ML20133B757

From kanterella
Jump to navigation Jump to search

Amends 34 & 23 to Licenses NPF-10 & NPF-15,respectively, Modifying Tech Spec 3/4.8.1.1, Electrical Power Sys - AC Sources - Operating, Re Onsite Electrical Power Sources
ML20133B757
Person / Time
Site: San Onofre  
Issue date: 09/25/1985
From: Knighton G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20133B763 List:
References
TAC-56214, TAC-56219, NUDOCS 8510070104
Download: ML20133B757 (14)


Text

.

eun 8

g%,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION

~

n 3

E WASHINGTON, D. C. 20555

%.....)

SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE, CALIFORNIA THE CITY OF ANAHEIM, CALIFORNIA DOCKET NO. 50-361 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 34 License No. NPF-10 1.

The Nuclear Regulatory Comission (the Comission) has found that:

i A.

The application for amendment to the license for San Onofre Nuclear Gener3 ting Station, Unit 2 (the facility) filed by the Southern California Edison Company on behalf of itself and San Diego Gas and Electric Com California (pany, The City of Riverside and the City of Anaheim, licensees) dated October 1, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as i

amended (the Act) and the Comission's regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, as 4

i amended, the provisions of the Act, and the regulations of the Comission; i

C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this license amendment will not be inimical to the comon defense and security or to the health and safety of the public; E.

The issuance of this amendment is in accordance with 1G CFR Part 51 of the Comission's regulations and all applicable recu!rements have been satisfied.

P

~

I

' 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-10 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 34, are hereby incorporated in the license.

SCE shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This amendment is effective immediately and is to be fully implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION N

George W

nighton, ef Licensi g Branch N. 3 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: September 25, 1985 1

4 i

i i

=-

September 25, 1985

, ATTACHMENT TO LICENSE AMENDMENT NO. 34 FACILITY OPERATING LICENSE N0. NPF-10 DOCKET NO. 50-361 i

Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and i

contain vertical lines indicating the area of change. Also to be replaced are the following overleaf pages to the amended pages.

2 Amendment Pages Overleaf Pages 3/4 8-2 3/4 8-1 B3/4 8-1 B3/4 8-2 J

i l

i j

1 I

\\

i

3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION

3. 8.1.1 As a minirgum, the following A.C. electrical power sources shall be OPERABLE:

a.

Two physically independent circuits between the offsite transmission network and the onsite Class lE distribution system, and b.

Two separate and independent diesel generators, each with:

1.

A day fuel tank containing a minimum volume of 325 gallons of

fuel, 2.

A separate fuel storage system containing a minimum volume of 47,000 gallons of fuel, and 3.

A separate fuel transfer pump.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

a.

With either an offsite circuit or diesel generator of the above required A.C. electrical p'ower sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or he in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, b.

With one offsite circuit and one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereaf ter; restore at least one of the

, inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

c.

With one diesel generator inoperable in addition to ACTION a or b above, verify that:

I 1.

All required systems, subsystems, trains, components and devices

(

that depend on the remaining OPERABLE diesel generator as a source of emergency power are also OPERABLE, and SAN ONOFRE-UNIT 2 3/4 8-1

l ELECTRICAL POWER SYSTEMS ACTION (Continued) 2.

When in MODE 1, 2, or 3, the steam-driven auxiliary feed pump is OPERABLE.

If these conditions are not satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

i d.

With two of the above required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of two diesel generators by performing Surveillance Requirement 4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, unless the diesel generators are already operating; restore at least one of the inoperable offsite l

sources to OPERABLE status within 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> or be in at leat HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With only one offsite source 4

following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

With two of the above required diesel generators inoperable, e.

demonstrate the OPERABLE of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the i

inoperable diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Restore at least two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS i

4.8.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class 1E' distribution system shall be:

Determined OPERABLE at least once per 7 days by verifying correct 1

a.

breaker alignments and indicated power availability.

If tie breakers 3A0416 or 3A0603 are used to provide the second source of power, the following busses are required.

for 3A0416 for 3A0603 3A04 3A06 3804 3806 301 302 l

l f

l SAN ONOFRE-UNIT 2

' 3/4 8-2 AMEN 0 MENT NO. 34 c

ELECTRICAL POWER SYSTEMS 3/4.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1, 3/4.8.2, and 3/4.8.3 A.C. SOURCES, D.C. SOURCES and ONSITE POWER DISTRIBUTION SYSTEMS l

The OPERABILITY of the A.C. and D.C. power sources and associated distri-l bution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for 1) the safe shutdown of the facility and 2) the mitigation and control of accident conditions within the facility.

