Revised Monthly Operating Rept for Oct 1992 for San Onofre Unit 1,consisting of Corrected Gross Thermal Energy Generated Values
ML20128L849
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/31/1992
From: Darling J
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20128L827 List:
References
NUDOCS 9302220025
Download: ML20128L849 (2)


Text

... . . .- . . . . . . - - . -_ . .

Document Control Desk

'f l

I ATTACHMENT A  ;

)

Revised October 1992 i j

Operating Status SONGS Unit 1. Monthly Operating Report mor.jan/8 9302220025 930216 l- PDR ADOCK:05000206 L R PDR

__ . . _ , . . _ . . . _ . _ . . _ , u. . .. _ ._

Document Control Desk

      • Revised Data in bold.***

NRC HONTHLY OPERATING REPORT DOCKET N0: _J0-206 UNIT NAME: SONGS - 1 DATE: 2/16/93 COMPLETED BY:- J. L. Darlina TELEPHONE: ,J714) 368-6223 OPERATING STATUS i

1. Unit Name: _ San Onofre Nuclear.Generatina StatioD. Unit 1 _
2. Reporting Period: _ Octolwr_1992
3. Licensed Thermal Power (MWt)- 1347-
4. Nameplate Rating (Gross MWe): . 456
5. Design Electrical Rating (Net MWe): 436
6. Maximum Dependable Capacity (Gross MWe): _ 456 r
7. Maximum Dependable Capacity (Net MWe): 436
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe): _See Item IQ .
10. Reasons For Restrictions, If Any: Power level reduction from full nower as a t result of a self.jpposed reduced operatina temperature to retard Steam Generator tube corrosion rate, This Month Yr.-to-Date Cumulative +
11. Hours In Reporting Period 745.02 7 32LDR 217.701.00
12. Number Of Hours Reactor Was Critical /45.00 7.320.00 129.278.07
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line . 745.00- 7.320.00 12L3_3L32
15. Unit Reserve Shutdown Hours 0.00 Q.,_QD 0.QD,
16. Gross Thermal Energy Generated (MWH) 919. 876. 43 - LDDLPJ5.a0 157. 190.102. 61
17. Gross Electrical Energy Generated (MWH) ZE200.00 L.841.000 QD 52.685.944.00

-18. Net Electrical Energy Generated (MWH) 269.987.00 2.678.215.0.Q 49.697.590.00-

19. Unit Service Factor 100.0Q) 100.00% 57. 5]fi
20. Unit Availability Factor 100.00%. 100.00% 57.57%
21. Unit Capacity Factor (Using MDC Net) 83.12.1 83.92% 52.3fi
22. Unit Capacity Factor (Using DER Net) 83.12% 83 323 52.36% .t
23. Unit Forced Outage Rate _ 0.00% _ 0.003 17.98%

24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

November 30. 1992 SONGS 1 will be permanentiv shutdown.

25. If Shutdown At End-Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA l

INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA j mor.jan/9 l-g i

.