ML20133B879
| ML20133B879 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/02/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20133B883 | List: |
| References | |
| NUDOCS 8508060280 | |
| Download: ML20133B879 (2) | |
See also: IR 05000458/1985043
Text
n
-
. - , .
4
AUG 0 21985
In Reply Refer To:
Docket: 50-458/85-43
Gulf States Utilities
ATTN: William J. Cahill, Jr.
Senior Vice President
. River Bend Nuclear Group
P. O. Box 2951
Beaumont, Texas
77704
Gentlemen:
This refers to the inspection conducted by Messrs. D. D. Chamberlain, J. P.
' Jaudon, and J. R. Boardman of this office during the period May 1 through June
.
15, 1985, of activities authorized by NRC Construction Permit for River Bend
Station, and to the discussion of our findings with Mr. J. C. Deddens and other
members of your staff at the conclusion of the inspection.
Areas. examined during the inspection -included review of licensee action on
previous inspection findings, site tours, reactor protection system pre-
- operational test witness, reactor pressure vessel leakage test witness, control
rod drive system full core scram test witness, reactor coolant system
hydrostatic test results evaluation, construction quality assurance (QA)
program review, Inspection and Enforcement (IE) Bulletin follow up, and
allegation follow up. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
These findings are documented in
the enclosed report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notices are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
\\
R /
RPB A
B
RIV:S
.
Chp
riain/lw
Boardman
J
ydon
J Jinson
,//5
/) /85
/ //85
g// /85
.
lo
a
-
C
~i-
s
-
t
go.4 -
,
2'
'
,
.
,
-
_
,
,
.. ~
'
'
_
,
_,
,
'
'
y-
V-
.
,
'
-2-
'
-
.
E
r
4
-Should you:have any ques' ions concerning.this inspection, we will be pleased to
'
t
l
discuss them with you.
I
Sincerely,
<
Cz: sun e m5 3,
J. P. Jaudca
'
.E. H.. Johnson,- Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice'of Violation
E2.
Appendix B - NRC Inspection Report
50-458/85-43
cc w/ enclosures:
l
Gulf States Utilities
LATTN:
J. E. Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951
Beaumont, Texas; ,77704
,
Louisiana State University
Government Documents Department
Louisiana Radiation Control Program Director
.
bec to DMB (IE01)
bec distrib. by RIV:
- RPB1
R. P. Denise, DRSP
- Resident Inspector
-R. D.: Martin, RA
- Section Chief-(RP81/A)
- D. Weiss, LFMS (AR-2015)
- MIS System
3
- RSTS Operator
- EP&RPB
.
'*RIV File
- w/766
- 1.
' :' I
,
! , ',$
l
.
-
.
1,