October 18, 1996
Hr. K. Graesser
Site Vice President
Byron Station
Commonwealth Edison Company
4450 N. German Church Road
Byron, IL 61010
SUBJECT:
NRC INSPECTTON REPORT 50-454/455/96007
l
.
Dear Mr. Graesser:
On September 26, 1996, the NRC completed an inspection at your Byron 1 & 2
reactor facilities. The enclosed report presents the inspection results.
During the 6-week inspection period, the inspectors observed examples of
safety-conscious operations, sound engineering and maintenance practices, and
careful radiological controls. However, we are concerned about your
configuration controls during the conduct of surveillance tests.
In one
instance, the inspectors identified a violation regarding an inadequate
procedure that resulted in running the 2A chemical and volume control pump
without essential service water to its lube oil cooler.
The violation is cited in the enclosed Notice of Violation, and the
circumstances surrounding the violation are described in detail in the
enclosed report. Please note that you are required to respond to this letter
and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
fEDIf
ning HLE DENTER COPY
9610290191 961018
ADOCK 05000454
G
'
__
-__
.
__
. - _
.
'
-
K. Graesser
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure (s) will be placed in the NRC Public Document
Room (PDR).
Sincerely,
Original signed by John A. Grobe
'
James L. Caldwell, Acting Director,
Division of Reactor Projects
Docket Nos. 50-454; 50-455
Enclosures:
,
i
1.
2.
Inspection Report 50-454/455-96007(DRP)
4
cc w/ enc 1:
D. A. Sager, Vice President,
Generation Support
H. W. Keiser, Chief Nuclear
l
Operating Officer
K. Kofron, Station Manager
D. Brindle, Regulatory Assurance
Supervisor
I. Johnson, Acting Nuclear
Regulatory Services Manager
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Liaison Officer, Wisconsin
State Liaison Officer
Chairman, Illinois Commerce Commission
Document Control Desk-Licensing
Docket File w/enci
OC/LFDCB w/ encl
DRP w/enci
SRI Byron, Braidwood, Zion w/ encl
PUBLIC IE-01 w/ enc 1
,
Project Manager, NRR w/ encl
CAAl w/enci (E-mail)
A. B. Beach, w/ encl
RAC1 (E-Mail) w/ encl
B. L. Burgess, w/ encl
W. L. Axelson, w/enci
jg"*"P.,RjQnsy,ry,tsgwe[,s\\,byro\\96007grp
,
,
,
_
,
,
,
,,
,
,
,
.
.
OFFICE
RIII
RIII
I
RIII
RIII_...
N
'
,
,,,
,
,
NAME
Landsman k h 'ONh/Cr$k
Jiller Mk Gkhaldwell
DATE
10//0/96
10//0/96
10//d /96
1[/)[/96
0FFICIAL RECORD COPY