.. OPERATING DATA REPORT DOCKET NO.

50 244 DATE April 19, 1985 COMPLETED BY F De - - w Andrew E. McNamaba TELEPliONE (3151524-4446 Prt. 301 OPERATING STATUS

1. Unit Name:

GINNA STATION. UNIT #1 Notes

2. Reporting Period:

March. 1985

3. Licensed Thermal Power (MWr):

1520 service on March 2, 1985 490 at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> for Annual

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

470 Refueling and Maintenance

6. Maximum Dependable Capacity (Gross MWe):

490

7. Maximum Dependable Capacity (Net MWe):

470

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

4

9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, if Any:

This Month Yr.-to-Da te Cumulative

11. Ilours In Reporting Period 744.00 2,160.00 134,520.00
12. Number of flours Reactor Was Critical 25.03 1.441.03 101,.889.74 0

0 1.687.55*

13. Reactor Reserve Shutdown llours
14. Ilours Generator On Line 24.5 1,14L1Q 99.732.80 0

0 8.5_*

15. Unit Reserve Shutdown llours
16. Gross Thermal Energy Generated (MWil) 27,648 2,119,608 138,405.369
17. Gross Electrical Energy Generated (MWil) 8,695 703,221 45,188.628
18. Net Electrical Energy Generated (MWil) 8.133 668.294

._1L 881.315

19. Unit Service Factor 3.29%

66.69%

74.14%

20. Unit Availability Factor 3.29%

66.69%

74.15%

21. Unit Capacity Factor (Using MDC Net) 2.3%

65.83%

69.44%**

22. Unit Capacity Factor (Using DER Net) 2.3%

65 E %

69 d41*_*_

0 0

7.64

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Repor period, Estimated Date of Startup:
26. Units In Test Status (Prior to s ommercial Operation):

Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Corrects calculating error in previously submitted report.