Rev 3 to Procedure PSO 28, Operating Experience Feedback
ML20128G909
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/13/1984
From:
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20128G886 List:
References
PSO-28, NUDOCS 8507090353
Download: ML20128G909 (20)


Text

,

ATTACHMENT 3 TO JPN-85-55 Plant Standing Order 28 Operatine Experience Review New York Power Authority James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 i

8507090353 850702 PDR ADOCK 05000333 P

pop t

NEW YORK POWER AUTHORITY

?

JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PS0 #28 REVIEWED BY:

Plant Operations Review Committee

'O Meeting No.

Date d

/f Date Y /d APPROVED BY:

RESIDENT MANAGER Page No.

1 2

3 4

5 6

7 8

9 10 11 12 13 14 Rev. No.

3 3

2 2

2 3

3 3

3 3

3 3

3 3

Page No.

15 16 17 18 19 Rev. No.

3 3

3 3

3

~

g ]~ L--~J Q~~

9 w X f qjl

%)

2 2 L%-"

/

Rev. No.

3 f

Date 9/13/84 Page 1

of 19

)

t.

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PS0 #28 1.0 PURPOSE To describe the procedure by which internally and externally generated operating experience is evaluated, reviewed, and if necessary, incorporated into plant procedures or design changes.

2.0* APPLICABILITY

~

This procedure applies to sources o f operating experience listed in paragraph 4.0.

3.0 REFERENCES

3.1 NUREG-0737, Clarification of TMI Action Plan Require-ments 3.2 WACP 10.1.9, latest revision, Control of Incoming, Outgoing and Internal Documents 3.3 INPO 82-003, Significant Event Evaluation and Informa-tion Network Program Description 3.4 Administrative Procedure 8.2, latest revision, Re-porting Variations from Normal Plant Operations and 10CFR21 Requirements 3.5 NuAP 2.10, latest revision, Corrective Action Control 3.6 NuAP 3.2, latest revision, NRC Bulletins, Circulars and Information Notices 3.7 AP 1.5, latest

revision, Procedure for Rules of Practice 4.0 DEFINITIONS 4.1 NRC and Industry Operating Experience Documents 4.1.1 Nuclear Regulatory Commission (NRC) Generated

^

a.

NRCB - NRC I&E Bulletin No.00-000 b.

NRCC - NRC Circular No.00-000 c.

NRCN - NRC Information Notice No.

t

~~

00-000 d.

NRCG - NRC Generic Letter No.00-000 Rev. No.

2 Date 10/25/83 Page 2

of 19

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PS0 #28 4.1.2 Industry Generated Operating Experience a.

SOER - INP0/NSAC Significant Operating Experience Reports b.

SER -

INP0/NSAC Significant Event Reports c.

SIL -

General Electric Service Informa-tion Letter d.

TIL -

General Electric Technical -

Information Letter e.

10CFR21 - Vendor 10CFR21 Reports / Notices 4.2 INPO Operating Experience Documents a.

INPO O&MR - INP0/NSAC Operations and Maintenance Reminders b.

INPO Network - INPO Operating Experience Exchange j

4.3 Internal (JAF) Operating Experience Documents a.

OR - Plant originated Occurrence Report LER - Plant originated Licensee Event Reports NPRDS - Nuclear Plant Reliability Data System Reports.

4.4 OER Form - Operating Experience Review Form Signifies the Resident 4.5 Resident Manager's Office Manager or designee 4.6 PPRS - Plant Performance & Reliability Supervisor Refers to a change in a procedure, in a 4.7 Action training program, or a plant modification, required to be initiated as a result of operating experience review 4.8 Responsible Individual (RI) - Person assigned respon-sibility for determining plant applicability, making recommendations and submitting OER forms to the appropriate Department Superintendent (s). In 'some cases

~

the responsible individual may be the Department

/

Superintendent.

/

+-

,sw,

.me

.t Rev. No.

3 Date 9/13/84 Page 3

of 19

}

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PS0 #28 5.0 RESPONSIBILITIES 5.1 Department Superintendents, subject to Superintendent of Power review, are responsible for the final deter-mination of applicability and the subsequent trans-lation of recommendations into plant actions.

The Department Superintendents shall initiate procedure changes, operating instructions, training, preparation of NRC response letters, etc., as required.

