Revised Monthly Operating Rept for Oct 1992 for San Onofre Unit 1,consisting of Corrected Gross Thermal Energy Generated Values
ML20128L849
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/31/1992
From: Darling J
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20128L827 List:
References
NUDOCS 9302220025
Download: ML20128L849 (2)


Text

...

Document Control Desk

'f ATTACHMENT A

)

Revised October 1992 i

j Operating Status SONGS Unit 1. Monthly Operating Report mor.jan/8 9302220025 930216 PDR ADOCK:05000206 l -

R PDR L

u..

Document Control Desk

      • Revised Data in bold.***

NRC HONTHLY OPERATING REPORT DOCKET N0: _J0-206 UNIT NAME:

SONGS - 1 DATE:

2/16/93 COMPLETED BY:-

J. L. Darlina TELEPHONE:,J714) 368-6223 OPERATING STATUS i

1.

Unit Name: _ San Onofre Nuclear.Generatina StatioD. Unit 1 2.

Reporting Period: _

Octolwr_1992 3.

Licensed Thermal Power (MWt)-

1347-4.

Nameplate Rating (Gross MWe):

456 5.

Design Electrical Rating (Net MWe):

436 6.

Maximum Dependable Capacity (Gross MWe): _ 456 r

7.

Maximum Dependable Capacity (Net MWe):

436 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe): _See Item IQ 10.

Reasons For Restrictions, If Any:

Power level reduction from full nower as a t

result of a self.jpposed reduced operatina temperature to retard Steam Generator tube corrosion rate, This Month Yr.-to-Date Cumulative

+

11.

Hours In Reporting Period 745.02 7 32LDR 217.701.00 12.

Number Of Hours Reactor Was Critical

/45.00 7.320.00 129.278.07 13.

Reactor Reserve Shutdown Hours 0.00 0.00 0.00 14.

Hours Generator On-Line 745.00-7.320.00 12L3_3L32 15.

Unit Reserve Shutdown Hours 0.00 Q.,_QD 0.QD, 16.

Gross Thermal Energy Generated (MWH) 919. 876. 43 - LDDLPJ5.a0 157. 190.102. 61 17.

Gross Electrical Energy Generated (MWH) ZE200.00 L.841.000 QD 52.685.944.00

-18.

Net Electrical Energy Generated (MWH) 269.987.00 2.678.215.0.Q 49.697.590.00-19.

Unit Service Factor 100.0Q) 100.00%

57. 5]fi 20.

Unit Availability Factor 100.00%.

100.00%

57.57%

21.

Unit Capacity Factor (Using MDC Net) 83.12.1 83.92%

52.3fi 22.

Unit Capacity Factor (Using DER Net) 83.12%

83 323 52.36%

.t 23.

Unit Forced Outage Rate 0.00% _

0.003 17.98%

24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

November 30. 1992 SONGS 1 will be permanentiv shutdown.

25.

If Shutdown At End-Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA l

COMMERCIAL OPERATION NA NA j

mor.jan/9 l-g i

.