OPERATIN6 DATA REPORT DDCKET ND 50-413 DATE 5esteater 13. 1996 Q @ TING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346
- 1. Unit Nases Catawba 1
- 2. Reporting Period: August 1, 1996-August 31,1996
- 3. Licensed Thereal Power (Mtle 3411 i
- 4. Naseplate Rating (6tess Mh l:
1305e Notes eNaseplate Rating
- 5. Design Electrical Rating (Net Mel:
!!45 (Gross Mel calculated as
- 6. Maileue Dependable Capacity (6 toss Mel:
!!92 1450.000 MVA
.90 power
- 7. Maileue Dependable Capacity (Net Me):
1129 factor per Fage ill, S. If Changes Occur in Capacity Ratings (!tres Number 3 Through 7) Since Last NURE6-0020.
)
Report. Give Reasons i
h
- 9. Poser Level To Which Restricted, if Any (k t M el:
- 10. Reason For Restrictions, If any:
I I
This Month Yr.-to-Date Cueulative
- 11. Hours in Reporting Period 744.0 5855.0 97968.0
- 12. Nueber Of Hours Reactor Was Critical 0.0 3812.7 76106.4
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Heurs Generator On-Line 0.0 3773.8 74962.5
- 15. Unit Reserve Shutdown Hours
--0--
- --0 ~
l
- 16. Gross therstl Energy Generated ( MHl-0 12337402 244287661
- 17. Gross Electrical Energy Generated ( WH1 0
4420713 96323524
- 18. Net Electrical Energy Generated ( MHI
-6526 4165324 01210413
- 17. Unit Service Fa: tor 0.0 64.5 76.4 20.UnitAvailabilityFactor 0.0 64.5-76.4
- 21. Unit Capacity Factor (Using MDC Net) 0.0 63.0 73.2 j
- 22. Unit Capacity Factor (using DER Net) 0.0 62.1 72.4 l
- 23. Unit Forced Outage Rate 0.0 4.1 8.0 l
- 20. Shutdown Scheduled Over Nest 6 Months (Type, Date, and Duration of Eachl:
j Currently Refueling and Steam Generator Replacement Outage
- 23. If Shut Down At End Of Report Period. Estiaated Este of Startup: September 28, 1996 4
- 24. Units in Test Status (Prior to Coseercial Operationi:
Forecast Achieved 1
INiilhLCRITICALITY INITIAL ELECTRICITY 2
. COMERCIAL DPERATIDW i
)
9609180328 960913 PDR ADOCK 05000413 R
OPERAi!hG DATA REPCRT l
j DOCKET ND 50-413 (lNIT Catamba 1 DATE September 13, 1996 COMPLETED EV R.A. Willians TELEP;10NE 704-3B2-5346 MONTH Aucust. 1996 E
AVERA6E DAILY i 3ER LlVEL M
AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
6 0
20 0
5 0
21 0
s 6
0 22 0
7 0
23 0
0 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME tarantsa 1 DATE v y /1.s / 9 6 REPORT MONTH August 1996-COMPLETED BY
- x. A _. williams TELEPHONE t / u e ;
_s es z - d.s e 6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE 4
N Y
S SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 3
96 1 S
744.00 C
RC FUELXX END-OF-CYCLE 09 REFUELING OUTAGE AND MAINTENACE r
i (1)
(2)
(3)
(4)
F Ferrad Reason-Method:
Exhibit G - Instructions S Schedtded A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent U Sheets For Licensee !
C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulato n Restriction 4-Other (Explain)
File ( M G-0161) i E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
G-Operator Error Exhibit I - Same Source H-Other
= _..
..~
i i
l DOCKET: 50-413 UNIT: Catawba 1 Date: 09/13/96 NARRATIVE
SUMMARY
MONTH: August,19%
Catawba Unit I began the month of August in end-of-cycle 09 refueling and maintenance outage which includes steam generator replacement work. The unit remained in the outage the entire month.
l
)
1 1
I Prepared by: R. A. Williams Telephone: (704).382 5346 I
l l
MONTHLY REFUELING INFORMATION REOUEST i
l.
Facility name:
Catawba. Unit 1 2.
Scheduled next refueling shutdown: Currentiv Refuciina 3.
Scheduled restart following refueling: September 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 i
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
i 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
]
7.
Number of Fuel assemblies (a) in the core:.L93 (b) in the spent fuel pool: 632 3
I 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
9.
Projected date oflast refueling which can be accommodated by present license capacity:
September 2009 DUKE POWER COMPANY DATE: Scotember 13.1996 Name of
Contact:
R. A. Williams Phone: (704)-382-5346 I
I 1
I f
1 d
r r-mv.
c
= -. -
.. ~
l.
i I
OPERATIN6 DATA REPORT l
l DOCKET NO 50-414 4
BATE Sentenber 13. 1996 i
OPERAi!N6 STATUS -
COMPLETED Bf R.A. Willians-
.l t
TELEPHONE 704-382-5346 l
}
- 1. Unit Names Catawba 2 j
- 2. Reporting Period: August 1, 1996-August 31,1996
)
- 3. Licensed Thereal Power (MWt):
3411 l
C. Naeeplate Rating (Stoss MWe):
1305e~
..es fNaseplate Rating S. Design Electrical Rating (Net MWel
!!45 (Bross MWel calculated as
- 6. Marleue Dependable Capacity (Gress MWel 1192 1450.000 MVA x.90 power l
factor per Page iii,
- 7. Manisue Dependable Capacity (Net MWel:
!!29 NURES-0020.