5.2 The Manager of Operational Evaluation shall audit this procedure, thereby initiating a routine evaluation to review the program effectiveness.

5.3 The PPRS is responsible for:

a)

Initial review of operating experience for applicability.

b)

Assignment of individuals for operating experience review.

c)

Tracking operating experience until final action completion.

A hard copy file (maintained by a member of the PPRS staff) shall contain the following:

1.

Ccpy of the operating experience document.

2.

Copy of correspondence which details evalua-tions and rec,mmendations (DER form).

3.

Copy of correspondence which delineates actions taken on recommendations (GER form).

4.

Copy of correspondence sent off site to report action taken, if applicable (example:

SILs).

5.

Final "close out" document (DER form).

5.4 The Assistant to the Resident Manager for licensing is responsible for ensuring that action dates specified on the OER form are compatible with the requirements for

/

responsee or other action required by the NRC when f

required.-

r-Rev. No.

2 Date 10/25/83 Page 4

of 19 a

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT

~

PLANT STANDING ORDER TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PSD #28 6.0 SPECIAL INSTRUCTIONS / PRECAUTIONS 6.1 It is crucial that any action commitment (procedure change, training, maintenance, modification, etc.) made to an outside agency, be fully understood by all affected supervisory personnel prior to finalizing a commitment.

"6. 2 To prevent contradictions, training initiated to

~

implement lessons learned from operating experience review shall normally be provided to plant personnel via the Training Superintendent after approval by the Superintendent of Power.

6.3 Significant Operating Experience Reports (SOER) prepared by INPO involved a great deal of analysis and integration of industry recommendations.

As a matter of policy, INPD SOER recommendations will be considered for implementation without modification.

If plant conditions are such that the recommendations cannot by physically implemented, alternate actions will be implemented after approval of the Resident Manger.

6.4 All experience reports should be reviewed from a generic viewpoint (e.g., valve problems at a PWR should not be declared not applicable unless the experience is reviewed to see that similar p roblems could not occur at JAFNPP).

i 7.0 PROCEDURE 7.1 Generation, Receipt and Routing of Operating Experience Documents 7.1.1 Internal (JAF) generated operating experience documents such as Occurrence Reports (OR) are initiated by Department Superintendents or the Shift Supervisor, in accordance with Reference 3.4 (AP 8.2).

The Shift Technical Advisor (STA) also logs receipt of the document into the operating experience review system and thus initiates the piocess of operating experience review and notification of other-interested industry groups. Detailed [

^-

instructions are contained in section 7.2 and'#-

Rev. No.

2 l

Date 10/25/83 Page 5

o f j9 m___ _ - - - _ -

--.w.w.,m_

.+..r

-4

_ _ ~.

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PSO #28 7.3 of this procedure.

In addition, figure 8.1 illustrates a general flow path of the entire operating experience review process at JAFNPP.

7.1.2 NRC, industry, White Plains Office (Nuclear Generation) and certain INPD generated operating experience documents are routinely received by the Resident Manager's Office as part of the plant mail as described in Reference 3.2 (WACP 10.1.9).

These documents are listed in section 4.1 and are processed as indicated in section 7.2 and 7.3 of this procedure.

In addition, Figure '8.1 11-lustrates a general flow path of the entire 4

operating experience review process at JAFNPP.

7.1.3 INPO Significant Event Reports (SER) are j

received by the PPRS on NOTEPAD.

The PPRS enters the SER in the Operating Experience Status Log and initiates the review process as indicated in section 7.2 and 7.3 of this procedure.

A general flow path of the entire operating experience process at JAFNPP is illustrated in Figure 8.1.

i 7.2 Preliminary Review and Assignment of Detailed Re-view / Evaluation of Operating Experience Documents 7.2.1 JAFNPP Internally Initiated Operating Exper-ience.

7.2.1.1 The On-Shift STA (or other individual assigned by PPRS during plant outage periods) logs the OR into the Operating 4

Experience Status Log (Exhibit 9.1) following initiation, preliminary classification and critique (if any) by the Shift Supervisor / Department Super-intendent and performs a review /evalua-tion of the OR. (Exhibit 9.2)

/

gm e

- n. n -

i Rev. No.

3 Date 9/13/84 Page 6

of 19

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PSD #28 The STA evaluation / comments (keeping in mind that review and comments at this time are preliminary) should attempt to address the followings a.

