RPV pressure of 1000 psig. This was accomplished and they were then able
, , to obtain the required test pressure. The test pressure was held for a
'
minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prior to the performance'of the official inspections.
The inspections were' performed and no problems were identified.
'No violations or deviations were identified in this area of inspection.
L< 6. -Control Rod Drive System Full Core Scram Test Witness *
During this: inspection period, two back up scram valve full core reactor
scram tests were performed to complete the control rod drive system
t - '
preoperational testing. Also, a special full core reactor scram test was
performed to evaluate the scram discharge volume level instrument response.
The. SRI witnessed the perfo'rmance of the special scram test on May 29, 1985.
'This special scram test was performed ~in conjunction with reactor
, ' protection system response time testing and the scram was initiated by a
reactor-vessel low water signal.
.
No violations or deviations were identified in this area of inspection.
7. Reactor Coolant System Hydrostatic Test'Results Evaluation
The SRI conducted a review of the completed test results_for the RPV
system hydrostatic test (Procedure 1-G-ME-15) and for the subsequent
reactor pressure vessel' leakage test.(Procedure 1.MPRPV.002). The
specific areas reviewed and findings noted included the following:
a. Changes to the test procedures were documented and implemented in
'accordance with the licensee's administrative controls.
.b. The system boundary either included all piping and equipment
protected by the safety' relief valves or documentation was provided
~
to show that; separate hydros were performed on equipment.or piping
'
,
that could be isolated from the RPV. ,
,
c. The water quality met all requirements.- ,
.
, g
'
u <
g
-.
'
-
- , ,
'
f. -
-
-9 '
. . d. The licensee held the maximum test pressure (1.25 times the design
-- -
pressure) for at least 10 minutes during the RPV system hydro test.
The hydrostatic test pressure did not exceed the maximum pressure
'
, e.
tallowed.
.f. -.The reactor coolant temperature ~was maintained above the~ nil
ductility transition temperature throughout the hydro and leak
>
< . testing.
g. All' identified test exceptions 'have been resolved, but a concern was
"'
'
identified with Test Exception TE-13 for Procedure 1-G-ME-15. This
test exception addressed certain flexible hoses that were not
installed'at the time of the original hydro. There were 40 hoses
i identified on the test exception and they were apparently identified
-
--
on system punch lists for~ installation and hydro at a later date.
>
. , , -The SRI selected 4 flexible hoses (Nos. 114, 121, 122, and 140) for a
,
review of the rework documentation to determine if the required
, hydros were performed. Of the four selected, documentation was
<
- obtained to verify that the' flex hoses did receive ~a subsequent hydro
However, it was noted that the flange connections on these
~
test.
flex hoses had been blanked during the hydro'and only two of the.four
. - rework control forms required a subsequent operational . leak test
(OLT). This was discussed with test personnel and it was determined
that the performance of OLTs, on a flange connection that.is completed
after a hydro, has been normal practice at River Bend. Further
review revealed that three of the four hoses received an OLT during
~
-
the RPV leakage test per a startup trouble ticket (STT). The fourth
hose was not specifically. mentioned on the STT, but it was identified
on. working drawings as being inspected. The SRI believes that no
problem was created by failure to note an OLT requirement on the
rework document and test personnel stated that the normal practice
will continue for performance of OLTs.
l h. The test results have been reviewed and approved by those personnel
charged with the responsibility.
The SRI also. reviewed selected vendor supplied pump and valve hydro
records and no problems were noted.
No violations or deviations were identified in this area of inspection.
'
8. Construction QA Program Review
,
, 'A review of the licensee construction QA program revealed that on June 10,
1983, GSU forwarded fnr approval a revision of their construction QA
program as required by 10 CFR 50.55(f)(2). Discussions with licensee
personnel revealed that revised Section 17.1.2.4.A reducing the periodicity
'.
of GSU . review of all controlled documents from 1 year to 2 years was made
after March 11 1983. Licensee personnel further stated that this change
o .had been implemented, although it had never been approved by NRC.
,
I
. -
,
-10-
Implementation of this change is in violation of 10 CFR Part 50.55(f)(3),
which requires prior NRC approval of licensee QA program changes made
after March 11, 1983, when such changes reduce commitments. (8543-01)
9. Inspection and Enforcement (IE) Bulletin Follow Up
The purpose of this inspection was to followup on licensee action taken in
response to Inspection and Enforcement Bulletins (IEBs),
a. IEB 84-03
This bulletin concerned the consequences of a failure of the
refueling cavity seal. The NRC inspector reviewed the following
licensee correspondence to the NRC (Region IV).
Letter Serial Date Items Addressed
RBG-19487 11-29-83 . Cross Seal Failure
. Maximum Leak Rate
Because of Seal
Failure
.Make Up Water
Capacity
. Potential Effect on
Stored Fuel and
Fuel in Transfer
.0ther Consequences
RBG- 20042 02-01-84 . Emergency Operating
Procedures
RBG- 20635 04-05-85 . Time to Cladding
Damage Without
Operator Action
RBG-21023 05-15-85 . Time to Cladding
Damage Without
Operator Action
These four letters address all of the points required by IEB 84-03.
