February 21, 1985
Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Executive Vice President
Power Supply and Engineering
and Construction
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
SUBJECT:
REPORT NOS. 50-324/84-39 AND 50-325/84-39
On December 10 - 14, 1984, NRC inspected activities authorized by NRC Operating
License Nos. DPR-62 and DPR-71 for your Brunswick Steam Electric Plant. At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspectia report.
Areas examined during the inspection are identified in the report. Within these
areas, the. inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
In addition to the need for corrective action regarding the specific matters
identified in the enclosed' Notices, we are concerned about the implementation of
-your management control systems that permitted the output plug -1 controller
E11-SS-F605A to be placed in the HI jack. Consequently, your response should
include those particular actions taken or planned to improve the effectiveness of
your program.
In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures, and
your reply will be placed in NRC's Public Document Room upon completion of our
evaluation of the reply.
If you wish to withhold information contained therein,
please notify this office by telephone and include a written application to
withhold infonnation in your response.
Such application must be consistent with
the requirements of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
,
k
g2j
850221
G
05000324
LEol y
s
f
- -g
.
Caro?ina Power and Light
2
February 21, 1985
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Roger D. Walker
Roger D. Walker, Acting Director
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report Nos. 50-324/84-39
and 50-325/84-39
cc w/encis:
P. W. Howe, Vice President
Brunswick Nuclear Project
C. R. Dietz, Plant General Manager
bec w/encls:
Document Control Desk
State of North Carolina
NRC Resident Inspector
RII
RII}
RII
RII
RII
W
er:es
CA
n
AFGi
n
PRBemi
A
din
02/[ y 5
02//f85
02/$/85
02/;g/85
02/gy/85
RII -
RII ,
N r)edrickson-
y
.
,
PF
DMVerrelli
02/O/85
02/o /85
. -
-
-
-
-