Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed
ML20132B748
Person / Time
Site: Millstone 
Issue date: 12/09/1996
From: Richardson P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132B752 List:
References
B16056, GL-96-01, GL-96-1, NUDOCS 9612170373
Download: ML20132B748 (2)


LER-1996-035, Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)
3361996035R00 - NRC Website

text

..y

__m.

~ _. _ _.. _ _ _ _ _. _ _ _ -.,.. _. _ _. _. _... _ _ -.. - _.. _ _. _.... _.

8 e

i A N:rthe _st -

i 7 seiaen sm wriin, er 06037

.. Utilities System

.wnhea.: uta. serviu comt.any i-P.O. Box 270 Ilartford, cT 061410270 (C60) 665 5000 t-i December 9,1996 i

i Docket No. 50-336

=i i

B16056 J

Re: 10 CFR 50.73(a)(2)(i) i i

l U.S. Nuclear Regulatory Commission Document Control Desk l

Washington, DC 20555

. This letter forwards Licensee Event Report (LER) 96-035-00, documenting an event that t

occurred at Millstone Nuclear Power Station, Unit No. 2 on October 9,1996. This LER is being j

l submitted pursuant to 10 CFR 50.73(a)(2)(i).

!~

The following are NNECO's commitments made within this letter. All other statements made L

within this letter are for information or.ly.

B16056-01:

A review is on-going which includes an assessment of Technical '

d i

Specification surveillance requirements to address the concems identified in Generic Letter 96-01. This review will be completed by September 30,1997.

B16056-02:

Training will be provided to l&C and Operations Department surveillance procedure development personnel on the information i

produced by the Generic Letter 96-01 review. This training will i

emphasize the process utilized to ensure complete testing of logic i

circuits required by Technical Specifications. This training will be completed by September 30,;1997.

1 i

B16056-03:

For the interim period, awareness briefings will be held with l&C and

)

Operations Department surveillance procedure writing personnel by I

January 15,1997

/ L' 9612170373 961209 PDR. ADOCK 05000336 S

PDR 160016 ny ms

.U. S. NuQl:Ir Regulatory Commission 816056/P gs 2 616056-04:

The procedures that direct the process of writing and revising surveillance procedures will be revised to incorporate the process developed in response to Generic Letter 96-01. This will ensure that future surveillance procedure revisions will maintain compliance with logic testing requirements. This revision will be completed by i

September 30,1997.

i i

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY P. M. Richardson Director-Millstone Unit No. 2 l

Attachment: LER 96-035-00 1

1 cc:

W. D. Travers, Director of Special Projects H. J. Miller, Region I Administrator D. P. Beaulieu, Resident inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 l