ML20129F685

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-454/96-07 & 50-455/96-07 on 960821-0926 & Nov.Nrc Concerned About Configuration Controls During Conduct of Surveillance Tests
Date released: 05/22/2020 Download: ML20129F685


Insp Repts 50-454/96-07 & 50-455/96-07 on 960821-0926. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status
ML20129F721
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/18/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
Download: ML20129F721 (15)
Notice of Violation from Insp on 960821-0926.Violation Noted:On 960914,procedure 2BVS 1.2.3.1-1, ASME Surveillance Requirements for Centrifugal Charging Pump 2A, Failed to Provide Adequate Steps to Ensure Essential Svc Water Sys
ML20129F709
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/18/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
Download: ML20129F709 (1)
Forwards Insp Repts 50-454/96-07 & 50-455/96-07 on 960821-0926 & Nov.Nrc Concerned About Configuration Controls During Conduct of Surveillance Tests
ML20129F681
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/18/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: GRAESSER K
COMMONWEALTH EDISON CO.
References
Download: ML20129F681 (2)