Insp Repts 50-424/85-23 & 50-425/85-23 on 850603-07. Violation Noted:Failure to Install Pressure Taps in Accordance W/Fsar P&ID
ML20129F309
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/20/1985
From: Blake J, Kleinsorge W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20129F269 List:
References
50-424-85-23, 50-425-85-23, NUDOCS 8507170306
Download: ML20129F309 (8)


See also: IR 05000424/1985023

Text

.

UNITED STATES

[pRico 'o

' ' ,

NUCLEAR REGULATORY COMMISSION

.I' \ ^

R EGION 11

h,('

  • is

,

's

101 MARIETTA STREET,N.W.

ATLANTA, GEORGI A 30323

'%) &

.....

Report Nos.: 50-424/85-23 and 50-425/85-23

Licensee: Georgia Power Company

P. O. Box 4545

Atlanta, GA 30302

Docket Nos.: 50-424 and 50-425 License Nos.: CPPR-108 and CPPR-109

Facility Name: Vogtle 1 an 2

Inspection Co e 3-7,

7

Inspector: < A/780

V

A. / re iri Uat Si ned

'

/

'

Approved by: -

h 2 &[

J. . e, Section Chief D' ate Signed

En ine ring Branch

D vis on of Reactor Safety

SUMMARY

Scope: This routine, unannounced inspection entailed 40 inspector-hours on site

in the areas of licensee action on previous enforcement matters (92702B),

construction progress (92706B) (Units 1 and 2), safety-related heating, ventila-

tion, and air conditioning (HVAC) systems (50100) (Unit 1), licensee identified

items (92700B) (Units 1 and 2), and IE Bulletin (IEB) (927038) (Units 1 and 2).

Results: One violation was identified " Failure to install pressure taps in

accordance with the FSAR P&ID" - paragraph 6. No deviations were identified.

.

8507170306

DR 850621

g ADOCM 05000424

PDR

.

.

REPORT DETAILS

1. Persons Contacted

Licensee Employees

  • B. C. Harbin, Manager, Quality Control (QC)
  • E. D. Groover, Quality Assurance (QA) Site Manager
  • D. L. Daniels, Assistant QC Manager

D. McCaury,' Civil Engineer Supervisor

Other licensee employees contacted included construction craftsmen,

engineers, technicians, and office personnel.

Other Organizations

Bechtel Power Corporation (BPC)

  • J. W. Carson, QA

Ogdetherpe Power Corporation (OPC)

  • D. R. Murphy, Construction Engineer

NRC Resident Inspectors

W. F. Sanders

J. F. Rogge

  • R. J. Schepens .

,

  • Attended exit interview

2. Exit Interview

The inspection scope and findings were summarized on June 7,1985, with

those persons indicated in paragraph 1. above. The inspector described the

areas inspected and discussed in detail the inspection findings listed

below. No dissenting comments were received from the licensee.

(0 pen) Inspector Followup Item 424, 425/E5-23-01: " Calibration Block

Material Identification" - paragraph 3.b.

'

(0:en) Violation 424/85-23-02: " Failure to Install Pressure Tab in

Accordance with the FSAR and P&ID" - paragraph 6.

,

The licensee did identify as proprietary some of the materials provided to,

and reviewed by the inspector during this inspection, however this material

is not discussed in this report.

,

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ . _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ . . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ . _ _ . _ _ _ ____ . _ _ _ _________________.________.___._________-_.____m. _____._.__

. . . _ - _ - . . -

.

.

2

3. Licensee Action on Previous Enforcement Matters

a. (Closed) _ Violation 50-424, 425/84-26-01: " Failure to address all

Essential- Variables in WPS"

Georgia Power Company (GPC) letter of response dated November 14, 1984

has been reviewed and determined to be acceptable by Region II. The

inspector held discussions with cognizant engineers and examined the

corrective actions as stated in the letter of response. The inspector

concluded that GPC had determined the full extent of the subject

noncompliance, performed the necessary survey and follow-up actions to

correct the present conditions and developed the necessary corrective

actions to preclude recurrence of similar circumstances. The

corrective actions identified in the letter of response have been

implemented,

b. (Closed) Violation 50-424, 425/84-36-02: " Lack of Procedure for UT

Calibration Standards"

'

GPC letter of response dated April 2,1985 has been reviewed and

determined to be acceptable by Region II. The inspector held

discussions with cognizant engineers and examined the corrective

actions as stated in the letter of response. The inspector concluded

that GPC had determined the full extent of the subject noncompliance,

performed the necessary survey and follow-up actions. to correct the

present conditions and developed the necessary corrective actions to

preclude recurrence of similar. circumstances. The corrective actions

identified in the letter of response have been implemented.

The inspector noted that two calibration blocks were identified es

" steel" and two others were identified as " stainless steel" (B-35A-18,

and 19 and B-358-18 and 19). The licensee was unable to provide any

more definitive information as to type of " steel" or " stainless steel",

but they indicated that they would take the steps necessary to identify

the calibration block material. The violation is considered closed;

however, the above calibration block material identification question

will be identified as inspector followup item 424, 425/85-23-01:

" Calibration Block Material Identification".

