ML20133B825
| ML20133B825 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/02/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20133B828 | List: |
| References | |
| NUDOCS 8508060267 | |
| Download: ML20133B825 (2) | |
See also: IR 05000458/1985031
Text
,
._
__
_ _ _
-
,
'
'
s
,
,
,h
1
AUG 0 01985
'
'
In Reply Refer To:
Docket:
50-458/85-31
'
,
s
s
l
Gulf States Utilities
ATTN: William J. Cahill, Jr.
q'
,
Senior Vice President
,
River Bend Nuclear Group
P. O. Box 2951
'
Beaumont, Texas 77704
Gentlemen:
g
This refers to the inspection conducted by Ms. K. A. Whittlesey and Mr. J. I.
Tapia of this office during the period April 3-8, 1985, of activities
authorized by NRC Construction Permit CPPR-145 for River Bend Station,.nd to
>
the discussion of our findings with you, and other members of your staff at, the
conclusion of the inspection.
Areas examined during the inspection included witnessing the containment
structural integrity test and integrated leak rate test.
Within these areas,
the inspection consisted of selective examination of procedures and representa-
tive records, interviews with personnel, and observations by the ins pctor.
These findings are documented in the enclosed inspection report.
';
,
During this inspection, it was found that certain of your activitves here in
violation of NRC requirements.
Consequently, you are required t6 respond to
!
this violation, in writing, in accordance with the provisions ai>Section 2.201
of the NRC's Rules of Practice," Part 2. Title 10 Corte of Ftdoal
Regulations. Your response should be based on the specifics (rncalNd in the
'
Notice of Violation enclosed with this letter.
!,,
The response directed by this letter and the accompanying Notice ie nd SOject
to the clearance crocedures of the Office of Management and Budget as required
,
by the Paperwork leduction Act of 1980, PL 96-511.
,
0
lb
f.yy)ul' ),
! (
RP02/0h
RPul' A
RIV:RP02/
RPD' /0
/
KAWhittinsey
JITapia
DHunnicutt
JPJaudon
Juhnson
1/Pl/05
1/M/05
'l /g'l/05
7,/t/65
5,/\\/85
!
[88 Ta'X 8888,L,ou
r6* I
g
If
. _ _ _ _ _ _ _ _ _ _ _ _
..
. .
.
. _ _ .
- - _ _ .
_ _ _ _
'
'
.j'r
i
.
l
3
CulfSt$tesUtilities
-2-
Shouldyouhaveanyquestionsconcerningthisinspection,wewillbepleasedto
discuss them with you.
9
Sincerely,
k
f, ,-
t.
- ;j
l
J . P. J, : _: a
, ,
b
T'
(
sC(
.
'
E. H. Johnson, Chief
'
'
Reactor Project Branch 1
/
Enclosures:
g
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-458/85-31
'
cc w/ enclosure:
, Gulf States Utilities
ATTN:
J. E.' Booker, Manager-
Engineering, Nuclear
Frels & Licensing
P. O., Box 2951
Beaumont, Texas 77704
Louisiana Statu University,
Government Cocuments Department
,
' Lot.istana Radiation Control Program Director
'
3
bcc to DMB (IE01)
bec distrib, by RIV:
- RP81
R. P. Denise, DRSP
- Resident Inspector
R. D. Martin, RA
- $ection Chief (RPB1/A)
- 0. Weiss, LFMB (AR-2015)
'
',
- MIS System
- RSTS Operator
- EP&RPB
- RIV File
- w/766
,.
f
l
b
.i
f._.,,
.