S. If Changes Occur in Capacity Ratings (Itees Neeber 3 TM ough 71 Since Last j
Report. Give Reasons:
i l
l
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, If any:
3 l
~
ii This Month Yr.-to-Date Cumulative i
1 3
i
- 11. Hours In Reporting Period 744.0 5855.0 B7984.0 l
- 12. Nueber Of Hours Reactor Was Critical 539.4 5407.8 69573.9 i
- 13. Reactor Reserve Shutdown Hours
--0--
--0-- -
- 10. Hours Generator On-Line' 523.9 5353.9 68491.6
[
- 15. Unit Reserve Shutdown Hours
- --0--
--0--
- 16. Gross Thereal Energy Generated (MWH) 1705968 17998500 221415046
- 17. Eross Electrical Energy Generated (MWH) 601515 6422776 78527143 j
- 18. Net Electrical Energy Generated (MWHI 559025 6081810 73994067 l
- 19. Unit Service factor 70.4 91.4 77.9 l
- 20. Unit Availability factor 70.4 91.4 77.8 i
- 21. Unit Capatity fatter (Using MDC Net) 66.6 92.0 74.3 i
- 22. Unit Capacity facter (Using DER Net) 65.6 90.7 73.5 l
- 23. Unit Forced Outage Rate 29.6 B.6 B.9
- 24. Shutdoen Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None j
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- i
- 26. Units In Test Status (Prior to Ceseercial Operation):
Forecast Achieved 1
?
INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION a
~
OPERATING DATA REPORI DOCVET NO 50-414 UNIT Catauba 2 DATE Srstenber 13. 1996 COMPLETED By R.A. Williass TELEPHONE 704-382-5346 P.ON TH Auoust. 1996 Q,Al AVERAGE DAILY POWER LEVEL M1 AVERABE DAILY F0WER LEVEL (NWe-Met)
(NWe-Net) 1 1147 17
!!44 2
!!47 16 1144 3
142 19
!!43 6
0 20 1143 5
0 21
!!43 4
0 22 1143 7
0 23
!!42 8
0 24 1144 9
0 25 1145 10 0
26 1144 0
27 1143 12 221 28 1145 13 649 29
!!45 14 904 30 1116 13 1138 31 1147 16 1144
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME tawaw4A d f
DATE vy/13/ye REPORT MONTH August 1996 COMPLETED BY
- x. A _. williams TELEPHONE t/uei-Juz-dsee (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 2
96 3 F
220.15 A
1 AA INSTRU CONTROL ROOM VENTILATION INOPERABLE 5-P 96-8-12 F
A CH PIPEXX VERIFICATION OF ACCEPTABLE FEEDWATER LINE TEMPERATURE 6-P 96-8-12 F
A HH PUMPXX "2B" FEEDWATER PUMP PROBLEMS 7-P 96-8-14 S
B HB VALVEX MAIN TURBINE CONTROL VALVE MOVEMENT TESTING (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entnr Sheets For Licensee '
C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other h
... - =. - - _. - -
t DOCKET: 50-414 UNIT: Catawba 2 Date: 09/13/96 NARRATIVE
SUMMARY
MONTil: August,'19%
Catawba Unit 2 began the month of August operating at 100% full power. The unit operated at or near 100% full power until 08/03/96 at 0200. when the unit began decreasing power and was removed from service at 0604 due to control room ventilation system inoperable (Tech. Spec. 3.0.3). The unit was placed on-line 08/12/96 at 1013. During power escalation, the unit held at 15% power from 1115 to 1215 for verification of acceptable feedwater line temperature. The unit held at 61% power from 1822 to 08/14/96 at 0612 due to "2B" feedwater pump problems. On 08/14/96 from 1007 to 1020 the unit held at 83% power due to main turbine control valve movement testing. The unit returned to 100% power on 08/14/96 at 1746, and operated at or near 100% full power the remainder of the month.
Prepared by: R. A. Williams Telephone: (704)- 382-5346
t MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
Catawba. Unit 2 2.
Scheduled next refueling shutdown: March 1997 3.
Scheduled restart following refueling: April 1997 T11E PROJECT MANAGER 11AS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. Cl{ANGE OR LICENSE AMENDMENT. T11EREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or I
other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: L1 (b) in the spent fuel pool: 124 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
9.
Projected date of last refueling which can be accommodated by present license capacity:
September 2011 DUKE POWER COMPANY DATE: September 13.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 i
a y
r.-
m
- ~ -
o y