OPERATlHG DATA REPORT DOCKET NO.
50-244 DATE Anril 14_ 1985 COMPLETED BY [
M Andrew E. McNamaIa OPERATING STATUS
- 1. Unit Name:
GINNA STATION. UNIT #1 Notes
- 2. Reporting Period:
March, 1985
- 3. Licensed Thermal Power (MWr):
1520 service on March 2, 1985
- 4. Nameplate Rating (Gross MWe):
490 at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> for Annual
- 5. Design Electrical Rating (Net MWe):
470 Bofueling and Maintenance.
- 6. Maximum Dependable Capacity (Gross MWe): _ 490
- 7. Maximum Dependable Capacity (Net MWe):
470
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If \\ny (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr. to Date Cumulative
- 11. Ilours In Reporting Period 744.00 2.160.00 134.52DJQ
- 12. Number of flours Reactor Was Critical 25.03 1.441.03 101.889.74
- 13. Reactor Reserve Shutdown llours 0
0 1,687.55*
- 14. Ilours Generator On Line 24.5 1.440.50 99.732.88 0
0 8.5 *
- 15. Unit Reserve Shutdown llours
- 16. Gross Thermal Energy Generated (MWil) 27,648 2,119,608 138,405,369
- 17. Gross Electrical Energy Generated (MWil) 8,695 703,221 45,188,628
- 18. Net Electrical Energy Generated (MWil) 8,133 668.294 42.881.315
- 19. Unit Service Factor 3.29%
66.69%
74.14%
- 20. Unit Availability Factor 3.29%
66.69%.
74.15%
- 21. Unit Capacity Factor (Using MDC Net) 2.3%
65.83%
74.41%
- 22. Unit Capacity Factor (Using DER Net) 2.3%
65.83%
74.41%
- 23. Unit Forced Outage Rate 0
0 7.64%
- 24. Shutdowns Scheduled Over Next 6 Month.: (Type, Date and Duration of Each):
- 25. If Shur Down At End Of Report. Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL. Ell'CTRICITY COMMERCIAL OPERATION
- Cumulativo 'Ibtal Ccmnencing January 1,1975 o-.. m o v. vm 8506070526 8504 9 PDR ADOCK 0 4
R P
L
. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT
- 1, Ginna Station DATE April _14, 1985 COMPLETED BY 6)h 2. M* rih Andrew E. McNamara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH March, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
339 17.
2.
18.
3.
19.
4.
20.
5.
21.
6.
22.
7.
23.
8.
24.
9.
25.
10.
26.
11.
27.
12.
28.
13.
29.
14.
30.
15.
31.
16.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawat
[
IXX:KET NO.
50-244 UNIT NAME #1,Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE Anril 14. 1985 COMPLETEDIW b-b M *M D ; d, Andrew E. McNamara REPORT MONTH MARCH 1985 TELEPalONE f118;is24-4446 F5ct-301 m
.3 n
=
e eu Licens*e E,
gm Cause & Corrective Eq o
No.
Date 1.
'i !;
3 1,r I Event g -3 Action to gj j
i d ",
Report #
!0 Prevent Recurrence
?i 2
g u
o 85-1 3/2/85 S
719.5*
C 1
Annual Refueling and Maintenance shutdown.
- Hours in report perdIx1 only. The unit runained shutdown at the end of the month.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction' 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain) 4.- e. mev um Il-Other (Explain)
Exhibit I - Same Source
w a
~.
GINNA STATION MAINTENANCE REPORT
SUMMARY
MARCH, 1985 1.
"A" Reactor Coolant Pump Seal Inspection, Minor Motor Inspection to include oil change, oil lift hose replacement, and flywheel NDE inspection.
2.
"B" Reactor Coolant Pump Motor to include replacement of Lower Radial guide bearing, oil change, and balance check.
3.
"A" and "B" Charging Pumps - Lubrication and Internal Valve inspection.
"C" Charging nump lubrication, internal valve inspection, vari-drive overhaul and gear reducer repair.
4.
"A" and "B" Reactor Compartment Fans - minor inspection 5.
"A" and "D" Containment Recirc. Fans - minor inspection 6.
"A" and "B" Boric Acid Transfer Pumps - major inspection 7.
"A" and "B" Containment Spray Pumps - minor inspection 8.
"A" Diesel Generator - Annual Inspection to include prelube pump and Air Start Compressor overhaul.
"B" Diesel Generator Annual Inspection to include prelube pump overhaul.
Both fuel oil storage tanks were cleaned, inspected and refilled with new oil.
9.
Personnel and Equipment Air Locks - minor inspection 10.
"A" and "B" Safety Injection Pumps - minor inspection 11.
"A" Aux. FW Pump minor inspection to include major motor and lube oil pump inspection.
"B" Aux. FW pump minor inspection.
I 12.
Snubber inspections to include:
SGA-6 and SGA-8, rebuild and test, H-6-PR2, F.W.5, AFW 13, PS-5 PR2, also rebuild and test.
14 Mech. Snubber replace with new spares, snubber's sent to Wyle for testing.
13.
Installed new accumulator N2 filter unit.
14.
MOV 851B Repair Drive Extension Rod.
15.
Inspected and tested the following relief valves; RV-203,
.RV-434, RV-435, RV-755A, RV-887, RV-4655, RV-4656, RV-4659, RV-4660, RV-4723, and RV-4724.
t
16.
Replaced the following filters; B.A. Filters, A and B Seal Injection Filters, Ion Exchange filters, Rx Coolant Filters, Concentrates Holding Tank Filters, and Seal Return Filter.
17.
Inspected and repaired the following valves; V-835A, V-835B, V-431A, V-431B, V-110A, V-4310B, V-3994, V-840A, V-840B, MSCV-3519, and MSIV-3516.
18.
Replaced V-311C and CV-866B.
19.
Replaced piping between V-354 and V-110A.
20.
"A" and "B" FW Flow Nozzles - cleaned and inspected.
21.
S.G. Repair Program:
"A" S.G.
- 2 tubesheet sleeves installed in hocleg side, 4 explosive (B&W) plugs installed, 2 hotleg, 2 coldleg.
"B" S.G.
- 11 36" brazed sleeves installed in hotleg, 56 tubesheet sleeves installed in hotleg, 6 CE Mechanically Rolled / Removal plugs installed (3 hotleg, 3 cold 1 g), 2 B&W 9
explosive plugs installed (1 hotleg, 1 coldleg.)
~
. 2 2.
S.G. Inspection Program on Both'S.G.:
Secondary side top steam separation /feedring area, 3 camera inspections secondary tubesheet area, extensive Eddy Current Program, NDE of Primary / Secondary Manway's and Handhole bolts, U.T. of "J" tubes, RT/UT of FW inlet nozzles, visual of tubesheet plugs for " Leakers."
23.
S G.
Preventative Maintenance on Both S.G.:
2 waterlances, crevice cleaning - 4 natural circulation cycles and 6 forced circulation cycles, ground down tube lane blocking device split ring backing ring to provide additional clearance to S.G. Row 1 tubes, maximized wet layup and utilized wet layup recirculation system on "A"
S.G.
r-e---~
ce-ww w-rw--