'

c. (Closed) Violation 50-424, 425/85-02-01: " Failure to Establish

Adequate Measures to Control Drawing Change Distribution"

GPC letter of response dated March 21, 1985 has been reviewed and

determined to be acceptable by Region II. The inspector held

,

discussions ~ with cognizant engineers _and examined the corrective

actions as stated in the letter of response. The inspector concluded

4 that GPC had determined the full extent of the subject noncompliance,

performed the necessary survey and follow-up actions to correct the

present conditions and developed the necessary corrective actions to

preclude recurrence of similar circumstances. The corrective actions

identified in the letter of response have been implemented.

- -

.

.

(

!

3

d. (Closed) Unresolved Item 424,425/84-26-02: " Unavailable PQR"

This item concerns the unavailability of a Procedure Qualification ,

Record .(PQR) for welding flair bevel welds. The licensee provided a

PQR to cover the weld in question. This matter is considered closed.

. 4. Unresolved Items '

!

l Unresolved items were not identified during this inspection.

!'

5. Independent Inspection Effort (92706B) (Units 1 and 2)

Construction Progress-

The inspector conducted a general inspection of construction block and

adjacent area to observe construction progress and construction activities

such as welding, material handling and control, housekeeping and storage.

j Within the areas examined, no violations or deviations were identified.

i

6.- Safety-Related Heating, Ventilation, and Air Conditioning (HVAC) Systems

j (50100) (Unit 1)

The inspector reviewed the licensee's HVAC program to determine whether the

technical requirements detailed or referenced in the facility Final Safety

Analysis Report (FSAR) associated with safety-related HVAC systems had been '

adequately addressed in the construction specifications, drawings, and work

,

procedures. The applicable codes for the fabrication and installation of

i HVAC systems are:

AWS-D1.1-77

, AWS-D9.1-80

l AWS-03/0-77

ASME Section IX-80

ANSI B31.1-77

As-Installed Equipment

The inspector made a walk down of-Control Rcom Air Intake System from

Tornado Damper ' A-1531-W7-304 shown on BPC-AX4DJ2101' to Fire Damper

A-1531-S7-567 shower on BPC-AX4DJ2107 to observe the completed installation

of the following equipment for proper location, configuration, identifica-

tion, and damage. The basis for this. determination was the FSAR system

description, piping and instrumentation diagrams (P& ids), specification, and

installation drawings. The drawings used and the items examined are listed

below.

.

, , - ,- ,----~, .--

7

- .

.

.

4

Drawings

BPC-AX5DX-2101, Rev. 4

BPC-AX5DX-2109, Rev. 3

BPC-AX4AJ07-493, Rev. E

BPC-AX4AJ07-494, Rev. E

BPC-AX4AJ07-495, Rev. E

BPC-AX4AJ07-13, Rev. P

BPC-AX4AJ07-14, Rev. P

BPC-AX4DB-206-3, Rev. 10

BPC-AX4DJ-2118 Rev. 5

BPC-AX4DJ-2101, Rev.10

BPC-AX4DJ-2109, Rev. 9

, BPC-AX4DJ-2104, Rev. 11

BPC-AX4DJ-2107, Rev. 11

BPC-AX4DB206-1, Rev. 11

BPC-AX2D11W128, Rev. 11

BPC-AX2011W130, Rev. 10

BPC-AX2D11W126, Rev. 11

BPC-AX2D11W120, Rev. 10

Items Examined

Identification Description

1-PDI-12137A MagnahelicGauge(0to2in)

1-PDI-121370 Magnahelic Gauge (0 to 25 in)

1-PDT-12137B Pressure Transmitter (0 to 25 in)

1-PDT-12137A Pressure Transmitter (0 to 5 in)

1-PDI-121378 Magnahelic Gauge (0 to 5 in)

A-1531-W7-304 Tornado Damper

-

DS-A113101-146 Duct Support

1-HV12115 Mechanical Damper

1-HV12114 Mechanical Damper

DS-A113101-145 Duct Support

DS-A113101-73 Duct Support

DS-A113101-71 Duct Support

DS-A113101-162 Duct Support-

DS-A113101-146 Duct Support

1-1531-B7-006-000 Return and Exhaust Fan

1-1531-N7-002-000 Filter Unit with/AC

1-1531-Q7-002 Duct Silencer

A-1531-57-567 Fire Damper

,

j

-

The connecting duct sections for

'the above items.

With regard to the inspection above, the inspector noted the following:

t

!

!

l'

_ . _ _ . _ _

_

_ _ _ _ - _

.

.

5

-

Gauge PDI-121378 measures pressure drop across the high-efficiency

particulate air (HEPA) filter only. The above is contrary to BPC P&ID

drawing AX4DB-206-3 Rev.10 and FSAR Figure 9.4.1-2 (sheet 3 of 3)

which require gauge PDI-121378 to measure the pressure drop across the HEPA

filter and the downstream cooling coil unit.