An evaluation of the actual and potential effects of the event which resulted in initiation of the

~

~

OR.

b.

an evaluation or comments with respect to the propriety of the immediate action taken to correct (or terminate) the condition which existed and resulted in initiation of the OR.

c.

The root cause of the event which resulted in initiation of the OR if the root cause can be readily determined at this point in time, d.

Reportability as required by NUREG 1022, Licensee Event Report System through Supplement 1.

7.2.1.2 The STA comment / evaluation is attached to the OR and forwarded to the Operation Superintendent for his review in accordance with AP 8.2, and a copy of the STA comments are forwarded to the PPRS.

NOTE:

No additional action (review, evaluation, recommendation, or other comment) is required of the PPRS for OR's unless as part of the PORC Review of the OR and subsequent LER (if any) addition action is specifical-ly assigned.

7.2.2 Industry and Nisclear Generation' Initiated Operatin'g Experience

/

Rev. No.

3 Date _

9/13/84 p.g.

7 or j9

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT i

PLANT STANDING ORDER TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PSO #28 7.2.2.1 Operating experience documents received by the Resident Manager's Office are reviewed by the Resident Manager as part of the daily mail and are routinely assigned to the PPRS.

Those Operating Experience Documents which the Resident Manager determines are significant and require immediate evaluation may be directly assigned to a

respodsible individual (RI).

A copy is also provided to the PPRS.

7.2.2.1.1 the Resident Manager's Office also opens an ARMS action item cor-responding to the Responsible Individual (PPRS or other RI) assigned in paragraph 7.2.2.1 above.

7.2.3 INPO initiated Operating Experience (NETWORK) 7.2.3.1 Significant Event Reports (SER) received on NETWORK are entered in the Operating l

Experience Status Log by the PPRS and then reviewed and assigned as indicated in paragraph 7.3.

7.3 Detailed Review, Evaluation and Recommendations 7.3.1 The PPRS enters those operating experience documents that have not yet been entered in the Operating Experience Status Log (Exhibit 9.1) and reviews the document for applic-ability to JAFNPP.

Documents determined to be not applicable (NA) are so noted on the Operating Experience Review (GER) form and the form is routed to the Superintendent of Power for approval (paragraph 7.3.7).

7.3.2 For those documents which are applicable and have not already been assigned to a Respon-sible Individual (RI) by the Resident Manager the PPRS assigns an individual as the Responsible Individual and assigns a due date to the task.'

The ' PPR5' will also' route /

pertinent information to' the Training Department for dissemination.

This dis-Rev. No.

3 Date 9/13/84 Page 8

of 19

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PSD #28 tribution will bring the matter to the attention of the affected personnel while procedural, equipment or training revisions are under consideration.

NOTE: Responsible Individual assignment will normally be made to personnel within the Performance and Reliability, staff,

however, some operating experience documents may (due to complexity or the nature of the subject matter of the document) require assignment to a

department superintendent or others outside of the Performance and Relie-bility staff.

7.3.3 The assigned Responsible Individual reviews the Operating Experience Document, evaluates its impact and makes a recommendation with respect to disposition.

Those documents which are determined to be not applicable (NA) to JAFNPP are so noted on the OER form and the form is routed to the Superintendent of Power for approval (paragraph 7.3.7).

7.3.4 For those documents which are applicable to JAFNPP, the recommendation is forwarded to the appropriate Department Superintendent (s) for review / evaluation of the recommendations.

If the Department Superintendent is in agreement with the recommendations of the RI, the document is forwarded to the Super-Intendent of Power for approval.

7.3.5 When the Department Superintendent is in disagreement with the recommendation of the RI, then an attempt to resolve the dis-agreement is made and the recommendation is forwarded to the Superintendent of Power.

If the recommendations can not be resalved, the document is forwarded to the Superintendent

/

of Power for resolution and a determination

/

as'toothe* action to be"taken for the oper- #

ating' experience document of concern.

Rev. No.

3 Date 9/13/84 Page 9

of 19 i

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER i

I TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PS0 #28 7.3.6 Following review by the Responsible Individu-al and concurrence by the Department Super-intendent, the Superintendent of Power reviews the recommendation.

If the Super-intendent of Power disagrees with the recommendation, the document is returned to I

the PPRS for a second review, evaluation and formulation of recommendations as required in paragraphs 7.3.1 through 7.3.5 above.

