ML20129B762

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Change to Table 3.3-5,Page 3/4 3-17 Re ESF Response Times
ML20129B762
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/28/1985
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20129B754 List:
References
NUDOCS 8507150590
Download: ML20129B762 (1)


Text

..,,

TABLE 3.3-5 ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS

  • 1.

Manual a.

High Pressure Injection Not Applicable b.

Low Pressure Injection Not Applicable c.

Reactor Building Cooling Not Applicable d.

Reactor Building Isolation Not Applicable e.

Reactor Building Spray Not Applicable f.

Reactor Building Purge Isolation Not Applicable g.

MFW and MSL 1 solation 1.

Emergency Feedwater Actuation Not Applicable 2.

Feedwater Isolation Not Applicable 3.-

Steam Line Isolation Not Applicable h.

Emergency Feedwater Actuation Not Applicable l

2.

Reactor Building Pressure-High a.

High Pressure Injection 25*

b.

Low Pressure Injection 25*

c.

Reactor Building Cooling 25*

d.

Reactor Building Isolation 60*

3.

Reactor Building Pressure High-High (with HPI signal) a.

Reactor Building Spray 56 4.

RCS Pressure Low a.

High Pressure Injection 25*

b.

HPI Isolation 60*

5.

RCS Pressure Low-Low a.

High Pressure Injection 25*

b.

Low Pressure Injection 25*

6.

Low Steam Generator Pressure a.

Feedwater Isolation 34 b.

Steam Line Isolation 5

c.

Emergency Feedwater Actuation Not Applicable CRYSTAL RIVER - UNIT 3 3/4 3-17 8507150590 850628 PDR ADOCK 05000302 P

PDR

..-.,_