-

Gauge PDI-121370 measures pressure drop across the entire 1-1531-N7-002-000

filter unit except for the downstream cooling coil unit. The above is

contrary to BPC P&ID drawing AK4DB-206-3, Rev.10, FSAR Figure 9.4.1-2

(sheet 3 of 3) and FSAR Table 6.4.6-1 which require gauge PDI-121370

to measure pressure drop across the total filter unit including the

cooling coils unit.

-

Several pressure taps, intended to measure differential pressure across

HEPA filters, had the low pressure tap located inside the HEPA filter

rack support assembly, and not down stream of the filter assembly as

shown in BPC P&ID drawing AX408-206-3, Rev. 10 and FSAR Figure 9.4.1-2

(sheet 3 of 3).

-

Several Pitot Tubes were pointed down stream with the tube opening way

from the oncoming air flow. The above is contrary to the design

function of Pitot tubes.

The inspector discussed the above with the licensee who documented the same in

Deviation Report Control No. PK-2392.

The above are clear examples of failure to perform activities affecting quality

in accordance with drawings, which is in violation of Title Ten Code of Federal

Regulations Part 50, Appendix B, criterion V. This violation will be identified

as 424/85-23-02: " Failure to Install Pressure Taps in Accordance With the FSAR

and P&ID".

Within the areas examined, no violations .or deviations were identified

except as noted above.

7. Licensee Identified Items (92700B) (Units 1 and 2)

a. (Closed) Item 424,425 CDR 84-55: "HVAC Duct Support Weld Discrepancies"

This item was reported to Region II by the licensee in a letter dated

March 2, 1984. It involves weld discrepancies detected in HVAC duct

supports. The licensee has utilized MIL STD 105D sampling in their

evaluation. The resident inspector questioned the applicability of MIL

STD 105D to the items and conditions being evaluated.

From a list of 3635 installed and inspected HVAC duct supports, BPC the

Vogtle architect-engineer, randomly selected a statistical sample of 60

supports to satisfy a 95/95. confidence level of support integrity.

This sample was used in a comprehensive visual reinspection program,

using the acceptance criteria of Appendix VC to the HVAC specification

(X4AJ01), to identify clearly and accurately all weld indications on

ecch discrete weld of each support in the sample.

.

. . . ,

.

.

f

6

4

-

The GPC Construction Department submitted the results of the

reinspection program to BPC on June 21, 1984. BPC conducted an

independent determination of the equivalent available as-built weld for

each reinspected weld with indications, and a verification that

adequate. design margin exists between the required weld strength by

design and the available as-built strength.

This inspector examined the statistically unbiased sample, reviewed the

calculations performed by BPC, and had discussions with licensee and

BPC representatives. Based on this inspection, it appears that the

sampling and reinspection adequately represent the HVAC support

population, and that the calculations support the GPC contention that

the supports are adequate for their intended service. The question of

reportability under 10 CFR 50.55(e) is discussed in NRC Report 424,

425/85-22.

8. IE Bulletin (IEB) (927038) (Units 1 and 2)

a. (0 pen) IEB No. 80-08: " Examination of Containment Liner Penetration

Welds", Units 1 and 2

The inspector has reviewed GPC's letter of. June 26, 1980, and deter-

mined that the requested actions of the Bulletin have been acceptably

addressed. The inspector held discussions with responsible engineers,

reviewed supporting documentation and observed representative samples

of work to verify that the actions identified in the letter of response

have been completed. The inspector selected a sample of penetrations

for radiographic film review. The sample is indicated below. The

inspector reviewed the radiographis of the joints welded by Pullman

Power Products (PPP) and Chicago Bridge and Iron (CB&I); however, the

vendor welded intermediate sleve butt weld radiographs were not

available at the time of this inspection. This matter remains open

pending NRC review of the above indicated radiographs.

Butt Welded

Penetration Intermediate

Unit No. No. & Type Sleve Organization

'

1 3-I No PPP

1 - 15 - II tes PPP

2 23 - I No CB&I

2 24 - II Yes CB&I

1 67A - III Yes PPP

2 678 - III Yes CB&I

b. (Closed) IEB No. 83-06: - Nonconforming

"

Materials Supplied by Tube-Line

Corp", Units 1 and 2

The inspector has reviewed GPC's letters of November 23, 1983,

March 22, 1984, January 14, 1985, February 12, 1985, and May 31, 1985,

and determined that the requested actions of the Bulletin have been

-

- - - , , . -, -- .. . -

..-

.

..

7

acceptably addres' sed. The inspector held discussions with responsible

engineers, reviewed supporting documentation and observed representa-

tive samples of work to verify that the actions identified in the

letters of response have been completed.

c. (Closed) IEB No. 83-07: " Apparent 1y' Fraudulent Products Sold by Ray

Miller Inc.." Units 1 and 2

The inspector has reviewed GPC's letters of March 12, 1984 CJne 26,

1984 July 5,1984, and February 12, 1985, and determined that the

requested actions of the Bulletin have been acceptably addressed. The

inspector held discussions with responsible engineers, reviewed

supporting documentation and' observed representative samples of work to

verify that the letters of response have been completed.