ML20128K842

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/85-20 & 50-364/85-20 on 850402-0510 & Notice of Violation
ML20128K842
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/10/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20128K846 List:
References
NUDOCS 8507110138
Download: ML20128K842 (2)


See also: IR 05000348/1985020

Text

_

'

, le

. .

.

_

JUN 10 E85

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/85-20 AND 50-364/85-20

On April 2 - May 10,1985, NRC inspected activities authorized by NRC Operating

License Nos. NPF-2 and NPF-8 for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff identi-

fied in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

Your atteation is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

f.@ N

Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. Inspection Report Nos. 50-348/85-20

and 50-364/85-20

cc w/encls: (See page 2)

\\

8507110138 850610'

PDR

G

ADOCK 05000348

PER [O '

'

.

.

4

Alabama Power Company 2

cc w/encls:

W. O. Whitt, Executive Vice President

J. D. Woodard, Plant Manager

W. G. Hairston, III, Manager, Nuclear Engineering -

and Technical Support w

J. W. McGowan, Manager-Safety Audit

and Engineering Review

H. O. Thrash, Manager, Nuclear Operations .

and Administration -

W. G. Ware, Supervisor-Safety Audit

and Engineering Review

bec w/encls:

NRC Resident Inspector

E. Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

.

.

l

i

!

!

RII s. RII RII

  1. NBf 7" O

,

FCantrell DVerrelli

l%.hWgeWRutand:cdg

06///85 06/j/85 06h /85

)

!

e