7.3.7 The PPRS will select site ors appropriate for industry release on the criteria of event significance or generic impact potential. The event description will be routed to the SDP for accuracy verification and release authorization.

A copy of the final document will be retained with the OER.

7.4 Approval and Action Assignment 7.4.1 Following review, the Superintendent of Power approves the recommendations, assigns action and a due date to implement the recommenda-tion. This action assignment includes one or more of the followings a.

Assignment to one or more Department Superintendent (s) to initiate procedure changes, modifications and so on.

b.

Assignment to the Training Superintend-ent to initiate training associated with the procedure change or modification as appropriate.

c.

Assignment to the PPRS to initiate notification of other utilities via NETWORK or other means as appropriate.

l d.

Initiate a

request for outside as-sistance (Nuclear Generation, GE, etc.)

via the Resident Manager if,appropri-ate.

er Initiate "via the-Resident

  • Manager's,/

Office change or additions to the ARMS action items as required.

Rev. No.

3 Date -

g/12/g4 Page 10 of 19

~

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER I

TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PSD #28 f.

Assignment to the PPRS to close those documents which were determined to be not applicable to JAFNPP.

7.4.2 Not applicable items are forwarded directly to the Resident Manager's Office for close out of the ARMS item.

" 7. 5 Action Completion, Close Out and Documentation.

~

7.5.1 The Department Superintendent (s) assigned l

action in paragraph 7.3.7 above, complete the l

assigned action and inform the Resident l

Manager of the completion by transmitting the signed OER form to the Resident Manager.

l 7.5.2 The Resident Manager's Office closes the appropriate ARMS item and forwards the OER form the PPRS.

7.5.3 The PPRS closes the item in the Operating Experience Status Log and forwards a copy of the OER form (and attachments if required) to the Manager of Operational Evaluation.

Those items which were determined to be not applicable to JAFNPP are also closed by the PPRS following approval by the Superintendent of Power and closing of the ARMS open item by the Resident Manager's Office.

7.6 Periodic Reports l

7.6.1 The PPRS shall review the Operating Experi-i ence Status Log monthly and note his review by a line entry on the log.

7.6.2 Copies of the Operating Experience Status Log shall be distributed for review by the personnel listed below, at the intervals listed.

Manager of Operational Evaluation

, Monthly Technical Services Superintendent - Quarterly j

Resident Manager - Semi-annually Superintendent ~of' Power'-~ Semi-annually'

[

.~

Rev. No.

3 Date 9/13/84 Page 11 of 19

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PSD #28 8.0 FIGURES 8.1 Flow Diagram of Operating Experience Review.

l 9.0 EXHIBITS 9.1 Operating Experience Status Log i

i 9.2 OER Form I

9.3 OER FORM ADDENDUM i

1

  • 'd' e

. '; / 5 - 6,

-(

64,_

. A,. s ::

Rev. No.

3 Date -

4 /11/ R 4 Page 12 of 19

)

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT

~

PLANT STANDING ORDER TITLE:

OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PSD #28 FIGURE 8.1 aAr 1:::new. I 7.1.1
ac n:atstav I 7.1.2 c:eo l7.1.3 7

" ^ ^ " ' * *

  • occumaz umer
ma, race,teca
ma:, sn.. in.,

STR,100F21.

Ec:m7:axira mmum.

anca ir 1r 1r I

TTRS l 7.2.3.1 STA l7.2.1.1 Rt l 7.2. 2.1

-tm

-wazrt 1x ir m

l7.2.1.1

{

n" tau"dit
EslSI

/ ),?

"C""

m 5,

i MV om

( cry to ms 3

3 1r ir 1c4 l 7.2.2.1.1 1'

I OPS SIFr l 7.2.1.2

-O!UI ARS IIDt

-RDTIDi IA'.J AP 8.2 i

3r

' J r'

1r m \\s

/: igm, m

('

-Assla

,J f.h;ff*1$&

)

?$Y$h R f}[f7f]; fib"k*$h$f{;:, w- { Rev. No. 3 Date - 9/13/84 p g, 33 or 39

NEW YORK POWER AUTHORITY ~ JAMES A. FIIZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER IITLE: OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PS0 #28 FIGURE 8.1 (Continued) m/ :52L N r'