The minimum specified independent and redundant A.C. and D.C.

power sources and distribution systems satisfy the requirements of General y

Design Criteria 17 of Appendix "A" to 10 CFR 50.

The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commen-surate with the level of degradation.

The OPERA 8ILITY of the power sources are consistent with the initial condition assumptions of the safety analyses and are based upon maintaining at least one redundant set of onsite A.C. and L

D.C. power sources and associated distribution systems OPERABLE durir.g accident conditions coincident with an assumed' loss of offsite power and sing 1t failure of the other onsite A.C. source.

The A.C. and D.C. source allowable out-of-service times are based on Regulatory Guide 1.93, " Availability of Electrical Power Sources," December 1974. When one diesel generator is inoperable, there is an additional ACTION requirement to verify that all required systems, subsystems, trains, components and devices, that depend on the remaining OPERABLE diesel generator as a source of emergency power, are also OPERABLE, and that the steam-driven auxiliary feedwater pump is OPERABLE. This require-ment is intended to provide assurance that a loss of offsite power event will not result in a complete loss of safety function of critical systems during the period one of the diesel generators is inoperable.

The term verify as used in this context means to administrative 1y check by examining logs or other information to determine if certain components are out-of service for maintenance or other reasons.

It does not mean to perform the surveillance requirements needed to demonstrate the OPERABILITY of the component.

The OPERABILITY of the minimum specified A.C. and 0.C. power sources and associated distribution systems during shutdown and refueling ensures that

1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the unit status.

The Surveillance Requirements verify the OPERABILITY of the required independent circuits between the offsite transmission network and the onsite Class IE distribution system.

Two independent circuits are required in Modes 1 through 4.

One source of power is supplied from Unit 2 itself and is normally provided through the Reserve Auxiliary Transformers (2XR1 and 2XR2).

If the Unit 2 main generator iso phase bus links are removed, then the Unit Auxiliary Transformer 2XU1 can be used in place of 2XR1 and/or 2XR2.

The second source of power is provided through the Unit 3 Reserve Auxiliary Transformers (3XR1 and 3XR2) and/or, with the Unit 3 generator iso phase bus links removed, the Unit 3 Unit Auxiliary Transformer (3XU1).

SAN ONOFRE-UNIT 2 B 3/4 8-1 AMEN 0 MENT NO. 34 L

r ELECTRICAL POWER SYSTEMS BASES A.C. SOURCES, D.C. SOURCES AND ONSITE POWER DISTRIBUTION SYSTEMS (Continued)

The Surveillance Requirements for demonstrating the OPERABILITY of the diesel generators are in accordance with the recommendations of Regulatory Guides 1.9 " Selection of Diesel Generator Set Capacity for Standby Power Supplies," March 10, 1971, and 1.108 " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants," Revision 1, August 1977, and 1.137, " Fuel Oil Systems for Standby Diesel Generators,"

Revision 1, October 1979.

Reg. Guide 1.137 recommends testing of fuel oil samples in accordance with ASTM-D270-1975. However, ASTM-D270-1965 was reverified in 1975 rather than re-issued.

The reverified 1965 standard is therefore the appro-priate standard to be used.

Additionally, Regulatory Guide 1.9 allows loading of the diesel generator to its 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating in an accident situation.

The full load, continuous operation rating for each diesel generator is 4700 kw, while the calculated accident loading is 4000 kw.

No 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> loading has been specified by the diesel generator manufacturer and, as a result the full loading rating of 4700 kw is conservatively established as the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating.

Diesel fre-quency droop restrictions are established due to HPSI flow rate considerations.

The Surveillance Requirement for demonstrating the OPERABILITY of the Station batteries are based on the recommendations of Regulatory Guide 1.129,

" Maintenance Testing and Replacement of Large Lead Storage Batteries for Nuclear Power Plants," February 1978, and IEEE Std 450-1980, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Large Lead Storage Batteries for Generating Stations and Substations."

Verifying average electrolyte temperature above the minimum for which the battery was sized, total battery terminal voltage onfloat charge, co,nnection resistance values and the performance of battery service and discharge tests ensures the effectiveness of the charging system, the ability to handle high discharge rates and compares the battery capacity at that time with the rated capacity.

Table 4.8-2 specifies the normal limits for each designated pilot cell and each connected cell for electrolyte level, float voltage and specific gravity.

The limits for the designated pilot cells float voltage and specific gravity, greater than 2.13 volts and.015 below the manufacturer's full charge specific gravity or a battery charger current that had stabilized at a low value, is characteristic of a charged cell with adequate capacity.

