05000315/LER-1985-021, :on 850429,reactor Vessel Flow Requirement Not Verified Prior to RCS Boron Dilution.Procedure for Filling Reactor Refueling Cavity Revised to Include Verification/ Documentation of Reactor Vessel Flow During RCS Dilution

From kanterella
(Redirected from ML20129E692)
Jump to navigation Jump to search
:on 850429,reactor Vessel Flow Requirement Not Verified Prior to RCS Boron Dilution.Procedure for Filling Reactor Refueling Cavity Revised to Include Verification/ Documentation of Reactor Vessel Flow During RCS Dilution
ML20129E692
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/24/1985
From: Baker K
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML20129E666 List:
References
LER-85-021, LER-85-21, NUDOCS 8506060565
Download: ML20129E692 (1)


LER-1985-021, on 850429,reactor Vessel Flow Requirement Not Verified Prior to RCS Boron Dilution.Procedure for Filling Reactor Refueling Cavity Revised to Include Verification/ Documentation of Reactor Vessel Flow During RCS Dilution
Event date:
Report date:
3151985021R00 - NRC Website

text

_

U S. NUCLE AR REGULATORY CCJ--

)

Pere 338 ArPROvE3 ous NO sino-gios 1

LICENSEE EVENT REPORT (LER)

P ACILITV NAA8E HI DOCKET NUMSER (2)

PAGE(31 D. C. COOK, UNIT ONE o is l 0 t o I o 131115 1 l0Fl 011 TITLE (48 REACTOR COOLANT SYSTEM BORON DILUTION EVENT DATE (58 LER NUMSER 466 REPORT DATE 17)

OTHER FACILITIES INVOLVED 181 MONTM DAY YEAR TEAR SEjy UONTM OAv YEAR P AC8L'Tv NawES DOCKET NuueERISI O15l010!0 1 I I 0l 4 2l 9 85 8l 5 0l 2l 1 0l0 0l 5 2l 4 8l 5 0 1 5 i 0 to1 0 I i TMis RE, ORT is su uiTuD rumsuANT TO TMi R OUiREutNu O, i0 C,R t re..ae., e,e., rae,eue

,, nH

== m '

6

==m 20 0.m

.0 naHm.

n.> i m 20 40slaHHhl 80 3steHH 80.73faH2Hvi 73.711el R

01010 20 0.<.HiHa

=,-g,;.g am.Hn eo.ni.H2H.e 0 03

]

20.40GleH1Hdd

$0.73(aH2H4 80.73ts H2HvdsHAl J66AJ 20 40HsH1Hivl 80 7SteH2Hul 50.73 eH2HvH6Hgl 20.4051 sit 1Hvi 80.73teH210ul to.73teH2H d LICENSEE CON *ACT FOR THIS LER E121 NIME TELEPHONE NUM8ER AmtACODE K. R. BAKER - OPERATIONS SUPERINTENDENT 611 16 416151-15191011 COMPLETE ONE LINE FOR E ACM COMPONENT F AILURE DESCRIBED IN THIS REPORT (139 Onta Lt PRokE wANhC.

m{g CAU$E SYSitw COMPONENT

CAUSE

Systiu COMPONENT s

g pn g E

O i

I I I I I I I

I I I I I I l

l I l i I I I

I I I I l I SUPPLEMENTAL REPORT EXPECTED (141 MONTH DAY YEAR YES !!, yes cornooere EX9ECTRO $vgut$510h DATfl NO l

l l

AS$TR ACT finns <f to F400 spaces e e saare.eere<y wreen snap e space tweewretrea haess (16e ON APRIL 29,1985, AT 0422 HOURS WITH TIE UNIT IN MODE 6 (REFUELING), TIE CONTROL ROOM OPERATOR TRANSFERRED WATER FROM TIE REFUELING WATER STORAGE TANK (RWST) TO THE REACTOR COOLANT SYSTEM (RCS). TIE RCS BORON CONCENTRATION WAS 2084 PPM WHILE TIE RWST BORON CONCENTRATION WAS 2069 PPM.

LITERAL INTERPRETATION CONCLUDES THAT THIS IS A DILUTION OF TIE RCS. THE REACTOR VESSEL FLOW REQUIREMENT, SPECIFIED IN TECHNICAL SPECIFICATION 3.I.I.3, WAS NOT VERIFIED PRIOR TO TIE DILUTION.

TIE ACTION STATEMENT REQUIRES IMMEDIATE SUSPENSION OF ALL BORON CONCENTRATION REDUCTION ACTIVITIES. THE DILUTION WAS INITIALLY IDENTIFIED BY TIE NRC RESIDENT INSPECTOR ON MAY I, 1985. CONSEQUENTLY, TIE ACTION STATEMENT REQUIREMENTS WERE NOT MET.

THERE WERE NO ADVERSE SAFETY CONSEQUENCES DUE TO THIS INCIDENT. TECHNICAL SPECIFICATION 3.9.I REQUIRES A BORON CONCENTRATION OF > 2000 PPM FOR ADEQUATE SHUTDOWN MARGIN. THIS REQUIREMENT WAS SATISFIED THROUGHOUT TIE EVENT.

TO PREVENT RECURRENCE, THE PROCEDURE FOR FILLING THE REACTOR REFUELING CAVITY HAS BEEN REVISED TO INCLUDE VERIFICATION / DOCUMENTATION OF THE REACTOR VESSEL FLOW IN TIE EVENT A RCS DILUTION OCCURS.

8506060565 850524 8'DR ADOCK 05000315 S

PDR t,".c,*

i