The design of the seal used at River Bend is a stainless steel
bellows assembly welded to its support structure. The maximum
credible leakage rate is within make up capacity. Total failure of
the seal without operator action could result in a problem for fuel
in transit between the reactor vessel and the containment fuel
storage pool. This is addressed in licensee Procedure A0P-0032,
which requires the fuel to be placed in either the vessel or storage
racks. All other fuel would remain covered with water, and no vital
equipment would be flooded by a complete draining caused by a bellows
failure. The bellows is also protected from direct impact by a
radiation shield and a guard ring.
l
l
. .-
-11-
IEB 84-03 is considered closed.
b. IEB 77-06
This bulletin concerned General Electric Series 100 containment
electrical penetrations. River Bend does not use this type of
electrical penetration. Therefore, there is no action required at
River Bend for IEB 77-06.
IEB 77-06 is considered closed.
c. IEB 79-15
This IEB addressed deep draft pump deficiencies and the long term
operability of these pumps.
The NRC inspector found that the licensee had addressed operability
of pumps in the FSAR, and this was recognized in NUREG-0989, the
safety evaluation report for River Bend. Additionally, the final
draft technical specifications contained surveillance requirements
for monthly demonstration of pump operability in accordance with the
ASME code,Section XI and an 18-month system operability test. Since
the question of deep draft pump operability is being addressed by the
normal review process and implementation of the requirements to test
is under the routine inspection program, no additional tracking of
this IEB is warranted.
IEB 79-15 is closed for record purposes.
~
d. IEB 79-23
This IEB concerned the potential failure of emergency diesel
generators. The failure could result if there was a large
circulating current between the exciter transformer and the
generator. Such a circuit could be set up by connection through a
'
.
common ground. It was found that the design of all three emergency
diesel generators at RBS was such that exciter transformers had a
floating primary neutral. Subsequent testing of the emergency diesel
generators did not disclose any problems of the type discussed in
this IEB.
IEB 79-23 is considered closed.
e. IEB 79-27
This IEB concerned the loss of non-Class 1-E instrumentation and
control power. This IEB was not specifically directed to River Bend,
but it was included in the FSAR review, becoming Question 421.003 and
as Confirmatory Item 31 of NUREG-0989, the Safety Evaluation Report.
Since the action required by this IEB is being tracked as a confirma-
tory item, IEB 79-27 is closed for record purposes.
_ _ ___ _.__ .____._ .__-.___
. . , .
-12-
f. IEB 80-08
.
This IEB addressed radiography of flued head design penetrations of
the containment. The licensee was found to use flued head design in
both the containment and the drywell. The licensee committed to use
radiography on all flued head design penetrations of the containment
and other nondestructive tests on other penetrations.
, This IEB is closed.
'
-
g. IEB 80-16
This IEB concerned Rosemont pressure transmitters, Models 1151 and
1152. When these transmitters were fitted with either "A" or "0"
output code cards, it was possible for the transmitters to have an
ambiguous output and the input signal was either an over pressure or
a reverse pressure signal. The licensee found that there were four ,
Rosemont 1152 transmitters with an "A" output code. These four
transmitters were modified to have an "N" output board.
IEB 80-16 is considered closed.
10. Allegation Follow Up
The NRC inspecto.a did a followup inspection of an allegation.
. Backaround. An anonymous letter was sent to both Gulf States
Utilities (GSU) and the NRC. This letter forwarded an internal piece
of Stone and Webster (S&W) correspondence. This S&W correspondence
was a letter signed by engineers in the design group for small bore
pipe. The letter complained that the group was being required to
account for on-the-job time in a log and alleged that such a time
accounting procedure was inimical to quality assurance.
. Licensee Action. GSU conducted a quality assurance review of the
small bore piping group March 4-22, 1985.
. NRC Review. The NRC inspector reviewed the report of the licensees'
review. It was noted that the licensee had concluded that the
allegation was not substantiated in that the use of a time log to
account for time spent on various charge items does not have a direct
relationship to quality assurance. It was further noted that there
were four additional concerns noted by the quality assurance review.
The NRC inspector noted that the licensee had followed up on these
four concerns and closed them.
. Conclusion. The NRC inspector concluded that the allegation was
substantiated in that the time log was kept but that it was invalid
as a safety concern.
This item is closed.
,
___ ____ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - -
- _ _ _ _ _ _ _ _ - _ _ _ - _ - _ _ _ ,
'
. . .
.
t
-13-
11. Exit-Interview .
An exit interview was conducted on June 21, 1985, with licensee
representatives (identified in paragraph 1). .During this interview, the
SRI reviewed the scope and findings of the inspection.
.