November 4, 1996 s
Mr. C. Randy Hutchinson Vice President, Operations AN0 Entergy Operations, Inc.
1448 S. R. 333 Russellville, AR 72801
SUBJECT:
CORRECTION TO THE RELOCATION OF THE REACTOR COOLANT SYSTEM (RCS)
FLOW RATE LIMIT TO THE CORE OPERATING LIMITS REPORT (COLR),
ARKANSAS NUCLEAR ONE, UNIT 2 (ANO-2) (TAC NO. M96479)
Dear Mr. Hutchinson:
By letter dated November 1, 1996, we issued a Notice of Denial of Amendment.
The Notice of Denial was issued without the date of the Commission's letter.
A corrected Notice of Denial is enclosed, with the date inserted on both pages 1 and 2 for completeness. We regret any inconvenience this may have caused.
Sincerely, ORIGINAL SIGNED BY:
Kombiz Salehi, Acting Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-368
Enclosure:
Notice of Denial of Amendment cc w/ encl:
See next page i
DISTRIBUTION:
Docket File WBeckner ACRS PUBLIC CHawes JDyer, RIV JRoe KSalehi TCollins EAdensam (EGA1)
OGC PD4-1 r/f Document Name:
AR296570296570COR OFC (A)PM/PD4-1 (A)LA/PD4-1 D/PD4.1 j
NAME KSalehi k CHawes /}11/
WBeckkr 4
DATE H /M/96
///M/96
// /M/96 COPY YES/N0 fYESfNO YES/N0 0FFICIAL RECORD COPY
\\
oso07s NRC HLE CENTER @
9611060217 961104 PDR aDOCK 05000368 P
anny k
g UNITED STATES
[
S NUCLEAR REGULATORY COMMISSION 5
f WASHINGTON, D.C. 206d50001 S *****l i
November 4, 1996 Mr. C. Randy Hutchinson Vice President, Operations AN0 Entergy Operations, Inc.
1448 S. R. 333 Russellville, AR 72801 CORRECTIONTOTHERELOCATIONOFTHEREACTORCOOLANTSYSTEM
SUBJECT:
FLOW RATE LIMIT TO THE CORE OPERATING LIMITS REPORT (COLR),
ARKANSAS NUCLEAR ONE, UNIT 2 (ANO-2) (TAC NO. M96479)
Dear Mr. Hutchinson:
By letter dated November 1,1996, we issued a Notice of Denial of Amendment.
The Notice of Denial was issued without the date of the Commission's letter.
A corrected Notice of Denial is enclosed, with the date inserted on both pages I and 2 for completeness. We regret any inconvenience this may have caused.
Sincerely, Kombiz Salehi, Acting Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-368
Enclosure:
Notice of Denial of Amendment cc w/ encl: See next page
Mr. C. Randy Hutchinson Vice President, Operations AN0 November la 1996 Entergy Operations, Inc.
1448 S. R. 333 Russellville, AR 72801
SUBJECT:
RELOCATION OF THE REACTOR COOLANT SYSTEM (RCS) FLOW RATE LIMIT TO THE CORE OPERATING LIMITS REPORT (COLR), ARKANSAS NUCLEAR ONE, UNIT 2 (AN0-2) (TAC NO. M96479)
Dear Mr. Hutchinson:
By letter dated August 23, 1996, Entergy Operations, Inc. (E01), requested that NRC complete its review prior to the next ANO-2 refueling outage (2R12),
scheduled to begin on April 11, 1997.
The NRC staff completed its review of the application and found it necessary to deny the request. The basis of this denial is E01's inclusion of Reactor Coolant System's (RCS) flow rate in the COLR. The COLR concept in Generic l
Letter 88-16 was established for core operating limits that normally vary from cycle to cycle primarily because of changes in fuel design.
RCS flow rate is normally not a cycle-specific parameter. A change in flow rate usually i
indicates a physical change such as steam generator tube repairs or pump i
degradation, thus requiring the NRC review.
Therefore, RCS flow rate is not an acceptable parameter for relocation to the COLR, and E01's application to relocate the RCS flow limit to the COLR is denied.
A copy of the Notice of Denial of Amendment to be published in the Federal Reaister is enclosed for your information.
Sincerely, ORIGINAL SIGNED BY:
Kombiz Salehi, Acting Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation l
Docket No. 50-368
Enclosure:
Notice of Denial of Amendment cc: See next page DISTRIBUTION:
Docket File WBeckner ACRS PUBLIC CHawes JDyer, RIV JRoe KSalehi TCollins EAdensam (EGA1)
OGC PDIV-1 r/f Document Name: AR296470296470LTR OFC PM/PD4-1 (A)LA/PD4-1 (A)BC/SRXB*
OGC*
D/PD4-1*
NAME KSalehi/vwb CHawes /}m14 TCollins WBeckner DATE
!!///96
// /// /96 10/21/96 10/28/96 10/31/96 COPY YEl/NO YES/N0 YES/N0 YES/N0 YES/N0 0FFICIAL RECORD COPY
}{S-6SG 30 &
Q
l p urog kl UNITED STATES g
NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 2066H001
% *****/
November 1, 1996 Mr. C. Randy Hutchinson Vice President, Operations AN0 Entergy Operations, Inc.
1448 S. R. 333 Russellville, AR 72801 l
SUBJECT:
RELOCATION OF THE REACTOR COOLANT SYSTEM (RCS) FLOW RATE LIMIT TO l
THE CORE OPERATING LIMITS REPORT (COLR), ARKANSAS NUCLEAR ONE, l
UNIT 2 (ANO-2) (TAC N0. M96479)
Dear Mr. Hutchinson:
By letter dated August 23, 1996, Entergy Operations, Inc. (E01), requested that NRC complete its review prior to the next AN0-2 refueling outage (2R12),
scheduled to begin on April 11, 1997.
The NRC staff completed its review of the application and found it necessary l
to deny the request. The basis of this denial is E0I's inclusion of Reactor Coolant System's (RCS) flow rate in the COLR. The COLR concept in Generic Letter 88-16 was established for core operating limits that normally vary from cycle to cycle primarily because of changes in fuel design.
RCS flow rate is normally not a cycle-specific parameter. A change in flow rate usually indicates a physical change such as steam generator tube repairs or pump l
degradation, thus requiring the NRC review.
Therefore, RCS flow rate is not an acceptable parameter for relocation to the COLR, and E01's application to relocate the RCS flow limit to the COLR is denied.
A copy of the Notice of Denial of Amendment to be published in the Federal Reaister is enclosed for your information.
l Sincerely, l
l Kombiz Sale 1, Acting Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-368
Enclosure:
Notice of Denial of Amendment cc w/ encl: See next page t
)
Mr. C. Randy Hutchinson Entergy Operations, Inc.
Arkansas Nuclear One, Unit 2 cc:
Executive Vice President Vice President, Operations Support
& Chief Operating Officer Entergy Operations, Inc.
Entergy Operations, Inc.
P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-199 Wise, Carter, Child & Caraway Director, Division of Radiation P. O. Box 651 Control and Emergency Management Jackson, MS 39205 Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Manager, Rockville Nuclear Licensing Framatone Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza. Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801