Notice of Violation from Insp on 841210-14
ML20128L798
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/21/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20128L790 List:
References
50-324-84-39, NUDOCS 8507250115
Download: ML20128L798 (1)


Text

r-ENCLOSURE 1 NOTICE OF VIOLATION Carolina Power and Light Docket No. 50-324 Brunswick Steam Electric Plant License No. DPR-62 The following violation was identified during an inspection conducted on December 10 - 14, 1984. The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

Technical Specification 6.8.1.a requires written procedures be implemented covering procedures recommended in Appendix A of Regulatory Guide 1.33, November 1972. Item A.4 of Appendix A requires procedures be established for procedure adherence and temporary change method.

Section 4.1 of 01-01, Operating Principles and Philosophy, states that procedure compliance is mandatory.

Section 4.3.1.3 of 01-01 states that an operator may omit a step only if the step is applicable under a given condition as described in the step and is determined to be inapplicable by the operator, or if only a given portion of a procedure is required to be completed (i.e., performance of only a portion of a periodic test is required to satisfy a given PMTR).

Contrary to the above, the licensee failed to implement procedure 01-01, in that while performing Section 5 of OP-17, Residual Heat Removal System Operating Procedure, on November 27 - 28, 1984, a water sample was not ootained from the RHR system to verify that the conductivity of the RHR system was less than 10 umho/cm as required by steps 17 and 41.

This is a Severity Level IV violation (Supplement I).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of tne alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Security aor safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

Date: Fohruary 21. 1985 B507250115 850221 PDR ADOCK 05000324 G PDR