ML20128L824
| ML20128L824 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 02/16/1993 |
| From: | Marsh W SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20128L827 | List: |
| References | |
| NUDOCS 9302220020 | |
| Download: ML20128L824 (1) | |
Text
^
W 1.-
o a nr :7
,y w~~
Southem Califomia Edison Company 23 PAHM(' $4 blFtf F T ifIVIN fo C AL W OHNI A 977181 W AL. T E N C MAHRH t t i t.Wetwr
,,nd.ZZITU,7.E.....
February 16, 1993 4"mu em U.
S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Subject Docket No. 50-206 Monthly Operating Report for January 1993 San Onofre Nuclear Generating Station, Unit 1 Technical Specification 6.9.1.10 to Facility Operating License DPR-13 for the San-Onofre Nuclear Generating Station, Unit 1, requires SCE to provide a Monthly Operating Report which includes routine operating statistics, shutdown experience, Land-all challenges to pressurizer safety and relief valves.
This letter transmits the January 1993 Monthly Operating Report for Unit 1.
There were no challenges to pressurizer safety or relief valves during this reporting period.
Attachment A to the Enclosure provideo a revised " Operating Status" sheet for the October Monthly operating report to correct the Gross Thermal Energy Generated values, which were initially reported incorrectly.-
If you require any additional information, please let me know.
Sincerely,.
ll Y 1
Enclosure cc:
J.
B. Martin. Regional Administrator, NRC Region V J..O.
Bradfute, NRC Project Manager, San Onofts Unit 1=
C.
W.
Caldwell,-NRC Senior Recident Inspector, Units-1,2 & --- 3 j
R.
F.
Dudley, Section Chief, Non-Power, Decommissioning,'and' Environmental Project, Directorate of Reactor Projects-3, 4 &5 bcc: (See attachad sheet)
[
220004 1
9302220020 930216
- ~ "/
- l PDR.ADOCK 05000206 o
R PDR 1
-