Document Control Desk
'f ATTACHMENT A
)
Revised October 1992 i
j Operating Status SONGS Unit 1. Monthly Operating Report mor.jan/8 9302220025 930216 PDR ADOCK:05000206 l -
R PDR L
- u..
Document Control Desk
- Revised Data in bold.***
NRC HONTHLY OPERATING REPORT DOCKET N0: _J0-206 UNIT NAME:
SONGS - 1 DATE:
2/16/93 COMPLETED BY:-
J. L. Darlina TELEPHONE:,J714) 368-6223 OPERATING STATUS i
1.
Unit Name: _ San Onofre Nuclear.Generatina StatioD. Unit 1 2.
Reporting Period: _
Octolwr_1992 3.
Licensed Thermal Power (MWt)-
1347-4.
Nameplate Rating (Gross MWe):
456 5.
Design Electrical Rating (Net MWe):
436 6.
Maximum Dependable Capacity (Gross MWe): _ 456 r
7.
Maximum Dependable Capacity (Net MWe):
436 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe): _See Item IQ 10.
Reasons For Restrictions, If Any:
Power level reduction from full nower as a t
result of a self.jpposed reduced operatina temperature to retard Steam Generator tube corrosion rate, This Month Yr.-to-Date Cumulative
+
11.
Hours In Reporting Period 745.02 7 32LDR 217.701.00 12.
Number Of Hours Reactor Was Critical
/45.00 7.320.00 129.278.07 13.
Reactor Reserve Shutdown Hours 0.00 0.00 0.00 14.
Hours Generator On-Line 745.00-7.320.00 12L3_3L32 15.
Unit Reserve Shutdown Hours 0.00 Q.,_QD 0.QD, 16.
Gross Thermal Energy Generated (MWH) 919. 876. 43 - LDDLPJ5.a0 157. 190.102. 61 17.
Gross Electrical Energy Generated (MWH) ZE200.00 L.841.000 QD 52.685.944.00
-18.
Net Electrical Energy Generated (MWH) 269.987.00 2.678.215.0.Q 49.697.590.00-19.
Unit Service Factor 100.0Q) 100.00%
- 57. 5]fi 20.
Unit Availability Factor 100.00%.
100.00%
57.57%
21.
Unit Capacity Factor (Using MDC Net) 83.12.1 83.92%
52.3fi 22.
Unit Capacity Factor (Using DER Net) 83.12%
83 323 52.36%
.t 23.
Unit Forced Outage Rate 0.00% _
0.003 17.98%
24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
November 30. 1992 SONGS 1 will be permanentiv shutdown.
25.
If Shutdown At End-Of Report Period, Estimated Date of Startup:
26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA l
COMMERCIAL OPERATION NA NA j
mor.jan/9 l-g i
.