ML20129H622

From kanterella
Jump to navigation Jump to search

Forwards Notice of Denial of Licensee 960823 Request That NRC Complete Review of Relocation of RCS Flow Rate Limit to Core Operating Limits Rept
ML20129H622
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/01/1996
From: Salehi K
NRC (Affiliation Not Assigned)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
Shared Package
ML20129H625 List:
References
TAC-M96479, NUDOCS 9611050302
Download: ML20129H622 (4)


Text

_ _ _ . _ . . _ . . . _ . _ . ._. . . _ . _ _ - _ _ . _ _ _ . . _ . . . - . _ _ _ _ . _ . _ . _

' ~ DISTRIBUTION:  !

1-p/f PD4-1 r p .

i

[

CHawes  :

KSalehi 4  ;

November 1,1996 j MEMORANDUM TO: Rules Review and Directives Branch i i

l Division of Freedom of Information and Publications Services j Office of Administration.

i FROM: Office of Nuclear Reactor Regulation {

SUBJECT:

ENTEMY OPERATI0ttS, ISC. . ARKANSAS IluCLEAR ONE, UNIT 2 f t l

i' }

l One signed original of the FederalRegister Notice identified below is attached for your transmittal j l to the Office of the Federal Register for publication. Additional conformed copies (f j ye . ) of the .!

] ' Notice are enclosed for your use.  !

i Notice of Receipt of Application for Construction Permit (s) and Operating License (s).

1 Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s):  !

Time for submission of Views on Antitrust matters.

Notice of Consideration of lasuance of Amendment to Facility Operating License. '(Call with

[ 30-day insert date).

Notice of Receipt of Application for Facility License (s); Notice of 'vailability of Applicant's )

Environmental Report; cnd Notice of Consideration of issuance of Facility License (s) and Notice i of Opportunity for Hearing. I Notice of Availability of NRC Draft / Final Environmental Statement.  :

1 Notice of Limited Work Authorization. ,

l Notice of Availability of Safety Evaluation Report. '

Notice of lasuance of Construction Permit (s).

Notice of issuance of Facility Operating License (s) or Amendment (s).  !

Order. l' C Exemption.

Notice of Granting Exemption.

Environmental Assessment.

Notice of Preparation of Environmental Assessment.

Receipt of Petition for Director's Decision Under 10 CFR 2.206.

Issuance of Final Director's Decision Under 10 CFR 2.206.

L i Other: plc call veranica idilli w amy dat*

nn A1E-t w with +h. *a intert. l g am n=g. i. l 1

-nE o a.

- DOCKET NO. 50-363 ho Attachment (s): As stated

. Ng

Contact:

K. Salehi T:':y,ene: 415-1308 g< )CUMENT NAME:

e . ose,i. m ,n.ne. m m.in 6.m c . e m m om .n.ch,n.nu.new. r . cm m .u nu.nci u . u. ,,

~

I Al LAIFIM-jl 4$ 8FFICE l l l l l l

>4L LAME ritmust ('/r{l IATE 11/4/%

OFFICIAL RECORD COPY

' Mr. C. Randy Hutchinson Vice Presidento Operations AN0 November lo 1996 Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72801

SUBJECT:

RELOCATION OF THE REACTOR COOLANT SYSTEM (RCS) FLOW RATE LIMIT TO THE CORE OPERATING LIMITS REPORT (COLR), ARKANSAS NUCLEAR ONE, UNIT 2 (ANO-2) (TAC NO. M96479)

1

Dear Mr. Hutchinson:

By letter dated August 23, 1996, Entergy Operations, Inc. (E01), requested

, that NRC complete its review prior to the next ANO-2 refueling outage (2R12),

scheduled to begin on April 11, 1997.

The NRC staff completed its review of the application and found it necessary to deny the request. The basis of this denial is E0!'s inclusion of Reactor Coolant System's (RCS) flow rate in the COLR. The COLR concept in Generic Letter 88-16 was established for core operating limits that normally vary from cycle to cycle primarily because of changes in fuel design. RCS flow rate is a

normally not a cycle-specific parameter. A change in flow rate usually ,

indicates a physical change such as steam generator tube repairs or pump l

i degradation, thus requiring the NRC review. Therefore, RCS flow rate is not j an acceptable parameter for relocation to the COLR, and E01's application to '

relocate the RCS flow limit to the COLR is denied.

A copy of the Notice of Denial of Amendment to be published in the Federal Reaister is enclosed for your information.

Sincerely, DRIGINAL SIGNED BY:

Kombiz Salehi, Acting Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-368

Enclosure:

Notice of Denial of Amendment  !

cc: See next page l DISTRIBUTION:

Docket File, WBeckner ACRS DFOl ' /

PUBLIC CHawes JDyer, RIV JRoe KSalehi TCollins EAdensam (EGA1) OGC PDIV-1 r/f Document Name: AR296470.LTR OFC PM/PD4-1 (A)LA/PD4-1 (A)BC/SRXB* OGC* D/PD4-1*

NAME KSalehi/vw N CHawes Amfl TCollins WBeckner DATE  !! / l /96 // /// /96 10/21/96 10/28/96 10/31/96 COPY YEl/N0 YES/N0 YES/N0 YES/N0 YES/N0 0FFICIAL RECORD COPY 050074 NRC FILE CENTES COPY

ur g (

UNITED STATES N NUCLEAR REGULATORY COMMISSION f WASHINGTON, D.C. 2006H001

\*****/ November 1, 1996 Mr. C. Randy Hutchinson Vice President, Operations AN0 Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72801

SUBJECT:

RELOCATION OF THE REACTOR COOLANT SYSTEM (RCS) FLOW RATE LIMIT TO THE CORE OPERATING LIMITS REPORT (COLR), ARKANSAS NUCLEAR ONE, UNIT 2 (ANO-2) (TAC NO. M96479)

Dear Mr. Hutchinson:

By letter dated August 23, 1996, Entergy Operations, Inc. (E01), requested that NRC complete its review prior to the next ANO-2 refueling outage (2R12),

scheduled to begin on April 11, 1997.

The NRC staff completed its review of the application and found it necessary to deny the request. The basis of this denial is E01's inclusion of Reactor Coolant System's (RCS) flow rate in the COLR. The COLR concept in Generic Letter 88-16 was established for core operating limits that normally vary from cycle to cycle primarily because of changes in fuel design. RCS flow rate is normally not a cycle-specific parameter. A change in flow rate usually indicates a physical change such as steam generator tube repairs or pump degradation, thus requiring the NRC review. Therefore, RCS flow rate is not an acceptable parameter for relocation to the COLR, and E01's application to relocate the RCS flow limit to the COLR is denied.

A copy of the Notice of Denial of Amendment to be published in the Federal Reaister is enclosed for your information.

Sincerely, Kombiz Sale i, Acting Project Manager Project Directorate IV-1 j Division of Reactor Projects III/IV l Office of Nuclear Reactor Regulation Docket No. 50-368

Enclosure:

Notice of Denial of Amendment cc w/ encl: See next page I

i n

j Mr. C. Pandy Hutchinson Entergy Operations, Inc. Arkansas Nuclear One, !! nit 2 cc:

Executive Vice President Vice President, Operations Support

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-199 Wise, Carter, Child & Caraway Director, Division of Radiation P. O. Box 651 Control and Emergency Management Jackson, MS 39205 Arkansas Department of Health i

4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Manager, Rockville Nuclear Licensing j Framatone Technologica 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310

, London, AR 72847 Regional Administrator, Region IV i U.S. Nuclear Regulatory Commission l 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801 l