LDUTING C0tOITIONS POR OPERATION SURVEIIIANCE REQUIRENENTS
' 4.5.D.1.b Normal Operational Tests -
The FFCI pumps shall deliver at least 4250 gpm during each flow rate test.
- d. Pump Operability Once/ Month 3.5.D.2 Operation with Inoperable Components
- e. Motor Operated ~
Once/ Month l
Valve If the HPCI system is inoperable, Operability the reactor may remain in operation for a period not to exceed fourteen (14) days provided the ADS, CS system, RM system LPCI mode, and RCIC system are operable.
- 2. Surveillance with Inoperable Components With the surveillance requirements of'
-Specification 4.5.D.1 not performed.
'When the HPCI system is inoperable,
-at the required frequencies due to the ADS actuation logic, the RCIC
. low reactor steam pressure, reactor system, the RHR system LPCI mode, startup is permitted and the and the CS system shall be appropriate surveillance will be demonstrated to be operable performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after immediately. The RCIC system and ADS reactor, steam pressure is logic shall be demonstrated to be adequate to perform the tests.
operable daily thereafter until the FPCI. system is returned to normal
-3.~ Shutdown Requirements operation.
If Specification 3.5.D.l. or 3.5.D.2 cannot be met, an orderly shutdown shall be initiated and the reactor vessel pressure shall be reduced to 150 psig or.less within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.-
E.-Reactor Core Isolation Cooling (RCIC)
E. Reactor Core Isolation Cooling System (RCIC System) 1.
Normal System Availability 1..
Normal Operational Tests L
a.
The RCIC system shall be RCIC system: testing shall.be per-
[
operable with an operable formed as ' follows:
flow path capable of (auto-metically)'taking suction Item Frequency-from the suppression pool and transferring the water
- a. Simulated Once/ Operating i..
to the reactor pressure Automatic Cycle vessel:
Actuation (and restart *)
(1) Prior to reactor startup Test from a cold condition, or-i.
- Autmatic Restart on a'Im Water Ievel Which is Subsequent to a
[