The normal limits for each connected cell for float voltage and specific gravity, greater than 2.13 volts and not more than.020 below the manufacturer's full charge specific gravity with an average specific gravity of all the connected cells not more than.010 below the manufacturer's full charge specific gravity, ensures the OPERABILITY and capability of the battery.

SAN ONOFRE-UNIT 2 8 3/4 8-2 AMENDMENT NO. 34

)

M 0*i 7^

UNITED STATES NUCLEAR REGULATORY COMMISSION j

Dh;},

WASHINGTON, D. C. 20555

\\[..Jd./

SOUTHERN CALIFORNIA EDIS0N COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE, CALIFORNIA THE CITY OF ANAHEIM, CALIFORNIA DOCKET NO. 50-362 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 23 License No. NPF-15 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment to the license for San Onofre Nuclear i

Generating Station, Unit 3 (the facility) filed by the Southern j

California Edison Company on behalf of itself and San Diego Gas and Electric Company, The City of Riverside and the City of Anaheim, 4

i California (licensees), dated October 1,1984, complies with the i

standards and requirements of the Atomic Energy Act of 1985, as amended (the Act) and the Commission's regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2-2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-15 is hereby i

amended to' read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protcetion Plan contained in Appendix B, as revised through Amendment No. 23, are hereby incorporated in the license.

SCE shall operate the facility in accordance with the Tc:hnical Specifications and the'En/ironmental Protection Plan.

i

~

3.

This amendment is effective immediately and is to be fully implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION t

1

+

rss

(

George W' rnighten, PHI 6f Licensihg Branch No. 3 Division of Licensing

Attachment:

i Changes to the Technical Specifi:ations Date of Issuance: September 25, 1985 i

1 i

i h

i i

I w

r-->

.__,e._,.m.

g.._-

,..--_r-,

g --.,. --

m--

-p-

-.9y e ---

w-ay=g--o-,. = - =

-eem,%e-,mog-

=.

September 25, 1985

. ATTACHMENT TO LICENSE AMENDMENT NO. 23 FACILITY OPERATING LICENSE NO. NPF-15 DOCKET NO. 50-362 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change. Also to be replaced are the following overleaf pages to the amended pages.

Amendment Pages Overleaf Pages 3/4 8-2 3/4 8-1 B3/4 8-1 83/4 8-2

}

4 f

i I

I i

~'

3/4.8 ' ELECTRICAL POWER SYSTEMS s'

3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical, power sources shall be OPERABLE:

Two physically independent circuits between the offsite transmission a.

network and the onsite Class lE distribution system, and b.

Two separate and independent diesel generators, each with:

1.

A day fuel tank containing a minimum volume of 325 gallons of

fuel, 2.

A separate fuel storage system containing a minimum volume of 47,000 gallons of fuel, and 3.

A separate fuel transfer pump.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

g a.

With either an offsite circuit or diesel generator of the above required A.C.-electrical power sources inoperable, demonstrate the OPERAGILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With one offsite circuit and one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance l

Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the fraperable sources to OPERABLE status 41 thin 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at it h t HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within "ie following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

I With one diesel generator inoperable in addition to ACTION a or b c.

above, verify that:

1.

All required systems, subsystems, trains, components and devices

(-

that depend on the reraining OPERABLE diesel generator as a source of emergency power are also OPERABLE, and i

i SAN ONOFRE-UNIT 3 3/4 8-1 l

. - -., ~ -

1 i

ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

ACTION (Continued) 2.

When in MODE 1, 2, or 3, the steam-driven auxiliary feed pump is OPERABLE.

If these conditions are not satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, d.

With 'two of the above required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of two diesel generators by performing Surveillance Requirement 4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, unless the diesel generators are already operating; rostore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With only one offsite source restored, restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

With two of the aDove required diesel generators inoperable, demon-e.

strate the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at least i

once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Restore at least two diesel genera-tors to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class 1E distribution system shall be:

Determined OPERABLE at least once per 7 days by verifying correct a.

breaker alignments and indicated power availablity.

If tie breakers 2A0417 or 2A0619 are used to provide the second source of power, the following busses are required.

for 2A0417 for 2A0619 2A04 2A06 2004 2806 2D1 202 SAN CNOFRE-UNIT 3 3/4 8-2 AMENDMEN1 NO. 23

s g

r 3/4.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1, 3/4.8.2, and 3/4.8.3 A.C. SOURCES, D.C. SOURCES and ONSITE POWER DISTRIBUTION SYSTEMS i

The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety-related equipment required for 1) the safe shutdown of the facility and 2) the mitigation and control of accident condi-tions within the facility.

The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix "A" to 10 CFR 50.

The ACTION requirements specified for the levels of degradation of the 3"

power sources provide restriction upon continued facility operation commen-surate with the level of degradation.

