ML20128G639
| ML20128G639 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 07/02/1985 |
| From: | CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20128G615 | List: |
| References | |
| (1520MAT), NLS-85-181, NUDOCS 8507090263 | |
| Download: ML20128G639 (3) | |
Text
ENCLOSURE 1 TO SERIAL: NLS-85-181 4
REVISED BRUNSWICK-1 AND BRUNSWICK-2 TECHNICAL SPECIFICATION PAGES l
8507090263 850702 PDR ADOCK 05000324 P
PDR (1520 MAT)
r (BSEP-1-19) 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT PRIMARY CONTAINMENT INTECRITY LIMITING CONDITION FOR OPERATION 3.6.1.1 PRIMARY CONTAINMENT INTEGRITY shall be maintained.
APPLICABILITY: CONDITIONS 1, 2, and 3.
ACTION:
Without PRIMARY CONTAINMENT INTECRITY, restore PRIMARY CONTAINMENT INTEGRITY within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
-SURVEILLANCE REQUIREMENTS 4.6.1.1 PRIMARY CONTAINMENT INTECRITY shall be demonstrated:
a.
At least oneg per 31 days by verifying that all primary containment penetrations ~ not capable of being closed by OPERABLE containment automatic isolation valves and required to be closed during accident conditions are closed by valves, blind flanges, or deactivated automatic valves secured in position, except as provided in Table 3.6.3-1 or Specification 3.6.3.
b.
By verifying each primary containment air lock OPERABLE per Specification 3.6.1.3.
By verifying the suppression pool OPERABLE per Specification 3.6.2.1.
c.
- Except valves, blind flanges, and deactivated automatic valves which are located inside the containment, the MSIV Pit, the RWCU Penetration Triangle Room, or the TIP Room, and are locked, sealed, or otherwise secured in the closed position. These penetrations shall be verified closed during each COLD SHUTDOWN except such verification need not be performed when the primary containment has not been de-inerted since the last verification or more often than once per 92 days. Those valves located above the drywell head requiring head shield block removal for verification will be verified prior to each replacement of the shield blocks.
BRUNSWICK - UNIT 1 3/4 6-1 Amendment No.
4t (BSEP-2-19)
, s vl r
~
3/4.6' CONTAINMENT SYSTENS
/
I H
3/4.6.1 PREMARY CdNTAINMENT t
..PR' MARY CONTAIEMENTi1NTECRITY'
\\
j H-l ILIMITINGCONDIhIOM'FOROPERATION 3.6.1.1 PRIMARY CONTAINMENT INTEGRITY shall be maintained.
i, APPLICABILITY: CONDITCONS 1, 2, and 3.
1 ACTION:
l l
Without PRIMARY CONTAINMENT INTECRITY, restore PRIMARY CONTAINMENT INTECRITY within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or be 'in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTD071l; within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.1.1 PRIMARY CONTAINMENT INTEGRITY shall be demonstrated:
At least oncg per 31 days by verifying that all primary containment a.
penetrations not capable of being closed by OPERABLE containment automatic isolation valves and required to be closed during accident conditions are closed by valves, blind flanges, or deactivated automatic valves secured in position, except as provided in Table 3.6.3-1 or Specification 3.6.3.
l b.
By verifying each primary containment air lock OPERABLE per l
[
Specification 3.6.1.3.
I
\\
i By va'rifying the suppression pool OPERABLE per Specification 3.6.2.1.
c.
,1 2
\\
f I
-i t
<' 1 4
hi j
- Except valves, blind flanges, and deactivated automatic valves which are 3
located inside the containment, the MSIV Pit, the RWCU Penetration Triangle i
Room, or the TIP Room, and are locked, sealed, or otherwise secured in the c'losed position. These peneErations shall be verified closed during each COLD SHUTCOWN except such verification need not be performed when the primary! containment has not been de-inerted since the last verification or more often than once per 92= days. Those valves located above the drywell head requiring head shield block removal for verification will be verified prior to each replacement of the shield blocks.
- r BRUNSWICK - UNIT,2~
3/4 6-1 Amendment No.
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _