.. OPERATING DATA REPORT DOCKET NO.
50 244 DATE April 19, 1985 COMPLETED BY F De - - w Andrew E. McNamaba TELEPliONE (3151524-4446 Prt. 301 OPERATING STATUS
- 1. Unit Name:
GINNA STATION. UNIT #1 Notes
- 2. Reporting Period:
March. 1985
- 3. Licensed Thermal Power (MWr):
1520 service on March 2, 1985 490 at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> for Annual
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
470 Refueling and Maintenance
- 6. Maximum Dependable Capacity (Gross MWe):
490
- 7. Maximum Dependable Capacity (Net MWe):
470
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
4
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, if Any:
This Month Yr.-to-Da te Cumulative
- 11. Ilours In Reporting Period 744.00 2,160.00 134,520.00
- 12. Number of flours Reactor Was Critical 25.03 1.441.03 101,.889.74 0
0 1.687.55*
- 13. Reactor Reserve Shutdown llours
- 14. Ilours Generator On Line 24.5 1,14L1Q 99.732.80 0
0 8.5_*
- 15. Unit Reserve Shutdown llours
- 16. Gross Thermal Energy Generated (MWil) 27,648 2,119,608 138,405.369
- 17. Gross Electrical Energy Generated (MWil) 8,695 703,221 45,188.628
- 18. Net Electrical Energy Generated (MWil) 8.133 668.294
._1L 881.315
- 19. Unit Service Factor 3.29%
66.69%
74.14%
- 20. Unit Availability Factor 3.29%
66.69%
74.15%
- 21. Unit Capacity Factor (Using MDC Net) 2.3%
65.83%
69.44%**
- 22. Unit Capacity Factor (Using DER Net) 2.3%
65 E %
69 d41*_*_
0 0
7.64
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Repor period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to s ommercial Operation):
Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Corrects calculating error in previously submitted report.