APPENDIX A
"
Public Service Company of New Hampshire Docket No.
50-443
Seabrook Unit 1 License No. CPPR-135 I
As a result of the inspection conducted on July 8 - August 27,1985 and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C) published -in the Federal Register on March 8,1984 (49 FR 8583) the following violations were identified:
.
i i
A.
10CFR50, Appendix B, Criterion III and the Seabrook Station FSAR, Section
'
17.1.'1.3 require that the suitability of-materials and processes essential to the safety-related functions of components be reviewed and that deviations.
>
'from the appropriate quality) standards be controlled. Procedure, ASP-3 (Revision 2 New Hampshire Yankee
'
conformance report (NCR)' dispositions are used as design changes, to include
providing design details appropriate _to the identified nonconforming conditions.
i UE&C NCRs 74/1903B and 74/29148 specify repair dispositions to the limit switch j
supports on three safety-related, safety injection (SI) valves.
{
Contrary to the above, as of July. 19,1985, repair work was completed to the three subject, safety-related valve limit switch supports (1-SI-V89, V90, &
I i
V93) using design details,as specified by NCRs 74/19038 and 74/2914B, which
.
were inappropriate to the identified nonconforming conditions and which were unclear as-to specifying the controls and standards necessary to assure the ability ~of the affected components to perfonn their safety-related functions.
This lack of design change clarity resulted in the installation of material
.
and welds in conflict with engineering intent and in the failure to apply the
'
required quality assurance controls, including inspection, to safety-related j
work activities.
l This is a Severity Level IV Violation (Supplement II)'.
,
!
.
i B.
10CFR50, Appendix B, Criterion XVI and the Seabrook Station FSAR, Section
,
l 17.1.1.16 require that conditions adverse to quality be corrected.
In the
'
!
case of significant conditions adverse to quality, particularly those governed
!
by 10CFR50.55(e) requirements, the corrective measures prescribe that the actions
taken be documented and reported, as appropriate.
Seabrook Project Policy No.27 (Revision 3) specifies that in the reporting of 10CFR50.55(e) information,.
'
i corrective action is verified to have been completed by the Construction QA-organization prior to the issuance of a Final Report to'the NRC. For a re-
portable 10CFR50.55(e) deficiency on the diesel generator exhaust silencer
!
pedestal cracking, corrective action was specified to ~be the redesign and i
replacemer.t of' the original concrete pedestals with steel pedestals. The l
Final Report to the NRC, dated June 10,1985, stated that.the redesign and
l rework had been completed.
'
l Contrary to the above, as of July 8,1985, corrective action to the subject l
deficiency on the diesel generator exhaust silencer pedestal cracking had not been completed prior to the issuance of the Final Report to the NRC. Construc-
tion QA verification, in accordance with Project Policy No.27, was inadequately
)
8510010503 850918
'
PDR - ADOCM 05000443 G
-
g l
,-,_ _ _ _ _. - _ _
_ _ _ _
.
_
.c
-
.
-
.
- - - _. -
-
--
-.. _
...
.
_.
_..
~_
.
_- -
y
.
applied by relying only on documentation, in lieu of hardware, verification.
The QA program for corrective measures was also inadequate, for this case, in
.
not requiring that all safety-related work activities be examined and documented
!
in accordance with quality control acceptance criteria. These inadequacies
!
led to incomplete and unverified bolting work on the steel replacement pedestals at a time when QA docunentation and the June 10,1985 Final Report
.
indicated the corrective action rework had been completed.
,
This is a Severity Level IV Violation (Supplement II).
Pursuant to the provisions of 10 CFR 2.201, Public Service Company of New Hampshire
,
is hereby required to submit to this office within 30 days of the date of the
'
letter transmitting this Notice, a written statement or explanation in reply,
!
including for each violation:
(1) the corrective steps which have been taken and the results achieved; (2) the corrective steps which will be taken to avoid further j
violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
!
'
.