The OPERA 8ILITY of the power sources is consistent with the initial condition assumptions of the safety analyses and is based upon maintaining at least one redundant set of onsite A.C. and D.C.

power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of the other onsite A.C. source.

The A.C. and D.C. source allowable out-of-service times are based on Regulatory Guide 1.93, " Availability of Electrical i

Power Sources," December 1974. When one diesel generator is inoperable, there is an additional ACTION requirement to verify that all required systems, subsystems, trains, components and devices, that depend on the remaining OPERABLE diesel generator as a source of emergency power, are also OPERABLE, and that the steam-driven auxiliary feedwater pump is OPERABLE.

This require-ment is intended to provide assurance that a loss of offsite power event will not result in a complete loss of safety function of critical systems during the period one of the diesel generators is inoperable.

The term verify as i

used in this context means to administratively check by examining logs or other information to determine if certain components are out of service for maintenance or other reasons.

It does not mean to perform the surveillance requirements needed to demonstrate the OPERABILITY of the component.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and i

associated distribution systems during shutdown and refueling ensures that i

1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability i

i is available for monitoring and maintaining the unit status.

The Surveillance Requirements verify the OPERABILITY of the required independent circuits between the offsite transmission network and the onsite Class IE distribution system.

Two independent circuits are required in Modes 1 through 4.

One source of power is supplied from Unit 3 itself and is normally provided through the Reserve Auxiliary Transformers (3XR1 and 3XR2).

If the Unit 3 main generator iso phase bus links are removed, then the Unit Auxiliary Transformer 3XU1 can be used in place of 3XR1 and/or 3XR2.

The second source of power is provided through the Unit 2 Reserve Auxiliary Transformers (2XR1 and 2XR2) and/or, with the Unit 2 generator iso phase bus links removed, the Unit 2 Unit Auxiliary Transformer (2XU1).

SAN ONOFRE-UNIT 3 B 3/4 8-1 AMEN 0 MENT NO. 23 l

ELECTRICAL POWER SYSTEMS ELECTRIC POWER SYSTEMS BASES A.C. SOURCES, D.C. SOURCES AND ONSITE POSER DISTRIBUTION SYSTEMS (Continued)

The Surveillance Requirements for demonstrating the OPERABILITY of the diesel generators are in accordance with the recommendations of Regulatory Guides 1.9 " Selection of Diesel Generator Set Capacity for Standby Power Supplies," March 10, 1971, and 1.108 " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants," Revision 1, August 1977, and 1.137, " Fuel Oil Systems for Standby Diesel Generators,"

Revision 1, October 1979.

Regulatory Guide 1.137 recommends testing of fuel oil samples in accordance with ASTM-D270-1975.

However, ASTM-D270-1965 was reverified in 1975 rather than re-issued.

The reverified 1965 standard is therefore the appropriate standard to be used.

Additionally, Regulatory Guide 1.9 allows loading of the diesel generator to its 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating in an accident situation.

The full load, continuous operation rating for each diesel generator is 4700 kw, while the calculated accident loading is 4000 kw.

No 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> loading has been specified by the diesel generator manufacturer and, as a result the full loading rating of 4700 kw is conservatively established as the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating.

Diesel fre-quency droup restrictions are established due to HPSI flow rate considerations.

The Surveillance Requirement for demonstrating the OPERABILITY of the Station batteries are based on the recommendations of Regulatory Guide 1.129,

" Maintenance Testing and Replacement of Large Lead Storage Batteries for Nuclear Power Plants," February 1978, and IEEE Std 450-1980, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Large Lead Storage Batteries for Generating Stations and Substations."

Verifying average electrolyte temperature above the minimum for which the battery was sized, total bactery terminal voltage onfloat charge, connection resistance values and the performance of battery service and discharge tests ensures the effectiveness of the charging system, the ability to handle high discharge rates and compares the battery capacity at that time with the rated capacity.

Table 4.8-2 specifies the normal limits for each designated pilot cell and each connected cell for electrolyte level, float voltage and specific gravity.

The limits for the designated pilot cells float voltage and specific gravity, greater than 2.13 volts and.015 below the manufacturer's full charge specific gravity or a battery charger current that had stabilized at a low value, is characteristic of a charged cell with adequate capacity.

The normal limits for each connected cell for float voltage and specific gravity, greater than 2.13 volts and not more than.020 below the manufacturer's full charge specific gravity with an average specific gravity of all the connected cells not more than.010 below the manufacturer's full charge specific gravity, ensures the OPERABILITY and capability of the battery.

SAN ONOFRE-UNIT 3 8 3/4 8-2 AMENDMENT NO. 23 I

!