-mntee /os ~ 5 n,c E n m \\ otsx m -uaz/otsum } MW N M RESG.VE r-1sunnet: V i A l'" -RDl34 SOP l 7.3.5 .""m$tsE -trmecz Ac:Im x M'V xm i I L. ,j v 9P 90P l7.4.1 .Amat -AsSIG4 AC:IGI w y n. ~. f..,,9 ,5 f~, Rev. No. 3 Date - 9/13/84 Page 14 of 19

NEW YORK POWER AUTHORITY ~ JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER IITLE: OPERATING EXPERIENCE FEEDBACK + PROC. NO: PS0 #28 FIGURE 8.1 (Continued) 4 A U f 3 i 0 1r V T I PPPS

7. 4.1. c l

. SrP/P."

  • 4 1. d i TNITIAIE CL'IGODC

, -D.ITIAIE RE3LEST 4 ,N

FOR OL"SI Z ASSIST l t

MAliDS ,j(, I f ir i 9 DS(s) l7.5.1 M' l 4Ie -CIM'IIIE ACT. IGI -CFC3/OiK C ARS 11D4(s) (m A 9r let l7.5.2 -CIDSE ARMS ITDi(s) T I PPRS l 7.6 l PPRS l7.5.3 -FERIC01C PD*IDJ -CIDSE (STATi.S IDC) 6' -FIII i -PERIODIC REIVfCS -CDPY TO ?E IIIXED: Rt - RESIIDT MA%aERS PPRS - PIRfr PERITSPK:C OFTIC KO PH.IABILITY SL'!TR'."ISOR SOP - SLTERDCCMT lE - PANAER APERMIGiAI. OF IUER D'AILATIO1 ARS - AL'IQtATED RECUC6 RI - RESPGsIBII UC3".DCAL l'AwrC.T SYSInt DS - DEIT. SLTERI'CCCCT ( \\ - REStos - M nonm:AL. cRote usa cIas (ABREVIAIID) D57R1LTIQG gg j W Y,WS ' : s i ~ ~ Rev. No. 3 Date. 9/13/84 Page 15 of 19'

NEW YORK POWER AUTHORITY JAMES A. FliZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE: OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PSD #28 EXHIBIT 9.1

? I (FfRAllPC f tPIRip pict SIAlus LOC s ERIAL 00C. DATE ASSICK D ou[ MIC AcilON/legr0 ACIION ACI!ON ND. NO. NCDD SUSXCI KVIEWR DA TE SIAtus AsstG6KNI lyPE DLE N EIED REMS I,.. ,s m. ,../l Rev. No. 3 Date. 9/13/84 Page 16 of 19

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE: OPERATING EXPERIENCE FEED 8ACK* PROC. NO: PSO #28 EXHIBIT 9.2 OPERATING EXPERIENCE REPORT Serial No. Source (Specify Document Number Where Applicable) NRCN - NRC8 - NRCG - NRCC - INP0/SER - SOER - O&MR - CE/SIL - TIL - Other - Review Assignment Date Assigned Reviewer Due Date Applicability (Attach Comments on Addendum Sheet, if required.) j Recommendations (Attach Recommendations on Addendum Sheet, one' l sheet per department, if required.) i 4 h / Reviewer's 5ignature Date / y.. / ~ , o 4 Rev. No. 3 Date - 9/13/84 Page 17 of 19

NEW YORK POWER AUTHORITY JANES A. FITZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE: OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PSO #28 EXHIBIT 9.2 (Continued)

Department Superintendent Res t e n / Coms.a t ment (Attach Addendat af required: i Approval D a s ap;ir o v a l Action Due Date Comments: 1 APPROWAL I Superintendent of Power Dat e f Comments: i, i l Date ARMS Art non Reassign D a t t-A-tton Lomplete. / Signat ure cay l,. 2;,, s, ?' '~ r Date ULR Complete y-s l 31gnature s Rev. No. 3 Date. 9/13/84 Page 18 of 1'9

NEW YORK POWER AUTHORITY JAMES A. FI?ZPATRICK NUCLEAR POWER PLANT PLANT STANDING ORDER TITLE: OPERATING EXPERIENCE FEEDBACK

  • PROC. NO: PS0 #28 EXHIBIT 9.3 ADDENDUM Operating Experience Report Serial No.

Applicability Comments Recommendation Comments Department Comments i I i 1 .,/

  • -F-